Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23254A05613 September 2023Presentation Material for 9/13/23 Pre-Submittal Meeting License Amendment Request to Support Cycle Reloads Using Framatome Gaia Fuel
ML22277A84118 October 2022Presentation Material for 10/18/22 Pre-Submittal Meeting Licensing Requests to Implement Framatome Gaia Fuel
ML22243A0327 September 2022Presentation Material for 9/7/22 Pre-Submittal Meeting Supplement to the Spent Fuel Pool Criticality Safety Analysis
ML22236A06029 August 2022Presentation Material for 8/29/22 Pre-Submittal Meeting Reactor Pressure Vessel Head Peening Follow-Up Exam DeferralBoric Acid
Pressure Boundary Leakage
Dissimilar Metal Weld
ML22215A2879 August 2022Presentation Material for 8/9/22 Pre-Submittal Meeting Containment Recirc Spray System Flow Test Alternative Request
ML22082A14823 March 2022Annual Assessment Meeting for Millstone Power Station - Webinar Presentation (NRC)Coronavirus
Power change
ML21076A33218 March 20213/18/21 - Annual Assessment Meeting for Millstone Power Station - Presentation SlidesEarthquake
Coronavirus
Power change
ML20226A41119 August 2020Presentation Material for 8/19/20 Pre-Submittal Meeting Biennial Emergency Preparedness Exercise Date Change Exemption RequestExemption Request
Pandemic
Coronavirus
ML20176A27629 June 2020Presentation Material for 6/29/20 Pre-Submittal Meeting Proposed License Amendment Request for Measurement Uncertainty Recapture Power Uprate
ML20143A07726 May 2020Presentation Material for 5/26/20 Pre-Submittal Meeting Steam Generator Examination Frequency Alternative Request
ML20111A03520 April 2020Annual Assessment Meeting for Millstone Power Station - NRC Presentation SlidesCoronavirus
Fire Protection Program
ML19143A4723 June 2019Presentation Material for 6/03/19 Pre-Submittal Meeting Integrated Leak Rate Test Extension License Amendment RequestProbabilistic Risk Assessment
Large early release frequency
ML19128A4079 May 2019Presentation Material for 5/09/19 Pre-Submittal Meeting TS Coolant Activity Changes, License Amendment Request
ML19063D9457 March 2019Presentation Material for 3/07/19 Pre-Submittal Meeting License Amendment Request to Revise Technical Specification 3.8.1.1Offsite Circuit
ML19022A24322 January 2019Presentation Material for 1/22/19 Pre-Submittal Meeting Fillet Weld Preheat Alternative Request
ML18320A25020 November 201850.90 License Amendment Request - Dominion Fleet EAL Scheme Changes, November 20, 2018 Public Meeting
ML18310A1818 November 2018Presentation Material for 11/08/18 Pre-Submittal Meeting 10 CFR 50.69 Risk Informed Approach License Amendment RequestSafe Shutdown
Internal Flooding
Probabilistic Risk Assessment
Multiple Spurious Operation
Fire Protection Program
ML18108A20710 April 201804/10/2018 Public Teleconference Meeting Slides MPS3 C Charging Pump
ML17230A12831 August 2017Connecticut, Inc. Presentation Slides for Pre-submittal Meeting on August 31, 2017
ML17200C95718 July 2017Connecticut, Inc. Presentation Slides for Pre-submittal Meeting on July 18, 2017
ML16272A34610 August 201608/10/2016 - NEI Supplemental Material 2 (Estimate of BADGER System Uncertainty Using Millstone Unit 1 2013)
ML16272A34710 August 201608/10/2016 - NEI Supplemental Material 1 (BADGER Measurement of Carborundum B-10 Areal Density)
ML16125A0093 May 20162016/05/03 Presentation Slides for Pre-Submittal Teleconference for Realistic Large Break LOCA License Amendment Request
ML15353A00217 December 2015/12/17 Presentation Slides for Pre-Submittal Teleconference - Proposed LAR for Spent Fuel Pool Heat Load Analysis in Response to Confirmatory Order EA-13-188
ML15344A29410 December 2015/12/10 Presentation Slides for Pre-Submittal Teleconference - Proposed LAR for Charging System in Response to Confirmatory Order EA-13-188
ML15314A10220 October 20152015/10/20 Pre-Submittal Teleconference Meeting Slides: Proposed License Amendment Request for EAL Changes, RCS Sampling Methodology Revision
ML15198A34322 June 20152015/06/22 Pre-Submittal Teleconference Meeting Slides: LOCA Analyses Supporting MPS2 Upgrade to Areva Standard CE14 Htp Fuel AssemblyExemption Request
ML15155B36921 May 2015Connecticut, Inc. Presentation Slides for Pre-submittal Meeting on May 21, 2015
ML14176A09225 June 20146/25/2014, Dominion Public Meeting Presentation for Surry GMRS Profile
ML13305A14431 October 2013Rlbloca, Revision 3 - Post-Submittal Meeting, Areva, Oct. 31, 2013S, Lides
ML10141015921 May 2010April 22, 2010 Summary of Meeting with Connecticut Nuclear Energy Advisory Council
ML09105062323 April 2009NRC & Neac Meeting Concerning Millstone Annual Assessment, 2008 Reactor Oversight Process, Slides
ML0909800648 April 2009Slides for Millstone Annual Assessment Meeting, 2008 Reactor Oversight Process
ML08088008328 March 2008Slides - NRC & Neac Meeting Concerning Millstone Station Performance, 2007 Reactor Oversight ProgramPower change
ML07347084111 December 2007Drop-In Visit from Dominion (Millstone)Weld Overlay
ML0730400331 November 2007Public Meeting Slides for Meeting with Dominion NuclearBoric Acid
Coatings
ML0730502941 November 2007TSTF Status Spreadsheet for 11-01-2007 Meeting
ML07298066424 October 2007Meeting Presentation on Update on Generic Safety Issue 191 Plant Audits
ML06083007924 March 2006NRC Slides for Public Meeting with Nuclear Energy Advisory Council (Neac) to Discuss Cy 2005 Annual Assessment of Millstone StationChernobyl
ML05325016222 November 2005Att. 4 Millstone Power Station Appeal Faq 55.2Mission time
ML05243009318 August 2005Att. 6, FAQ LogMission time
Coatings
ML05277019016 August 2005Mantg Conference, 8/16/05 - Plenary - Welcoming Speech on Predictability by J. Alan Price, Site Vice President Millstone Power Station, Dominion Nuclear
ML05153047818 May 2005NRC Slides for Public Meeting with Nuclear Energy Advisory Council (Neac) Ref: Special Inspection Team Results of April 17, 2005 EventBoric Acid
ML05073039314 March 2005NRC Slides for Public Meeting with Dominion Nuclear Connecticut, Inc. (Millstone Station) Ref: Annual Assessment Performance
ML03316042121 November 2003Meeting Handouts for 9/24/03 Public Meeting Re. Discussion of Planned Consolidation of Quality Assurance Programs
ML03090032220 March 2003Notice of Meeting EOC Slides Annual Assessment of Safety Performance of Millstone Unit 2 and Unit 3. Region I Presentation on Reactor Oversight Program - 2002
ML03090035420 March 2003Notice of Meeting Neac Slides Annual Assessment of Safety Performance of Millstone Unit 2 and Unit 3. Region I Presentation on Reactor Oversight Program - 2002
ML17252A15714 September 1977Summary of Meeting Held with Representatives of the Mark I Owner'S Group to Discuss the Structural Acceptance Criteria for the Mark I Containment Long Term Program