ML23254A056 | 13 September 2023 | Presentation Material for 9/13/23 Pre-Submittal Meeting License Amendment Request to Support Cycle Reloads Using Framatome Gaia Fuel | |
ML22277A841 | 18 October 2022 | Presentation Material for 10/18/22 Pre-Submittal Meeting Licensing Requests to Implement Framatome Gaia Fuel | |
ML22243A032 | 7 September 2022 | Presentation Material for 9/7/22 Pre-Submittal Meeting Supplement to the Spent Fuel Pool Criticality Safety Analysis | |
ML22236A060 | 29 August 2022 | Presentation Material for 8/29/22 Pre-Submittal Meeting Reactor Pressure Vessel Head Peening Follow-Up Exam Deferral | Boric Acid Pressure Boundary Leakage Dissimilar Metal Weld |
ML22215A287 | 9 August 2022 | Presentation Material for 8/9/22 Pre-Submittal Meeting Containment Recirc Spray System Flow Test Alternative Request | |
ML22082A148 | 23 March 2022 | Annual Assessment Meeting for Millstone Power Station - Webinar Presentation (NRC) | Coronavirus Power change |
ML21076A332 | 18 March 2021 | 3/18/21 - Annual Assessment Meeting for Millstone Power Station - Presentation Slides | Earthquake Coronavirus Power change |
ML20226A411 | 19 August 2020 | Presentation Material for 8/19/20 Pre-Submittal Meeting Biennial Emergency Preparedness Exercise Date Change Exemption Request | Exemption Request Pandemic Coronavirus |
ML20176A276 | 29 June 2020 | Presentation Material for 6/29/20 Pre-Submittal Meeting Proposed License Amendment Request for Measurement Uncertainty Recapture Power Uprate | |
ML20143A077 | 26 May 2020 | Presentation Material for 5/26/20 Pre-Submittal Meeting Steam Generator Examination Frequency Alternative Request | |
ML20111A035 | 20 April 2020 | Annual Assessment Meeting for Millstone Power Station - NRC Presentation Slides | Coronavirus Fire Protection Program |
ML19143A472 | 3 June 2019 | Presentation Material for 6/03/19 Pre-Submittal Meeting Integrated Leak Rate Test Extension License Amendment Request | Probabilistic Risk Assessment Large early release frequency |
ML19128A407 | 9 May 2019 | Presentation Material for 5/09/19 Pre-Submittal Meeting TS Coolant Activity Changes, License Amendment Request | |
ML19063D945 | 7 March 2019 | Presentation Material for 3/07/19 Pre-Submittal Meeting License Amendment Request to Revise Technical Specification 3.8.1.1 | Offsite Circuit |
ML19022A243 | 22 January 2019 | Presentation Material for 1/22/19 Pre-Submittal Meeting Fillet Weld Preheat Alternative Request | |
ML18320A250 | 20 November 2018 | 50.90 License Amendment Request - Dominion Fleet EAL Scheme Changes, November 20, 2018 Public Meeting | |
ML18310A181 | 8 November 2018 | Presentation Material for 11/08/18 Pre-Submittal Meeting 10 CFR 50.69 Risk Informed Approach License Amendment Request | Safe Shutdown Internal Flooding Probabilistic Risk Assessment Multiple Spurious Operation Fire Protection Program |
ML18108A207 | 10 April 2018 | 04/10/2018 Public Teleconference Meeting Slides MPS3 C Charging Pump | |
ML17230A128 | 31 August 2017 | Connecticut, Inc. Presentation Slides for Pre-submittal Meeting on August 31, 2017 | |
ML17200C957 | 18 July 2017 | Connecticut, Inc. Presentation Slides for Pre-submittal Meeting on July 18, 2017 | |
ML16272A346 | 10 August 2016 | 08/10/2016 - NEI Supplemental Material 2 (Estimate of BADGER System Uncertainty Using Millstone Unit 1 2013) | |
ML16272A347 | 10 August 2016 | 08/10/2016 - NEI Supplemental Material 1 (BADGER Measurement of Carborundum B-10 Areal Density) | |
ML16125A009 | 3 May 2016 | 2016/05/03 Presentation Slides for Pre-Submittal Teleconference for Realistic Large Break LOCA License Amendment Request | |
ML15353A002 | 17 December 2015 | /12/17 Presentation Slides for Pre-Submittal Teleconference - Proposed LAR for Spent Fuel Pool Heat Load Analysis in Response to Confirmatory Order EA-13-188 | |
ML15344A294 | 10 December 2015 | /12/10 Presentation Slides for Pre-Submittal Teleconference - Proposed LAR for Charging System in Response to Confirmatory Order EA-13-188 | |
ML15314A102 | 20 October 2015 | 2015/10/20 Pre-Submittal Teleconference Meeting Slides: Proposed License Amendment Request for EAL Changes, RCS Sampling Methodology Revision | |
ML15198A343 | 22 June 2015 | 2015/06/22 Pre-Submittal Teleconference Meeting Slides: LOCA Analyses Supporting MPS2 Upgrade to Areva Standard CE14 Htp Fuel Assembly | Exemption Request |
ML15155B369 | 21 May 2015 | Connecticut, Inc. Presentation Slides for Pre-submittal Meeting on May 21, 2015 | |
ML14176A092 | 25 June 2014 | 6/25/2014, Dominion Public Meeting Presentation for Surry GMRS Profile | |
ML13305A144 | 31 October 2013 | Rlbloca, Revision 3 - Post-Submittal Meeting, Areva, Oct. 31, 2013S, Lides | |
ML101410159 | 21 May 2010 | April 22, 2010 Summary of Meeting with Connecticut Nuclear Energy Advisory Council | |
ML091050623 | 23 April 2009 | NRC & Neac Meeting Concerning Millstone Annual Assessment, 2008 Reactor Oversight Process, Slides | |
ML090980064 | 8 April 2009 | Slides for Millstone Annual Assessment Meeting, 2008 Reactor Oversight Process | |
ML080880083 | 28 March 2008 | Slides - NRC & Neac Meeting Concerning Millstone Station Performance, 2007 Reactor Oversight Program | Power change |
ML073470841 | 11 December 2007 | Drop-In Visit from Dominion (Millstone) | Weld Overlay |
ML073040033 | 1 November 2007 | Public Meeting Slides for Meeting with Dominion Nuclear | Boric Acid Coatings |
ML073050294 | 1 November 2007 | TSTF Status Spreadsheet for 11-01-2007 Meeting | |
ML072980664 | 24 October 2007 | Meeting Presentation on Update on Generic Safety Issue 191 Plant Audits | |
ML060830079 | 24 March 2006 | NRC Slides for Public Meeting with Nuclear Energy Advisory Council (Neac) to Discuss Cy 2005 Annual Assessment of Millstone Station | Chernobyl |
ML053250162 | 22 November 2005 | Att. 4 Millstone Power Station Appeal Faq 55.2 | Mission time |
ML052430093 | 18 August 2005 | Att. 6, FAQ Log | Mission time Coatings |
ML052770190 | 16 August 2005 | Mantg Conference, 8/16/05 - Plenary - Welcoming Speech on Predictability by J. Alan Price, Site Vice President Millstone Power Station, Dominion Nuclear | |
ML051530478 | 18 May 2005 | NRC Slides for Public Meeting with Nuclear Energy Advisory Council (Neac) Ref: Special Inspection Team Results of April 17, 2005 Event | Boric Acid |
ML050730393 | 14 March 2005 | NRC Slides for Public Meeting with Dominion Nuclear Connecticut, Inc. (Millstone Station) Ref: Annual Assessment Performance | |
ML033160421 | 21 November 2003 | Meeting Handouts for 9/24/03 Public Meeting Re. Discussion of Planned Consolidation of Quality Assurance Programs | |
ML030900322 | 20 March 2003 | Notice of Meeting EOC Slides Annual Assessment of Safety Performance of Millstone Unit 2 and Unit 3. Region I Presentation on Reactor Oversight Program - 2002 | |
ML030900354 | 20 March 2003 | Notice of Meeting Neac Slides Annual Assessment of Safety Performance of Millstone Unit 2 and Unit 3. Region I Presentation on Reactor Oversight Program - 2002 | |
ML17252A157 | 14 September 1977 | Summary of Meeting Held with Representatives of the Mark I Owner'S Group to Discuss the Structural Acceptance Criteria for the Mark I Containment Long Term Program |