Semantic search
Jump to navigation
Jump to search
Start date | Status | Title | Topic | |
---|---|---|---|---|
EPID:L-2023-LLE-0013 | 2 May 2023 | Approved Closed | License Amendment Request to Use Framatome Small Break and Realistic Large Break Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limits and Exemption Request for Use of M5 Cladding | |
EPID:L-2022-LRO-0142 | 27 October 2022 | Approved Closed | End of Cycle 21 Steam Generator Tube Inspection Report | |
EPID:L-2022-LLA-0078 | 25 May 2022 | Approved Closed | TSTF-554 | |
EPID:L-2022-LLA-0052 | 3 May 2022 | Approved Closed | TSTF-359 | |
EPID:L-2021-LLR-0087 | 17 November 2021 | Approved Closed | Alternative Request IR-4-09 for Use of an Alternative Brazed Joint Assessment Methodology to Demonstrate Structural Integrity of Class 3 Moderate-Energy Piping | |
EPID:L-2021-LLA-0186 | 2 November 2021 | Approved Closed | TSTF-569 | |
EPID:L-2021-LRO-0006 | 27 April 2021 | Approved Closed | ||
EPID:L-2021-LLT-0000 | 10 March 2021 | Approved Closed | Units 1 and 2, Request for Approval of Appendix E of Fleet Report DOM-NAF-2-A Modeling Error Correction | |
EPID:L-2021-LLA-0023 | 22 February 2021 | Approved Closed | TSTF-547 TSTF-54 | |
EPID:L-2020-LLA-0266 | 11 January 2021 | Approved Closed | ||
EPID:L-2020-LLR-0158 | 17 December 2020 | Approved Closed | Proposed Alternative Requests RR-05-04 and IR-4-02, Use of Alternative Pressure/Flow Testing Requirements for Service Water System Supply Piping | |
EPID:L-2020-LLE-0227 | 16 December 2020 | Approved Closed | ||
EPID:L-2019-LRO-0106 | 16 December 2020 | Approved Closed | ||
EPID:L-2020-LLE-0145 | 24 November 2020 | Approved Closed | ||
EPID:L-2020-LLS-0002 | 19 November 2020 | Approved Closed | Proposed License Amendment Request Measurement Uncertainty Recapture Power Uprate | |
EPID:L-2020-LLR-0130 | 23 September 2020 | Approved Closed | ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations Performed in the Third Period of the Fourth 10-Year Inspection Interval | |
EPID:L-2020-LLA-0178 | 11 August 2020 | Approved Closed | Connecticut. Inc. Millstone Power Station Unit 3, Proposed License Amendment Request for a One-Time Extension of the Millstone Unit 3 Steam Generator Inspections | |
EPID:L-2020-LLR-0081 | 16 July 2020 | Approved Closed | ||
EPID:L-2020-LLR-0097 | 15 July 2020 | Approved Closed | Alternate Request RR-05-06 - Inspection Interval Extension for Steam Generator Pressure Retaining Welds and Full-Penetration Welded Nozzles | |
EPID:L-2020-LLA-0094 | 8 April 2020 | Approved Closed | Notice of Category 3 Public Meeting - Annual Assessment Meeting for Millstone Power Station | |
EPID:L-2020-LLR-0038 | 14 March 2020 | Approved Closed | Alternative Request IR-4-03 for Use of an Alternative Non-Code Methodology to Demonstrate Structural Integrity of Class 3 Moderate-Energy Piping | |
EPID:L-2020-LLA-0039 | 3 March 2020 | Approved Closed | License Amendment Request to Revise Technical Specification Table 3.3-11, Accident Monitoring Instrumentation | |
EPID:L-2020-LLA-0242 | 28 February 2020 | Approved Closed | Proposed License Amendment Request, Addition of Analytical Methodology to the Core Opera Ting Limits Report for a Full Spectrum Loss of Coolant Accident (Fsloca) Gamma Energy Redistribution Information | |
EPID:L-2020-LLA-0227 | 24 February 2020 | Approved Closed | TSTF-510 TSTF-577, TSTF-510 TSTF-577 | |
EPID:L-2020-LLA-0027 | 19 February 2020 | Approved Closed | TSTF-510 TSTF-577, TSTF-425 TSTF-52 | |
EPID:L-2020-LLR-0028 | 17 February 2020 | Approved Closed | ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations Performed in the Second Period of the Third 10-Year Inspection Interval | |
EPID:L-2020-LLR-0024 | 11 February 2020 | Approved Closed | ASME Section XI Inservice Inspection Program: Relief Request for Limited Coverage Examinations Performed in the Second Period of the Fourth 10-Year Inspection Interval | |
EPID:L-2019-LLA-0288 | 17 December 2019 | Approved Closed | License Amendment Request to Revise TS 6.25, Pre-Stressed Concrete Containment Tendon Surveillance Program | |
EPID:L-2019-LLA-0165 | 6 September 2019 | Approved Closed | ||
EPID:L-2019-LLA-0164 | 6 September 2019 | Approved Closed | ||
EPID:L-2019-LLA-0008 | 27 February 2019 | Approved Closed | 12/17/2019 E-mail from S. Sinha to R. Guzman - Proposed License Conditions for License Amendment Request 10 CFR 50.69 | |
EPID:L-2019-LLA-0003 | 5 February 2019 | Approved Closed | Independent Spent Fuel Storage Installation (Isfsi); North Anna, Units 1 and 2 and ISFSI; and Surry, Units 1 and 2 and ISFSI - License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Rev. 6. | |
EPID:L-2019-LLA-0177 | 17 January 2019 | Approved Closed | TSTF-425, TSTF-425 | |
EPID:L-2018-LLA-0126 | 3 May 2018 | Approved Closed | License Amendment Request Regarding Proposed Technical Specifications Changes for Spent Fuel Storage and New Fuel Storage | |
EPID:L-2018-LLA-0099 | 4 April 2018 | Approved Closed | License Amendment Request to Revise Technical Specification Action Statement for Loss of Control Building Inlet Ventilation Radiation Monitor Instrumentation Channels | |
EPID:L-2017-LLA-0316 | 4 October 2017 | Approved Closed | Proposed License Amendment Request to Revise Integrated Leak Rate Test (Type a) and Type C Test Intervals | |
CAC:MF9844 | 15 June 2017 | Approved Closed | ||
CAC:MF9655 | 28 April 2017 | Approved Closed | ||
CAC:MF8507 | 5 January 2017 | Approved Closed | ||
CAC:MF8935 | 19 December 2016 | Approved Closed | ||
CAC:MF9497 | 14 December 2016 | Approved Closed | ||
CAC:MF8789 | 28 October 2016 | Approved Closed | ||
CAC:MF8468 | 6 October 2016 | Approved Closed | ||
CAC:MF6709 | 4 August 2016 | Approved Closed | ||
CAC:MF8210 | 28 July 2016 | Approved Closed | ||
CAC:MF7761 | 25 May 2016 | Approved Closed | ||
CAC:L53121 | 23 May 2016 | Approved Closed | ||
CAC:MF7297 | 12 May 2016 | Approved Closed | ||
CAC:MF3968 | 15 March 2016 | Approved Closed | ||
CAC:MF6430 | 25 February 2016 | Approved Closed |