Semantic search

Jump to: navigation, search
Search

Edit query Show embed code

The query [[Category:Project]] [[Site::Nine Mile Point]] was answered by the SMWSQLStore3 in 0.4467 seconds.


Results 1 – 50    (Previous 50 | Next 50)   (20 | 50 | 100 | 250 | 500)   (JSON | CSV | RSS | RDF)
 Issue dateTitleTopic
EPID:L-2019-LRM-007511 December 2019Summary of November 18, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Supplemental Valve Position Indication Testing Requirements
EPID:L-2019-LRM-008620 November 2019Presentation Slides for November 20, 2019, Pre-Application Meeting - Request for Revision to Quality Assurance Program Internal Audit Frequency
EPID:L-2019-LLA-023431 October 2019Provide RISK-INFORMED Extended Completion Times - RITSTF Initiative 4B
EPID:L-2019-LLR-009924 September 2019End of Interval Relief Associated with the Third Ten-Year Inservice Inspection (ISI) Interval
EPID:L-2019-LLA-018528 August 2019License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions
EPID:L-2019-LLA-018323 August 2019License Amendment Request Supporting Emergency Plan Emergency Action Level Change (EAL RAL3)
EPID:L-2019-LLA-013227 June 2019Allowance for Non Technical Specification Barrier Degradation on Supported System Operability
EPID:L-2019-LLA-013726 June 2019License Amendment Request - Administrative Changes to the Technical Specifications
EPID:L-2019-LLA-013326 June 2019Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls
EPID:L-2019-LLA-013125 June 2019Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program
EPID:L-2019-LRM-003010 June 2019Provide RISK-INFORMED Extended Completion Times - RITSTF Initiative 4B
EPID:L-2019-LRM-00244 June 2019June 4, 2019, Public Meeting with Exelon Generation Company, LLC
EPID:L-2019-LLA-011531 May 2019Elimination of Hydrogen Recombiners and Change to Hydrogen and Oxygen Monitors
EPID:L-2019-LLR-003730 April 2019Withdrawal of Various Licensing Actions Involving Three Mile Island Nuclear Station, Unit 1
EPID:L-2019-LLR-001115 February 2019Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping Welds
EPID:L-2019-LLA-00211 February 2019Safety Limit MCPR to COLR
EPID:L-2018-LRM-008419 December 2018Bwrvip/Asme Relief Request Discussion December 19, 2018
EPID:L-2018-LLA-04916 December 2018Emergency License Amendment Request: One Time Extension to the High Pressure Core Spray Completion Time and Associated Surveillances
EPID:L-2018-LRM-008830 November 2018Address Transient Secondary Containment Conditions
EPID:L-2018-LRM-006819 November 2018
EPID:L-2017-LLR-014513 November 2018
EPID:L-2018-LRM-006226 October 2018Allowance for Non Technical Specification Barrier Degradation on Supported System Operability
EPID:L-2018-LLA-011524 August 2018Vogtle Electric Generating Plant - Units 3 and 4, Issuance of Amendments (LAR 18-014) and Granting of Exemptions Containment Sump Level Instrumentation
EPID:L-2018-LLR-007610 July 2018
EPID:L-2018-LLR-007710 July 2018Proposed Alternatives to Utilize Code Cases N-878, N-879, and N-880
EPID:L-2018-LLR-00879 July 2018
EPID:L-2018-LLR-00856 July 2018
EPID:L-2018-LLR-00865 July 2018
EPID:L-2018-LLA-018326 June 2018License Amendment Request - Revise Technical Specification 3.3.1 for Primary Containment Oxygen Concentration
EPID:L-2018-LLR-00888 June 2018Submittal of Relief Requests Associated with the Fifth and Fourth Lnservice Inspection Intervals
EPID:L-2017-LLA-02948 June 2018
EPID:L-2018-LLA-024031 May 2018License Amendment Request for Approval of Changes to Emergency Plan Staffing Requirements
EPID:L-2018-LRM-008030 May 2018Proposed Alternative to Utilize Code Case N-879
EPID:L-2018-LRM-00281 May 2018
EPID:L-2018-LRM-00137 March 2018
EPID:L-2018-LLA-016714 February 2018Revise APRM Channel Adjustment Surveillance Requirement
EPID:L-2018-LLA-00399 February 2018License Amendment Request - Proposed Change to Remove Boraflex Credit from Spent Fuel Racks
EPID:L-2017-LRO-004122 January 2018Nine Mile Point, Unit 1, UFSAR, Rev 25 - Redacted
EPID:L-2018-LLR-005220 December 2017Relief Requests Associated with Fifth and Fourth Ten-Year Lnservice Testing Intervals
EPID:L-2017-LLA-042615 December 2017Reactor Pressure Vessel Water Inventory Control
EPID:L-2017-LLA-023712 December 2017
EPID:L-2017-LRM-006228 November 2017Reactor Pressure Vessel Water Inventory Control
EPID:L-2017-LRO-00599 November 2017County, Limerick, Nine Mile Point, Oyster Creek, Peach Bottom, Quad Cities, R. E. Ginna, Three Mile Island - 2017 Annual Report- Guarantees of Payment of Deferred Premiums
EPID:L-2017-LLA-03788 November 2017Address Transient Secondary Containment Conditions
EPID:L-2017-LLA-03733 November 2017License Amendment Request - Safety Limit Minimum Critical Power Ratio Change
EPID:L-2017-LLR-01341 November 2017County, Nine Mile Point, Oyster Creek, Quad Cities, Submittal of Relief Request for an Alternative to the ASME Code - Revise Main Steam Isolation Valve Partial Stroke Testing Frequency
EPID:L-2014-JLD-000417 October 2017
EPID:L-2017-LRM-004225 September 2017Meeting Slide for Teleconference with Exelon Generation Company, LLC - Criticality Analysis for NMP1 Boraflex Racks: No Boraflex Credit, 3 Out of 4 Loading, and Cell Blockers
CAC:MG008720 September 2017
CAC:MF794629 August 2017