Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML24037A0258 February 2024Pre-Submittal Presentation - 02/08/2024 - Proposed License Amendment Request Change to the Sequoyah Nuclear Plant Technical Specifications 3.8.1 and 3.8.2
ML23345A16613 December 2023Tennessee Valley Authority - Pre-submittal Meeting for Conversion of Nuclear Quality Assurance Plan from ANSI N45.2-1971 to ASME NQA-1-2015 (EPID L-2023-LRM-0103) - Slides
ML23291A15618 October 2023NRC Pre-Submittal Meeting Watts Bar & Sequoyah LAR, TVA Presentation Slides
ML23128A2888 May 2023TVA Nuclear Plants -2022 EOC Media SlidesOpen House
ML22157A4136 June 2022Plants - Pre-Submittal Teleconference for Proposed Amendment Request Regarding the Change for the Sequoyah and Watts Bar Nuclear Plants Technical Specification 3.4.12 Meeting Slides
ML22080A16621 March 2022TVA Nuclear Plants -2021 EOC Media Loop Slides for Automatic PlayCOVID-19
ML21308A4938 November 2021Pre-submittal Meeting Presentation - License Amendment Request to Revise Sequoyah Operating License to Use Fire and Seismic PRA Models for 10 CFR 50.69 Risk-Informed Categorizations (EPID L-2021-LRM-0109) (Slides)Safe Shutdown
ML21281A22813 October 2021Tennessee Valley Authority Fleet Pre-Submittal Meeting for License Amendment Request to Change Emergency Action Level Scheme Presentation - October 13, 2021 (EPID L-2021-LRM-0096) (Slides)Operating Basis Earthquake
Earthquake
ML21252A36315 September 2021Pre-Submittal Meeting for License Amendment Request to Eliminate the High Negative Flux Rate TripProbabilistic Risk Assessment
Rod Drop Event
ML21061A0892 March 2021TVA Presentation Slides for March 2, 2021, Public Meeting to Discuss Sequoyah Alternative RequestWeld Overlay
Liquid penetrant
ML20203M05716 July 2020Updated TVA Non-Proprietary Slides for Open Session of July 16, 2020, Partially Closed Public Meeting to Discuss Sequoyah License Amendment Request
ML20196L79216 July 2020Corrected TVA Non-Proprietary Slides for Open Session of July 16, 2020, Partially Closed Public Meeting to Discuss Sequoyah License Amendment Request
ML20196L68916 July 2020TVA Non-Proprietary Slides for Open Session of July 16, 2020, Partially Closed Public Meeting to Discuss Sequoyah License Amendment Request
ML20175A05523 June 2020TVA Slides for June 23, 2020, Emergency Plan Change Presubmittal Meeting
ML20163A69512 June 2020Bpg Presentation on TVA SCWE Final 2
ML20108E90816 April 2020Presentation Slides for Sequoyah Nuclear Plant, Unit 2 - Exigent License Amendment Request TS 4.2.2, Control Rod Assemblies, Pre-Submittal Conference Call - April 16, 2020Shutdown Margin
Temporary Modification
ML20050C86620 February 2020February 20, 2020 - Pre-Submittal Meeting Presentation - Permanent Operation with Control Rod H8 RemovedShutdown Margin
ML20049G18218 February 2020February 20, 2020 - Pre-submittal Meeting Presentation - Transition to Westinghouse FuelExemption Request
ML20024D21127 January 2020Pre-Submittal Meeting for License Amendment Request (LAR) Revised Steam Generator (SG) Inspection Intervals - January 27, 2020
ML19325C7142 December 2019November 15,2019, Summary of Conference Call with Tennessee Valley Authority to Discuss Submittal of Exigent License Request (EPID L-2019-LLA-0239) for Sequoyah Nuclear Plant, Unit 1Shutdown Margin
Temporary Modification
ML19323D88815 November 2019TVA Pre-submittal Presentation Slides - Exigent AmendmentShutdown Margin
Temporary Modification
ML19161A23910 June 2019Plants Pre-Submittal Meeting for Proposed License Amendments Hydrological Analysis Updates June 10, 2019
ML19142A27721 May 2019Summary of Public Meeting - Sequoyah Nuclear Plant
ML18312A35014 November 2018Meeting to Discuss Proposed Technical Specification Changes Needed of Associated with the Use of Westinghouse Robust Fuel Assemblies at Sequoyah Nuclear Plant Units 1 & 2 - November 14, 2018
ML18164A30913 June 2018June 6, 2018 Summary of Public Meeting - Sequoyah Nuclear Plant - Docket Nos. 50-327 and 50-328
ML17342A3648 December 2017Enclosure 2, Handouts and Presentations Discussed During the November 16, 2017 ROP Working Group Public MeetingSignificance Determination Process
NEI 09-07, Enclosure 2, Handouts and Presentations Discussed During the November 16, 2017 ROP Working Group Public Meeting8 December 2017Enclosure 2, Handouts and Presentations Discussed During the November 16, 2017 ROP Working Group Public Meeting
ML17271A01628 September 2017Meeting Slide for Tennessee Valley Authority (TVA) Hydrology Precipitation Model Topical Report Review Status
ML17212A8431 August 2017Meeting Slides for Pre-submittal Meeting with Tennessee Valley Authority on Unbalanced Voltage License Amendment Request for TVA Nuclear PlantsAnticipated operational occurrence
Open Phase Condition
ML17053A02322 February 2017Slides for Meeting with Tennessee Valley Authority to Discuss HEC-RAS Flood Model Project: Seismic Dam Failure MethodologyEarthquake
ML16102A3304 April 2016Presentation Slides for 04042016 Public Meeting on Resolution of TVA Flood Model IssueEarthquake
ML14259A16617 September 2014Meeting Slides for the September 17, 2014 Public Meeting to Discuss the Dseis for License Renewal of Sequoyah Units 1 and 2Environmental Justice
ML14262A33016 September 20149/16/2014 Meeting Slide for Sequoyah Nuclear Plant, Units 1 and 2 Regarding AST PresentationRecently irradiated fuel
ML14107A33516 April 2014Summary of Meeting with Tennessee Valley Authority to Discuss Nrc'S Reactor Oversight Process (ROP) and Nrc'S Annual Assessment of Plant Safety Performance for Period of January 1, 2013, to December 31, 2013 for Sequoyah Bar Nuclear Plant
ML14101A15211 April 2014Summary of Public and Closed Meeting for Tennessee Valley Authority 2013 Synergy Safety Culture Survey Results
ML14090A45831 March 2014Public Meeting Summary TVA Synergy Safety Culture Survey Results
ML14071A15213 March 2014Slide, ITS Project Electrical Systems Presentation March 13, 2014Reactor Vessel Water Level
Offsite Circuit
ML14049A33718 February 20142/4/2014 - Summary of Public Meeting for Sequoyah Nuclear Plant, Docket No. 50-327, and 50-328
ML13361A02127 December 2013License Renewal IP71002 Exit Meeting Slides and Notes from December 17, 2013Aging Management
ML13210A40430 July 2013Meeting Slide for 7/30-31/2013 Meeting Re. Hydrology License Amendment RequestsHydrostatic
ML13189A1351 July 2013Progress Update on Improved Flood Mitigation System ProjectFLEX
ML13182A08727 June 2013Plants - 1st Quarterly Update for NTTF Recommendation 2.1, Flooding Hazard Reevaluation Report (Hrr) Extension RequestEarthquake
ML13182A06627 June 2013Plants - 1st Quarterly Update for the Improved Flood Mitigation SystemFLEX
ML13156A0464 June 2013NRC Pre-Submittal Meeting, Improved Technical Specification ConversionUltimate heat sink
Surveillance Frequency Control Program
Offsite Circuit
ML13120A13229 April 2013Plants, Units 1 and 2 - NTTF Recommendation 2.1, Flooding Hazard Reevaluation Report Extension RequestFLEX
Spent Fuel Pool Instrumentation
ML12352A20817 December 2012December 3, 2012 Summary of Public Meeting Flood Mode Operation Improvement Strategy for Watts Bar and Sequoyah
ML12215A4255 September 2012Meeting Slides with Tennessee Valley Authority Regarding Sequoyah Nuclear Plant, Units 1 and 2 Multiple Circuit Failure Modifications Appendix R (Fire Protection)Safe Shutdown
Operator Manual Action
Fire Protection Program
ML12214A19916 July 20127/16/12 Slides of Public Meeting with TVA Regarding the Use of the Unit Station Service Transformers as a Power Supply to an Offsite Circuit for Sequoyah Nuclear PlantOffsite Circuit
ML12156A07631 May 2012TVA Slides for Nrc/Tva Public Meeting on May 31, 2012Shutdown Margin
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
ML12128A0633 May 2012EOC Meeting Summary