Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML24037A025 | 8 February 2024 | Pre-Submittal Presentation - 02/08/2024 - Proposed License Amendment Request Change to the Sequoyah Nuclear Plant Technical Specifications 3.8.1 and 3.8.2 | |
ML23345A166 | 13 December 2023 | Tennessee Valley Authority - Pre-submittal Meeting for Conversion of Nuclear Quality Assurance Plan from ANSI N45.2-1971 to ASME NQA-1-2015 (EPID L-2023-LRM-0103) - Slides | |
ML23291A156 | 18 October 2023 | NRC Pre-Submittal Meeting Watts Bar & Sequoyah LAR, TVA Presentation Slides | |
ML23128A288 | 8 May 2023 | TVA Nuclear Plants -2022 EOC Media Slides | Open House |
ML22157A413 | 6 June 2022 | Plants - Pre-Submittal Teleconference for Proposed Amendment Request Regarding the Change for the Sequoyah and Watts Bar Nuclear Plants Technical Specification 3.4.12 Meeting Slides | |
ML22080A166 | 21 March 2022 | TVA Nuclear Plants -2021 EOC Media Loop Slides for Automatic Play | COVID-19 |
ML21308A493 | 8 November 2021 | Pre-submittal Meeting Presentation - License Amendment Request to Revise Sequoyah Operating License to Use Fire and Seismic PRA Models for 10 CFR 50.69 Risk-Informed Categorizations (EPID L-2021-LRM-0109) (Slides) | Safe Shutdown |
ML21281A228 | 13 October 2021 | Tennessee Valley Authority Fleet Pre-Submittal Meeting for License Amendment Request to Change Emergency Action Level Scheme Presentation - October 13, 2021 (EPID L-2021-LRM-0096) (Slides) | Operating Basis Earthquake Earthquake |
ML21252A363 | 15 September 2021 | Pre-Submittal Meeting for License Amendment Request to Eliminate the High Negative Flux Rate Trip | Probabilistic Risk Assessment Rod Drop Event |
ML21061A089 | 2 March 2021 | TVA Presentation Slides for March 2, 2021, Public Meeting to Discuss Sequoyah Alternative Request | Weld Overlay Liquid penetrant |
ML20203M057 | 16 July 2020 | Updated TVA Non-Proprietary Slides for Open Session of July 16, 2020, Partially Closed Public Meeting to Discuss Sequoyah License Amendment Request | |
ML20196L792 | 16 July 2020 | Corrected TVA Non-Proprietary Slides for Open Session of July 16, 2020, Partially Closed Public Meeting to Discuss Sequoyah License Amendment Request | |
ML20196L689 | 16 July 2020 | TVA Non-Proprietary Slides for Open Session of July 16, 2020, Partially Closed Public Meeting to Discuss Sequoyah License Amendment Request | |
ML20175A055 | 23 June 2020 | TVA Slides for June 23, 2020, Emergency Plan Change Presubmittal Meeting | |
ML20163A695 | 12 June 2020 | Bpg Presentation on TVA SCWE Final 2 | |
ML20108E908 | 16 April 2020 | Presentation Slides for Sequoyah Nuclear Plant, Unit 2 - Exigent License Amendment Request TS 4.2.2, Control Rod Assemblies, Pre-Submittal Conference Call - April 16, 2020 | Shutdown Margin Temporary Modification |
ML20050C866 | 20 February 2020 | February 20, 2020 - Pre-Submittal Meeting Presentation - Permanent Operation with Control Rod H8 Removed | Shutdown Margin |
ML20049G182 | 18 February 2020 | February 20, 2020 - Pre-submittal Meeting Presentation - Transition to Westinghouse Fuel | Exemption Request |
ML20024D211 | 27 January 2020 | Pre-Submittal Meeting for License Amendment Request (LAR) Revised Steam Generator (SG) Inspection Intervals - January 27, 2020 | |
ML19325C714 | 2 December 2019 | November 15,2019, Summary of Conference Call with Tennessee Valley Authority to Discuss Submittal of Exigent License Request (EPID L-2019-LLA-0239) for Sequoyah Nuclear Plant, Unit 1 | Shutdown Margin Temporary Modification |
ML19323D888 | 15 November 2019 | TVA Pre-submittal Presentation Slides - Exigent Amendment | Shutdown Margin Temporary Modification |
ML19161A239 | 10 June 2019 | Plants Pre-Submittal Meeting for Proposed License Amendments Hydrological Analysis Updates June 10, 2019 | |
ML19142A277 | 21 May 2019 | Summary of Public Meeting - Sequoyah Nuclear Plant | |
ML18312A350 | 14 November 2018 | Meeting to Discuss Proposed Technical Specification Changes Needed of Associated with the Use of Westinghouse Robust Fuel Assemblies at Sequoyah Nuclear Plant Units 1 & 2 - November 14, 2018 | |
ML18164A309 | 13 June 2018 | June 6, 2018 Summary of Public Meeting - Sequoyah Nuclear Plant - Docket Nos. 50-327 and 50-328 | |
ML17342A364 | 8 December 2017 | Enclosure 2, Handouts and Presentations Discussed During the November 16, 2017 ROP Working Group Public Meeting | Significance Determination Process |
NEI 09-07, Enclosure 2, Handouts and Presentations Discussed During the November 16, 2017 ROP Working Group Public Meeting | 8 December 2017 | Enclosure 2, Handouts and Presentations Discussed During the November 16, 2017 ROP Working Group Public Meeting | |
ML17271A016 | 28 September 2017 | Meeting Slide for Tennessee Valley Authority (TVA) Hydrology Precipitation Model Topical Report Review Status | |
ML17212A843 | 1 August 2017 | Meeting Slides for Pre-submittal Meeting with Tennessee Valley Authority on Unbalanced Voltage License Amendment Request for TVA Nuclear Plants | Anticipated operational occurrence Open Phase Condition |
ML17053A023 | 22 February 2017 | Slides for Meeting with Tennessee Valley Authority to Discuss HEC-RAS Flood Model Project: Seismic Dam Failure Methodology | Earthquake |
ML16102A330 | 4 April 2016 | Presentation Slides for 04042016 Public Meeting on Resolution of TVA Flood Model Issue | Earthquake |
ML14259A166 | 17 September 2014 | Meeting Slides for the September 17, 2014 Public Meeting to Discuss the Dseis for License Renewal of Sequoyah Units 1 and 2 | Environmental Justice |
ML14262A330 | 16 September 2014 | 9/16/2014 Meeting Slide for Sequoyah Nuclear Plant, Units 1 and 2 Regarding AST Presentation | Recently irradiated fuel |
ML14107A335 | 16 April 2014 | Summary of Meeting with Tennessee Valley Authority to Discuss Nrc'S Reactor Oversight Process (ROP) and Nrc'S Annual Assessment of Plant Safety Performance for Period of January 1, 2013, to December 31, 2013 for Sequoyah Bar Nuclear Plant | |
ML14101A152 | 11 April 2014 | Summary of Public and Closed Meeting for Tennessee Valley Authority 2013 Synergy Safety Culture Survey Results | |
ML14090A458 | 31 March 2014 | Public Meeting Summary TVA Synergy Safety Culture Survey Results | |
ML14071A152 | 13 March 2014 | Slide, ITS Project Electrical Systems Presentation March 13, 2014 | Reactor Vessel Water Level Offsite Circuit |
ML14049A337 | 18 February 2014 | 2/4/2014 - Summary of Public Meeting for Sequoyah Nuclear Plant, Docket No. 50-327, and 50-328 | |
ML13361A021 | 27 December 2013 | License Renewal IP71002 Exit Meeting Slides and Notes from December 17, 2013 | Aging Management |
ML13210A404 | 30 July 2013 | Meeting Slide for 7/30-31/2013 Meeting Re. Hydrology License Amendment Requests | Hydrostatic |
ML13189A135 | 1 July 2013 | Progress Update on Improved Flood Mitigation System Project | FLEX |
ML13182A087 | 27 June 2013 | Plants - 1st Quarterly Update for NTTF Recommendation 2.1, Flooding Hazard Reevaluation Report (Hrr) Extension Request | Earthquake |
ML13182A066 | 27 June 2013 | Plants - 1st Quarterly Update for the Improved Flood Mitigation System | FLEX |
ML13156A046 | 4 June 2013 | NRC Pre-Submittal Meeting, Improved Technical Specification Conversion | Ultimate heat sink Surveillance Frequency Control Program Offsite Circuit |
ML13120A132 | 29 April 2013 | Plants, Units 1 and 2 - NTTF Recommendation 2.1, Flooding Hazard Reevaluation Report Extension Request | FLEX Spent Fuel Pool Instrumentation |
ML12352A208 | 17 December 2012 | December 3, 2012 Summary of Public Meeting Flood Mode Operation Improvement Strategy for Watts Bar and Sequoyah | |
ML12215A425 | 5 September 2012 | Meeting Slides with Tennessee Valley Authority Regarding Sequoyah Nuclear Plant, Units 1 and 2 Multiple Circuit Failure Modifications Appendix R (Fire Protection) | Safe Shutdown Operator Manual Action Fire Protection Program |
ML12214A199 | 16 July 2012 | 7/16/12 Slides of Public Meeting with TVA Regarding the Use of the Unit Station Service Transformers as a Power Supply to an Offsite Circuit for Sequoyah Nuclear Plant | Offsite Circuit |
ML12156A076 | 31 May 2012 | TVA Slides for Nrc/Tva Public Meeting on May 31, 2012 | Shutdown Margin Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake |
ML12128A063 | 3 May 2012 | EOC Meeting Summary |