Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20217N55221 October 1999Forwards Operator Licensing Exam Rept 50-331/99-302(OL) for Tests Administered During Wk of 990920.Six Applicants Passed All Sections of Exam & Were Issued Operating Licenses
ML20217H89218 October 1999Forwards SER Accepting Eight of Licensee Relief Requests, NDE-R001,(Part a & B),NDE-R027,NDE-R028,NDE-R029,NDE-R030, NDE-R032 & NDE-R035,one Request Relief NDE-R036,denied & Relief Request NDE-R034 Unnecessary
ML20217F48014 October 1999Provides Individual Exam Results for Applicants Who Took Sept 1999 Initial License Exam.Informs That Info Considered Proprietary & That Listed Info,Supplements & Exam Rept Will Be Issued Shortly
ML20217F7227 October 1999Forwards Insp Rept 50-331/99-11 on 990820-0930.No Violations NotedPower change
ML20212L0415 October 1999Informs That Privacy Info Identified in Util Re Duane Arnold Energy Center Emergency Telephone Book,Rev 61 Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(a)(6) & Section 103(b) of Atomic Energy Act
ML20217A93330 September 1999Informs That NRC Plan to Conduct Addl Insp by Resident Inspectors Beyond Core Insp Program Over Next 7 Months to Assess Preparation for Implementation of Refuel Outage Activities.Historical Listing of Plant Issues Encl
ML20212J87630 September 1999Forwards RAI Re Util 990412 Request to Revise Duane Arnold Energy Ctr TS SR 3.6.1.3.7 to Allow Representative Sample of Reactor Instrumentation Line EFCV to Be Tested Every 24 Months,Instead of Testing Each EFCV Every 24 Months
ML20212H21227 September 1999Forwards Request for Addl Info Re 990412 Licensee Request to Revise DAEC TS SR 3.6.1.3.7 to Allow Representative Sample of Reactor Instrumentation Line EFCV to Be Tested Every 24 Months,Instead of Testing Each EFCV Every 24 MonthsIncorporated by reference
ML20212H21522 September 1999Forwards Amend 228 to License DPR-49 & Safety Evaluation. Amend Revises DAEC TS SR 3.4.3.1, Safety/Relief Valves & Safety Valves
ML20212A87114 September 1999Informs That 990716 Application Which Submitted Affidavit & Attachment Re Addl Info Re Cycle Specific SLMCPR for Plant Cycle 17, June 1999,marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5)
ML20211M5622 September 1999Forwards Insp Rept 50-331/99-08 on 990712-16 & 0810-12.No Violations Noted.Insp Consisted of Review of Source Term Reduction & Integration of ALARA Into Work Planning & Execution,Calibration & Maint
ML20211F78326 August 1999Forwards Insp Rept 50-331/99-09 on 990708-0819.Violation Re Failure to Log Entry Into TS Limiting Condition for Operation When Power Lost to Drywell Sump Pump Level Switches,Noted & Being Treated as NCVDownpower
ML20210V12317 August 1999Forwards Insp Rept 50-331/99-10 on 990802-06.No Violations Noted.Insp Examined Activities Conducted Under Emergency Preparedness Program
ML20211A87316 August 1999Ack Receipt of 990212 & 0402 Ltrs,Which Transmitted Changes Identified as Revs 39 & 40 to DAEC Security Plan,Submitted Under Provisions of 10CFR50.54(p).NRC Review Comments for Subject Plans,Encl
ML20210L83127 July 1999Forwards Insp Rept 50-331/99-05 on 990601-0701.Violations Noted.Insp Included Assessment & Evaluation of Engineering Support,Design Change & Mod Activities Including 10CFR50.59 Safety Evaluations,Applicability Reviews & C/AsTemporary Modification
ML20210E97826 July 1999Informs That Info Submitted by Ltr (Nep 99-0067), Ies Utilities,Inc,Will Be Withheld from Public Disclosure, Per 10CFR2.790(a)(6)
ML20210E14322 July 1999Provides Summary of 990715 Meeting with Alliant Utilities & Duane Arnold Energy Ctr Mgt Re Recent Plant Performance Review Issued by NRC for Duane Arnold Energy Ctr.Associated Meeting Summary & Alliant Utilities Meeting Handout EnclTemporary Modification
Systematic Assessment of Licensee Performance
ML20210B71620 July 1999Forwards Audit Rept on Y2K Contingency Planning Program at Duane Arnold Energy Center Conducted on 990615-16 as follow-up to NRC GL 98-01
ML20210B52716 July 1999Forwards Insp Rept 50-331/99-07 on 990526-0707.Two Violations Being Treated as Noncited Violations
ML20209E84013 July 1999Discusses Completion of NRC GL 97-04, Assurance of Sufficient Net Positive Suction Head for Emergency Core Cooling & Containment Heat Removal Pumps for Plant
ML20209G49912 July 1999Forwards Insp Rept 50-331/98-05 on 990622-24.No Violations NotedNondestructive Examination
ML20207H6746 July 1999Forwards Operating Licensing Exam Rept 50-331/99-301(OL) on 990525.Staff Administered Written Exam to One Reactor Operator Applicant Previously Demonstrating Unsatisfactory Results During Jul 1998 Exam
ML20212J45225 June 1999Discusses Closure of TAC MA1188 Re Response to RAI to GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity
ML20196A14318 June 1999Confirms Discussion Between Members of Staffs to Have Meeting on 990715 at Training Ctr at Duane Arnold Energy Ctr to Discuss Results of Plant Performance Review Process
ML20212J05417 June 1999Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes FirstWeld Overlay
ML20195G9589 June 1999Forwards Amend 227 to License DPR-49 & Safety Evaluation. Amend Revises DAEC TS by Adding New TS 3.7.9, Control Building/Standby Gas Treatment Sys (Cb/Sbgt) Instrument Air Sys
ML20195F2189 June 1999Forwards Insp Rept 50-331/99-04 on 990414-0525.One Violation of NRC Requirements Identified Involving Inadequate Testing of Standby Liquid Control Sys Valves & Being Treated as non-cited Violation
ML20207G4287 June 1999Forwards Synopsis from Investigation Conducted by NRC Office of Investigations to Determine Whether Quality Control Inspector Was Discriminated Against by Being Laid Off at Duane Arnold Energy Center After Raising Safety Concern
ML20207G4937 June 1999Discusses OI Rept 3-1998-023 Conducted by NRC to Determine Whether Quality Control Inspector,Employed by Spec Insp Was Discriminated Against by Being Laid Off at Plant After Raising Safety Concern
ML20195D2637 June 1999Forwards RAI on Third 10 Yr ISI Interval ISI Relief Requests.Addl Info Necessary to Complete Review of Request for Relief NDE-R035 Should Be Provided within 30 Days of Date of Ltr
ML20207F1433 June 1999Provides Individual Exam Results for Applicant Who Took 990525 Initial License Retake Exam.Encls Withheld
ML20207B58225 May 1999Advises That Rept Entitled, Criticality SE of Sf Storage Racks in Duane Arnold Energy Ctr for Max Enrichment Capability, & Holtec Rept HI-971708,dtd Aug 1997,marked Proprietary Will Be Withheld from Public Disclosure
ML20207A79820 May 1999Informs That During 990319 Telcon Between K Young & M Bielby,Arrangements Were Made for Administration of Licensing Exams at Duane Arnold Energy Center for Week of 990920
ML20206N74913 May 1999Forwards Safety Evaluation Accepting Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves
ML20206N45312 May 1999Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization, Division of Licensing Project Management Created. Reorganization Chart EnclEnforcement Discretion
ML20206G5274 May 1999Informs That by ,Ies Utilities,Inc Provided Changes to QA Program in Ufsar,Rev 20 for Daec.Nrc Approval Not Required Prior to Implementation of Proposed Changes
ML20206G4824 May 1999Informs That NRC Reviewed Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions & Accepts Resolution for Issue of Thermally Induced Pressurization
ML20205T60123 April 1999Forwards Insp Rept 50-331/99-03 on 990303-0413.No Violations Noted.Inadequate Implementation of Mod to a Reactor Water Cleanup Pump Installed Resulted in Insufficient Oil Level & Subsequent Bearing Failure
ML20205G2541 April 1999Forwards RAI Re GL 95-07, Pressure-Locking & Thermal- Binding of Safety-Related Power-Operated Gate Valves. Response Requested within 30 Days from Date of Ltr
ML20205D52031 March 1999Requests Addl Info on GL 95-07, Pressure-Locking & Thermal- Binding of Safety-Related Power-Operated Gate Valves, Per Util 960213 Response.Response Should Provide Addl Info as Identified in Encl within 30 Days of Ltr Date
ML20205A62926 March 1999Informs of NRC Planned Insp Effort Resulting from Duane Arnold Energy Ctr Plant Performance Review for Period 970928-990131.Historical Listing of Plant Issues & Details of Insp Plan for Next 8 Months EnclTemporary Modification
Missed surveillance
Systematic Assessment of Licensee Performance
Fire Protection Program
ML20204J73424 March 1999Forwards Insp Rept 50-331/99-01 on 990113-0302.No Violations Noted
ML20204D18316 March 1999Discusses Review of Revision 20 to Section H of Plant Energy Ctr Emergency Plan
ML20207H94511 March 1999Discusses Review of Rev 20 to Portions of Plant Emergency Plan.Rev Submitted Per 10CFR50.54(q)
ML20207G0113 March 1999Discusses GL 96-05 Issued on 960918 & Ies Utilities,Inc Responses ,970317,980513 & 981120 for Duane Arnold Energy Center.Concludes That Licensee Established Acceptable Program to Verify design-basis Capability of MOVs
ML20203F25410 February 1999Informs That Beginning 990216,DE Hills Will Be Chief of Operations Branch Which Includes Operator Licensing Function
ML20203F13010 February 1999Forwards Insp Rept 50-331/98-15 on 981125-990112 & NOV Re Failure to Review & Implement Applicable Procedure Requirements,Due to Sense of Urgency by Quality Control Inspector to Complete Work
ML20202G4191 February 1999Forwards Insp Rept 50-331/99-02 on 990119-21.No Violations Noted.Inspector Concluded That Staff Had Been Effective in Implementing C/As for Items Reviewed
ML20202B36726 January 1999Forwards Safety Evaluation Addressing Thermo-Lag Related Ampacity Derating Issues & Technical Evaluation of Duane Arnold Energy Ctr Analysis of Ampacity Loads for Fire Barrier Clad Power Cables. Technical Evaluation Rept EnclFire Barrier
ML20202B42326 January 1999Forwards Safety Evaluation of Request for Approval to Use ASME Code Case N-508-1 in ISI Program for Duane Arnold Energy Ctr.Request Authorized