ML20217N552 | 21 October 1999 | Forwards Operator Licensing Exam Rept 50-331/99-302(OL) for Tests Administered During Wk of 990920.Six Applicants Passed All Sections of Exam & Were Issued Operating Licenses | |
ML20217H892 | 18 October 1999 | Forwards SER Accepting Eight of Licensee Relief Requests, NDE-R001,(Part a & B),NDE-R027,NDE-R028,NDE-R029,NDE-R030, NDE-R032 & NDE-R035,one Request Relief NDE-R036,denied & Relief Request NDE-R034 Unnecessary | |
ML20217F480 | 14 October 1999 | Provides Individual Exam Results for Applicants Who Took Sept 1999 Initial License Exam.Informs That Info Considered Proprietary & That Listed Info,Supplements & Exam Rept Will Be Issued Shortly | |
ML20217F722 | 7 October 1999 | Forwards Insp Rept 50-331/99-11 on 990820-0930.No Violations Noted | Power change |
ML20212L041 | 5 October 1999 | Informs That Privacy Info Identified in Util Re Duane Arnold Energy Center Emergency Telephone Book,Rev 61 Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(a)(6) & Section 103(b) of Atomic Energy Act | |
ML20217A933 | 30 September 1999 | Informs That NRC Plan to Conduct Addl Insp by Resident Inspectors Beyond Core Insp Program Over Next 7 Months to Assess Preparation for Implementation of Refuel Outage Activities.Historical Listing of Plant Issues Encl | |
ML20212J876 | 30 September 1999 | Forwards RAI Re Util 990412 Request to Revise Duane Arnold Energy Ctr TS SR 3.6.1.3.7 to Allow Representative Sample of Reactor Instrumentation Line EFCV to Be Tested Every 24 Months,Instead of Testing Each EFCV Every 24 Months | |
ML20212H212 | 27 September 1999 | Forwards Request for Addl Info Re 990412 Licensee Request to Revise DAEC TS SR 3.6.1.3.7 to Allow Representative Sample of Reactor Instrumentation Line EFCV to Be Tested Every 24 Months,Instead of Testing Each EFCV Every 24 Months | Incorporated by reference |
ML20212H215 | 22 September 1999 | Forwards Amend 228 to License DPR-49 & Safety Evaluation. Amend Revises DAEC TS SR 3.4.3.1, Safety/Relief Valves & Safety Valves | |
ML20212A871 | 14 September 1999 | Informs That 990716 Application Which Submitted Affidavit & Attachment Re Addl Info Re Cycle Specific SLMCPR for Plant Cycle 17, June 1999,marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) | |
ML20211M562 | 2 September 1999 | Forwards Insp Rept 50-331/99-08 on 990712-16 & 0810-12.No Violations Noted.Insp Consisted of Review of Source Term Reduction & Integration of ALARA Into Work Planning & Execution,Calibration & Maint | |
ML20211F783 | 26 August 1999 | Forwards Insp Rept 50-331/99-09 on 990708-0819.Violation Re Failure to Log Entry Into TS Limiting Condition for Operation When Power Lost to Drywell Sump Pump Level Switches,Noted & Being Treated as NCV | Downpower |
ML20210V123 | 17 August 1999 | Forwards Insp Rept 50-331/99-10 on 990802-06.No Violations Noted.Insp Examined Activities Conducted Under Emergency Preparedness Program | |
ML20211A873 | 16 August 1999 | Ack Receipt of 990212 & 0402 Ltrs,Which Transmitted Changes Identified as Revs 39 & 40 to DAEC Security Plan,Submitted Under Provisions of 10CFR50.54(p).NRC Review Comments for Subject Plans,Encl | |
ML20210L831 | 27 July 1999 | Forwards Insp Rept 50-331/99-05 on 990601-0701.Violations Noted.Insp Included Assessment & Evaluation of Engineering Support,Design Change & Mod Activities Including 10CFR50.59 Safety Evaluations,Applicability Reviews & C/As | Temporary Modification |
ML20210E978 | 26 July 1999 | Informs That Info Submitted by Ltr (Nep 99-0067), Ies Utilities,Inc,Will Be Withheld from Public Disclosure, Per 10CFR2.790(a)(6) | |
ML20210E143 | 22 July 1999 | Provides Summary of 990715 Meeting with Alliant Utilities & Duane Arnold Energy Ctr Mgt Re Recent Plant Performance Review Issued by NRC for Duane Arnold Energy Ctr.Associated Meeting Summary & Alliant Utilities Meeting Handout Encl | Temporary Modification Systematic Assessment of Licensee Performance |
ML20210B716 | 20 July 1999 | Forwards Audit Rept on Y2K Contingency Planning Program at Duane Arnold Energy Center Conducted on 990615-16 as follow-up to NRC GL 98-01 | |
ML20210B527 | 16 July 1999 | Forwards Insp Rept 50-331/99-07 on 990526-0707.Two Violations Being Treated as Noncited Violations | |
ML20209E840 | 13 July 1999 | Discusses Completion of NRC GL 97-04, Assurance of Sufficient Net Positive Suction Head for Emergency Core Cooling & Containment Heat Removal Pumps for Plant | |
ML20209G499 | 12 July 1999 | Forwards Insp Rept 50-331/98-05 on 990622-24.No Violations Noted | Nondestructive Examination |
ML20207H674 | 6 July 1999 | Forwards Operating Licensing Exam Rept 50-331/99-301(OL) on 990525.Staff Administered Written Exam to One Reactor Operator Applicant Previously Demonstrating Unsatisfactory Results During Jul 1998 Exam | |
ML20212J452 | 25 June 1999 | Discusses Closure of TAC MA1188 Re Response to RAI to GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity | |
ML20196A143 | 18 June 1999 | Confirms Discussion Between Members of Staffs to Have Meeting on 990715 at Training Ctr at Duane Arnold Energy Ctr to Discuss Results of Plant Performance Review Process | |
ML20212J054 | 17 June 1999 | Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes First | Weld Overlay |
ML20195G958 | 9 June 1999 | Forwards Amend 227 to License DPR-49 & Safety Evaluation. Amend Revises DAEC TS by Adding New TS 3.7.9, Control Building/Standby Gas Treatment Sys (Cb/Sbgt) Instrument Air Sys | |
ML20195F218 | 9 June 1999 | Forwards Insp Rept 50-331/99-04 on 990414-0525.One Violation of NRC Requirements Identified Involving Inadequate Testing of Standby Liquid Control Sys Valves & Being Treated as non-cited Violation | |
ML20207G428 | 7 June 1999 | Forwards Synopsis from Investigation Conducted by NRC Office of Investigations to Determine Whether Quality Control Inspector Was Discriminated Against by Being Laid Off at Duane Arnold Energy Center After Raising Safety Concern | |
ML20207G493 | 7 June 1999 | Discusses OI Rept 3-1998-023 Conducted by NRC to Determine Whether Quality Control Inspector,Employed by Spec Insp Was Discriminated Against by Being Laid Off at Plant After Raising Safety Concern | |
ML20195D263 | 7 June 1999 | Forwards RAI on Third 10 Yr ISI Interval ISI Relief Requests.Addl Info Necessary to Complete Review of Request for Relief NDE-R035 Should Be Provided within 30 Days of Date of Ltr | |
ML20207F143 | 3 June 1999 | Provides Individual Exam Results for Applicant Who Took 990525 Initial License Retake Exam.Encls Withheld | |
ML20207B582 | 25 May 1999 | Advises That Rept Entitled, Criticality SE of Sf Storage Racks in Duane Arnold Energy Ctr for Max Enrichment Capability, & Holtec Rept HI-971708,dtd Aug 1997,marked Proprietary Will Be Withheld from Public Disclosure | |
ML20207A798 | 20 May 1999 | Informs That During 990319 Telcon Between K Young & M Bielby,Arrangements Were Made for Administration of Licensing Exams at Duane Arnold Energy Center for Week of 990920 | |
ML20206N749 | 13 May 1999 | Forwards Safety Evaluation Accepting Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves | |
ML20206N453 | 12 May 1999 | Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization, Division of Licensing Project Management Created. Reorganization Chart Encl | Enforcement Discretion |
ML20206G527 | 4 May 1999 | Informs That by ,Ies Utilities,Inc Provided Changes to QA Program in Ufsar,Rev 20 for Daec.Nrc Approval Not Required Prior to Implementation of Proposed Changes | |
ML20206G482 | 4 May 1999 | Informs That NRC Reviewed Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions & Accepts Resolution for Issue of Thermally Induced Pressurization | |
ML20205T601 | 23 April 1999 | Forwards Insp Rept 50-331/99-03 on 990303-0413.No Violations Noted.Inadequate Implementation of Mod to a Reactor Water Cleanup Pump Installed Resulted in Insufficient Oil Level & Subsequent Bearing Failure | |
ML20205G254 | 1 April 1999 | Forwards RAI Re GL 95-07, Pressure-Locking & Thermal- Binding of Safety-Related Power-Operated Gate Valves. Response Requested within 30 Days from Date of Ltr | |
ML20205D520 | 31 March 1999 | Requests Addl Info on GL 95-07, Pressure-Locking & Thermal- Binding of Safety-Related Power-Operated Gate Valves, Per Util 960213 Response.Response Should Provide Addl Info as Identified in Encl within 30 Days of Ltr Date | |
ML20205A629 | 26 March 1999 | Informs of NRC Planned Insp Effort Resulting from Duane Arnold Energy Ctr Plant Performance Review for Period 970928-990131.Historical Listing of Plant Issues & Details of Insp Plan for Next 8 Months Encl | Temporary Modification Missed surveillance Systematic Assessment of Licensee Performance Fire Protection Program |
ML20204J734 | 24 March 1999 | Forwards Insp Rept 50-331/99-01 on 990113-0302.No Violations Noted | |
ML20204D183 | 16 March 1999 | Discusses Review of Revision 20 to Section H of Plant Energy Ctr Emergency Plan | |
ML20207H945 | 11 March 1999 | Discusses Review of Rev 20 to Portions of Plant Emergency Plan.Rev Submitted Per 10CFR50.54(q) | |
ML20207G011 | 3 March 1999 | Discusses GL 96-05 Issued on 960918 & Ies Utilities,Inc Responses ,970317,980513 & 981120 for Duane Arnold Energy Center.Concludes That Licensee Established Acceptable Program to Verify design-basis Capability of MOVs | |
ML20203F254 | 10 February 1999 | Informs That Beginning 990216,DE Hills Will Be Chief of Operations Branch Which Includes Operator Licensing Function | |
ML20203F130 | 10 February 1999 | Forwards Insp Rept 50-331/98-15 on 981125-990112 & NOV Re Failure to Review & Implement Applicable Procedure Requirements,Due to Sense of Urgency by Quality Control Inspector to Complete Work | |
ML20202G419 | 1 February 1999 | Forwards Insp Rept 50-331/99-02 on 990119-21.No Violations Noted.Inspector Concluded That Staff Had Been Effective in Implementing C/As for Items Reviewed | |
ML20202B367 | 26 January 1999 | Forwards Safety Evaluation Addressing Thermo-Lag Related Ampacity Derating Issues & Technical Evaluation of Duane Arnold Energy Ctr Analysis of Ampacity Loads for Fire Barrier Clad Power Cables. Technical Evaluation Rept Encl | Fire Barrier |
ML20202B423 | 26 January 1999 | Forwards Safety Evaluation of Request for Approval to Use ASME Code Case N-508-1 in ISI Program for Duane Arnold Energy Ctr.Request Authorized |