 Start dateStatusTitleTopic
EPID:L-2023-LLE-00132 May 2023Approved
Closed
License Amendment Request to Use Framatome Small Break and Realistic Large Break Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limits and Exemption Request for Use of M5 Cladding
EPID:L-2022-LRO-014227 October 2022Approved
Closed
End of Cycle 21 Steam Generator Tube Inspection Report
EPID:L-2022-LLA-007825 May 2022Approved
Closed
TSTF-554
EPID:L-2022-LLA-00523 May 2022Approved
Closed
TSTF-359
EPID:L-2021-LLR-008717 November 2021Approved
Closed
Alternative Request IR-4-09 for Use of an Alternative Brazed Joint Assessment Methodology to Demonstrate Structural Integrity of Class 3 Moderate-Energy Piping
EPID:L-2021-LLA-01862 November 2021Approved
Closed
TSTF-569
EPID:L-2021-LRO-000627 April 2021Approved
Closed
EPID:L-2021-LLT-000010 March 2021Approved
Closed
Units 1 and 2, Request for Approval of Appendix E of Fleet Report DOM-NAF-2-A Modeling Error Correction
EPID:L-2021-LLA-002322 February 2021Approved
Closed
TSTF-547
TSTF-54
EPID:L-2020-LLA-026611 January 2021Approved
Closed
EPID:L-2020-LLR-015817 December 2020Approved
Closed
Proposed Alternative Requests RR-05-04 and IR-4-02, Use of Alternative Pressure/Flow Testing Requirements for Service Water System Supply Piping
EPID:L-2020-LLE-022716 December 2020Approved
Closed
EPID:L-2019-LRO-010616 December 2020Approved
Closed
EPID:L-2020-LLE-014524 November 2020Approved
Closed
EPID:L-2020-LLS-000219 November 2020Approved
Closed
Proposed License Amendment Request Measurement Uncertainty Recapture Power Uprate
EPID:L-2020-LLR-013023 September 2020Approved
Closed
ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations Performed in the Third Period of the Fourth 10-Year Inspection Interval
EPID:L-2020-LLA-017811 August 2020Approved
Closed
Connecticut. Inc. Millstone Power Station Unit 3, Proposed License Amendment Request for a One-Time Extension of the Millstone Unit 3 Steam Generator Inspections
EPID:L-2020-LLR-008116 July 2020Approved
Closed
EPID:L-2020-LLR-009715 July 2020Approved
Closed
Alternate Request RR-05-06 - Inspection Interval Extension for Steam Generator Pressure Retaining Welds and Full-Penetration Welded Nozzles
EPID:L-2020-LLA-00948 April 2020Approved
Closed
Notice of Category 3 Public Meeting - Annual Assessment Meeting for Millstone Power Station
EPID:L-2020-LLR-003814 March 2020Approved
Closed
Alternative Request IR-4-03 for Use of an Alternative Non-Code Methodology to Demonstrate Structural Integrity of Class 3 Moderate-Energy Piping
EPID:L-2020-LLA-00393 March 2020Approved
Closed
License Amendment Request to Revise Technical Specification Table 3.3-11, Accident Monitoring Instrumentation
EPID:L-2020-LLA-024228 February 2020Approved
Closed
Proposed License Amendment Request, Addition of Analytical Methodology to the Core Opera Ting Limits Report for a Full Spectrum Loss of Coolant Accident (Fsloca) Gamma Energy Redistribution Information
EPID:L-2020-LLA-022724 February 2020Approved
Closed
TSTF-510
TSTF-577, TSTF-510
TSTF-577
EPID:L-2020-LLA-002719 February 2020Approved
Closed
TSTF-510
TSTF-577, TSTF-425
TSTF-52
EPID:L-2020-LLR-002817 February 2020Approved
Closed
ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations Performed in the Second Period of the Third 10-Year Inspection Interval
EPID:L-2020-LLR-002411 February 2020Approved
Closed
ASME Section XI Inservice Inspection Program: Relief Request for Limited Coverage Examinations Performed in the Second Period of the Fourth 10-Year Inspection Interval
EPID:L-2019-LLA-028817 December 2019Approved
Closed
License Amendment Request to Revise TS 6.25, Pre-Stressed Concrete Containment Tendon Surveillance Program
EPID:L-2019-LLA-01656 September 2019Approved
Closed
EPID:L-2019-LLA-01646 September 2019Approved
Closed
EPID:L-2019-LLA-000827 February 2019Approved
Closed
12/17/2019 E-mail from S. Sinha to R. Guzman - Proposed License Conditions for License Amendment Request 10 CFR 50.69
EPID:L-2019-LLA-00035 February 2019Approved
Closed
Independent Spent Fuel Storage Installation (Isfsi); North Anna, Units 1 and 2 and ISFSI; and Surry, Units 1 and 2 and ISFSI - License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Rev. 6.
EPID:L-2019-LLA-017717 January 2019Approved
Closed
TSTF-425, TSTF-425
EPID:L-2018-LLA-01263 May 2018Approved
Closed
License Amendment Request Regarding Proposed Technical Specifications Changes for Spent Fuel Storage and New Fuel Storage
EPID:L-2018-LLA-00994 April 2018Approved
Closed
License Amendment Request to Revise Technical Specification Action Statement for Loss of Control Building Inlet Ventilation Radiation Monitor Instrumentation Channels
EPID:L-2017-LLA-03164 October 2017Approved
Closed
Proposed License Amendment Request to Revise Integrated Leak Rate Test (Type a) and Type C Test Intervals
CAC:MF984415 June 2017Approved
Closed
CAC:MF965528 April 2017Approved
Closed
CAC:MF85075 January 2017Approved
Closed
CAC:MF893519 December 2016Approved
Closed
CAC:MF949714 December 2016Approved
Closed
CAC:MF878928 October 2016Approved
Closed
CAC:MF84686 October 2016Approved
Closed
CAC:MF67094 August 2016Approved
Closed
CAC:MF821028 July 2016Approved
Closed
CAC:MF776125 May 2016Approved
Closed
CAC:L5312123 May 2016Approved
Closed
CAC:MF729712 May 2016Approved
Closed
CAC:MF396815 March 2016Approved
Closed
CAC:MF643025 February 2016Approved
Closed