ML20212J910 | 1 October 1999 | Forwards SE Accepting Licensee 990916 & 27 Relief Requests IWE-3 for Plant.Se Addresses Only IWE-3 Due to Util Urgent Need for Relief.Requests IWE-7 & IWE-8 Will Be Addressed at Later Date | VT-2 |
ML20211N253 | 8 September 1999 | Responds to Request to Exceed 60,000 Mwd/Mtu Lead Rod Burnup in Small Number of Fuel Rods in North Anna Unit 2.Informs That NRC Offers No Objection to Requested Use of Rods in Reconstituted Fuel Assembly.Se Supporting Request Encl | |
ML20211J221 | 31 August 1999 | Approves Request to Remove Augmented ISI (Aii) Program for RCS Bypass Lines from North Anna Licensing Basis.Se Re Request to Apply LBB to Eliminate Augmented Insp Program on RCS Bypass Lines Encl | |
ML20210T067 | 13 August 1999 | Informs of Completion of Review of Proposed Revs of Schedule for Withdrawal of Rv Surveillance Capsules Submitted by VEPCO on 981217.Approves Proposed Revs.Forwards Safety Evaluation | |
ML20210N292 | 5 August 1999 | Discusses Which Submitted Proposed TSs Bases Change for Containment Leakage. Licensee Changes to Bases May Be Subj to Future Insps or Audits | |
ML20209E371 | 2 July 1999 | Forwards Insp Repts 50-338/99-03 & 50-339/99-03 on 990425-0605.Violations Being Treated as Noncited Violations | |
ML20196G258 | 23 June 1999 | Discusses Closure of GL 92-01,rev 1,suppl 1,reactor Vessel Structural Integrity | |
ML20206U744 | 20 May 1999 | Informs That NRC Unable to Conclude That NAPS Has Met Intent of Supplement 4 to GL 88-20.RAI Re Fire Area of IPEEE Encl. Response Requested within 90 Days of Submittal Date | Hot Short Probabilistic Risk Assessment |
ML20207A854 | 20 May 1999 | Forwards RAI Re Licensee Listed Responses to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves. Response Requested within 90 Days of Submittal Date | Loop seal Stroke time |
ML20206L466 | 10 May 1999 | Forwards SE Accepting Request to Delay Submitting Plant, Unit 1 Class Piping ISI Program for Third Insp Interval Until 010430,to Permit Development of Risk Informed ISI Program for Class 1 Piping | |
ML20206P640 | 5 May 1999 | Refers to Public Meeting Conducted at North Anna Power Station on 990413 to Discuss Results of North Anna Plant Performance Review.List of Attendees Encl | |
ML20205S032 | 21 April 1999 | Forwards SER Accepting Util 980804 Requests for Relief from Certain Requirements of Subsections IWE & Iwl of 1992 Addenda of ASME Section Xi.Alternatives for IWE2,IWE4,IWE6 & IWL2,authorized Pursuant to 10CFR50.55a(a)(3)(ii) | |
ML20205Q245 | 12 April 1999 | Forwards Insp Repts 50-338/99-01 & 50-339/99-01 on 990131- 0313.Three Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy | |
ML20205T141 | 9 April 1999 | Informs That on 990407,A Royal & Ho Christensen Confirmed Initial Operator Licensing Exam Scheduled for Y2K.Initial Exam Dates Scheduled for Wks of 000925 & 1002 for Approx 11 Candidates | |
ML20196K989 | 29 March 1999 | Confirms Plans to Hold Meeting on 990413 at North Anna Nuclear Information Center to Discuss North Anna Plant Performance Review | |
ML20205B564 | 24 March 1999 | Forwards Audit Rept of North Anna Power Station,Units 1 & 2 Conducted on 990126-28 in Glen Allen,Va.Audit Team Assessment of Y2K Project Plan Identified Plan as well-structured,well Organized & Well Implemented | |
ML20196L002 | 24 March 1999 | Discusses Plant Performance Review of North Anna Power Station Completed by NRC on 990205.Found Overall Performance at North Anna to Be Acceptable.Several Examples of Inadequate or Untimely Problem Resolution Were Noted | Systematic Assessment of Licensee Performance Fire Protection Program |
ML20207E133 | 1 March 1999 | Forwards Insp Repts 50-338/98-11 & 50-339/98-11 on 981220- 990130.No Violations Noted.Util Conduct of Activities at North Anna Power Station Generally Characterized by Safety Conscious Plant Operations & Good Maintenance | |
ML20203F868 | 16 February 1999 | Forwards Request for Addl Info Re Util 970527 plant-specific Summary Rept in Response to USI A-46 Program at North Anna Power Station,Units 1 & 2 | Safe Shutdown |
ML20196K368 | 21 January 1999 | Discusses Closure of Tasks Re Generic Implication of part- Length Control Rod Drive Mechanism Housing Leak at Prairie Island,Unit 2 & Anna Power Station,Units 1 & 2 | Non-Destructive Examination Hydrostatic Probabilistic Risk Assessment Operating Basis Earthquake Earthquake Pressure boundary leak |
ML20199K322 | 14 January 1999 | Forwards Insp Repts 50-338/98-10 & 50-339/98-10 on 981108- 1219.No Violations Identified.Conduct of Activities at North Anna Power Station Generally Characterized by safety-conscious Plant Operations | |
ML20198S392 | 6 January 1999 | Forwards Request for Addl Info on Resolution of USI A-46 for North Anna Power Station,Units 1 & 2 | Safe Shutdown Earthquake |
IR 05000338/1998005 | 6 January 1999 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-338/98-05 & 50-339/98-05 on 981105 | |
ML20198H895 | 22 December 1998 | Forwards Corrected Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval & Se.Authorization Ltr Erroneously Dtd as 981103 & End Dates of Second 10-yr Insp Intervals Incorrect | |
ML20198P040 | 14 December 1998 | Refers to 981210 Open Meeting at Licensee Request at Region II Re Weld Discrepancies Identified on Various Auxiliary Feedwater Sys Pipe Supports During Safety Sys Engineering Insp.List of Attendees & Util Presentation Handouts Encl | |
ML20196J559 | 8 December 1998 | Submits Correction to Transmittal Ltr ,which Forwarded SE Authorizing Licensee Relief Request Re Rev to NDE-32, Svc Water Sys Leaks, Per 10CFR50.55a(a)(3)(ii). Corrected Date Should Be 981203 | |
ML20198A749 | 4 December 1998 | Confirms 981203 Telcon Between L Hart of Licensee Staff & V Mccree of NRC Re Meeting Scheduled for 981210 in Atlanta, Ga Concerning Pipe Support Potential Construction Errors or Drawing Errors | |
ML20198H934 | 3 December 1998 | Forwards SE Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant,Per Util 970224 Relief Request | Non-Destructive Examination |
ML20196G943 | 2 December 1998 | Advises of Planned Insp Effort Resulting from Insp Planning Meeting,Completed on 981102.Details of Insp Plan for Next 4 Months Encl | High Radiation Area Fire Barrier Enforcement Discretion Coatings Maintenance Rule Program Hourly Fire Watch Siren |
ML20196A658 | 25 November 1998 | Forwards Notice of Withdrawal of 960321 Application for Amends to Licenses NPF-4 & NPF-7 for Plant.Changes Would Have Clarified Requirements for Testing Charcoal Absorbent in Waste Gas Charcoal Filter Sys | |
ML20196B001 | 23 November 1998 | Forwards Emergency Response Data Sys Implementation Documents,Which Include Data Point Library Updates for Listed Plants.Changes Should Be Made to Data Base as Soon as Possible.Without Encl | |
ML20196H395 | 5 November 1998 | Forwards Insp Repts 50-338/98-05 & 50-339/98-05 on 980713- 17,27-31 & 0921-25 & Notice of Violation & Re Failure to Implement Adequate Corrective Actions to Resolve Corrosion of AFW Tunnel Pipe Supports Identified in Sept 1996 | Enforcement Discretion |
ML20196G116 | 3 November 1998 | Forwards Safety Evaluation Authorizing Rev to ISI Program Relief Reuest NDE-32 Re SWS Leaks,Submitted on 980224,for Remainder of Second 10-yr Insp Interval for Each Unit | Non-Destructive Examination |
ML20155H806 | 29 October 1998 | Responds to Discussing NRC Initiatives & Efforts. Plans for Another Stakeholders Meeting Underway for 981113. Staff Will Continue to Solicit Feedback & Comments from Public on Initiatives | |
ML20154Q833 | 21 October 1998 | Informs That Info Submitted in 980911 Application & Affidavit Re WCAP-15063-P, W In-Reactor Creep Model, Marked Proprietary,Will Be Withheld from Public Disclosure Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 | |
ML20154G361 | 7 October 1998 | Informs That Util 951018,960722 Responses to Anomalies Identified in SER Dtd 950924,acceptable & Subject to NRC Inspection.Request for Relief from Valve Quarterly Tests & Proposal to Extend Test Interval,Not Acceptable | Probabilistic Risk Assessment |
ML20155B053 | 2 October 1998 | Forwards Exam Repts 50-338/98-301 & 50-339/98-301 on 980817- 21 & 31-0903.Fourteen Candidates Passed & One Failed Exam | Job Performance Measure |
ML20155B374 | 25 September 1998 | Cancels Meeting Which Was Scheduled for 981109.Purpose of Meeting Was to Discuss SALP for North Anna Power Station. Informs That NRC Has Suspended SALP Program Until Staff Completes Review of NPP Performance Assessment Process | |
ML20239A380 | 2 September 1998 | Confirms 980819 Telephone Conversation Between D Summers & L Garner Re Meeting at NRC Request Which Has Been Scheduled for 981109.Purpose of Meeting Will Be to Discuss SALP for North Anna Power Station | Systematic Assessment of Licensee Performance |
ML20151T935 | 27 August 1998 | Informs of Change Being Implemented by Region II Re Administrative Processing of Licensee Responses to Novs. Licensee NOV Responses Which Accept Violations & Require No Addl Communication to Be Ack in Cover Ltr of Next Insp Rept | |
ML20237E011 | 25 August 1998 | Discusses Completion of Licensing Action for GL 97-05, Steam Generator Tube Insp Techniques, | Nondestructive Examination |
ML20151T553 | 18 August 1998 | Forwards Insp Repts 50-338/98-07 & 50-339/98-07 on 980720-23.No Violations Noted.Insp Observed Selected Portions of Emergency Organization Response in Key Facilities During EP Plume Exposure Exercise | |
IR 05000338/1998001 | 4 August 1998 | Discusses Re Insp Rept Review & Three Clarifications Re Insp Repts 50-339/98-01 & 50-338/98-01 Discussions of Security at ISFSI | |
ML20237B000 | 30 July 1998 | Confirms 980728 Telcon Between D Sommers & R Haag Re Meeting Scheduled for 980810 in Atlanta,Ga to Discuss Recent Mgt Changes & Items of Interest | |
ML20236M029 | 8 July 1998 | Forwards Request for Addl Info Re ASME Section XI Relief Requests NDE-37,through NDE-41 for North Anna Power Station, Unit 1 | Incorporated by reference |
ML20236K545 | 7 July 1998 | Forwards SER Accepting Proposed Change in Commitment on Inservice Insp Program for Protection Against Dynamic Effects Associated W/Postulated Rupture of High Energy Main Steam & Feedwater Piping,In Mechanical Equipment Room | |
ML20236F731 | 29 June 1998 | Forwards Request for Addl Info Related to Fire,Seismic & High Wind,Flood & Other External Events Areas of IPEEE Submittal | Hot Short Safe Shutdown Earthquake |
IR 05000338/1998002 | 25 June 1998 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-338/98-02, 50-339/98-02 & 72-0016/98-02 | |
ML20236J987 | 24 June 1998 | First Final Response to FOIA Request for Documents.Documents Listed in App a Already Available in Pdr.Documents Listed in App B Being Released in Entirety | |
ML20248M038 | 9 June 1998 | Forwards Request for Addl Info Re Revised Loop Stop Valve Operation.Changes Will Modify Requirements for Isolated Loop Startup to Permit Filling of Drained Isolated Loop Via Backfill from RCS Through Partially Opened Loop Stop Valves |