Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML22067A184 | 1 March 2022 | Enc 2 -NRC Regulatory Conference Presentation | High Radiation Area Locked High Radiation Area Significance Determination Process Substantial potential for overexposure |
ML22067A185 | 1 March 2022 | Enc 3 - Energy Northwest Presentation | Locked High Radiation Area Significance Determination Process Foreign Material Exclusion Substantial potential for overexposure |
ML21081A181 | 22 March 2021 | Pre-Submittal Meeting Slides | Aging Management |
ML20093F016 | 6 April 2020 | Presubmittal Meeting: License Amendment Request for One-Time Completion Time Extension to Actions for Inoperable Electrical Distribution Subsystems | Emergency Lighting |
ML19023A036 | 24 January 2019 | Presubmittal Meeting: License Amendment Request to Remove Operating License Condition 2.(C).11 and Attachment 3 | |
ML18313A032 | 15 November 2018 | Presubmittal Meeting: License Amendment Request for Licensing Basis Change to Emergency Chilled Water System | Safe Shutdown |
ML18317A086 | 15 November 2018 | Licensee Pre-Submittal Presentation Regarding Chiller System for Columbia Generating Station, Pending LAR (EPID-L-2018-LRM-0070) | Safe Shutdown |
ML16264A036 | 20 September 2016 | Licensee Presentation Regarding Columbia Presubmittal Meeting - Change 7-Day Completion Time to Support Replace RHR-A Pump, Motor Affects TS 3.5.1A, 3.6.1.5.A, 3.6.2.3.A | Internal Flooding |
ML16182A159 | 30 June 2016 | Company Presentation Regarding EAL Scheme Change Pending LAR, Public Meeting, June 30 2016 (Cac No. MF7791) | Shutdown Margin |
ML16134A578 | 2 May 2016 | 5/2/16, Meeting Slides for Pre-Submittal Meeting Regarding License Amendment Request Measurement Uncertainty Recapture (Mur) Power Uprate | |
ML15155A748 | 4 June 2015 | NRC Slides for Near-Term Task Force Recommendation 2.1 (R2.1) Seismic Hazard Evaluation - Energy Northwest Columbia Generating Station Public Meeting - June 4, 2015 | Safe Shutdown Earthquake Probabilistic Risk Assessment Earthquake Backfit |
ML15154B396 | 4 June 2015 | Discussion of Seismic Hazard Reevaluation and Nrc'S Technical Focus Areas for Columbia Generating Station - June 4, 2015 | Ultimate heat sink Probabilistic Risk Assessment FLEX Earthquake |
ML15054A473 | 23 February 2015 | Pre-Submittal Public Meeting with Energy Northwest to Discuss Upcoming Relief Request Regarding Reactor Water Cleanup System | Packing leak Hydrostatic Nondestructive Examination |
ML14127A601 | 7 May 2014 | Summary of Annual Performance Assessment Meeting for Columbia Generating Station | |
ML13339B145 | 5 December 2013 | Meeting Summary for Public Meeting with Energy Northwest Regarding Columbia Generating Station | |
ML13158A011 | 6 June 2013 | Summary of End-of-Cycle Meeting with Energy Northwest Regarding Columbia Generating Station 2012 Performance | |
ML12293A059 | 18 October 2012 | Summary of Meeting with Energy Northwest Regarding Columbia Generating Station Performance Improvement Initiatives | |
ML12292A164 | 18 October 2012 | Energy Northwest Presentation Slide to NRC on 618-11 Remediation 10-18-2012 | Fire Protection Program |
ML12157A272 | 11 June 2012 | 5/31/2012 Summary of Telephone Conference with Licensees Regarding Near Term Task Force Recommendation 2.1 Seismic Reevaluations - Diablo Canyon, 1 and 2, San Onofre, Units 2 and 3, Columbia Generating Station, and Palo Verde, Units 1, 2, a | Earthquake |
ML120120110 | 12 January 2012 | Summary of Meeting with Energy Northwest Regarding Columbia Generating Station Performance Improvement Initiatives | |
ML112630603 | 20 September 2011 | Meeting Slides Preliminary Site-Specific Results of the License Renewal Environmental Review for Columbia Generating Station | |
ML11161A061 | 23 August 2011 | 04/27/2010 Columbia Generating Station License Renewal Environmental Review (Log No.: 121007-20-NRC) | License Renewal Environmental Justice |
ML111870059 | 6 July 2011 | Licensee Handouts from 7/6/11 Meeting with Energy Northwest to Discuss the Status of Columbia Generating Station License Amendment Request on Power Range Neutron Monitoring System | |
ML101540537 | 3 June 2010 | Summary of Meeting with Energy Northwest Regarding Columbia Generating Station End of Cycle Assessment | |
ML100560189 | 24 February 2010 | Summary of Meeting with Energy Northwest Regarding Columbia Generating Station Performance and Improvement Initiatives | |
ML092881096 | 14 October 2009 | Presentation Slides from October 14, 2009, Meeting with Energy Northwest, Department of Energy Re 618-11 Burial Ground Project Status (PM Session) | |
ML092881062 | 14 October 2009 | Presentation Slides, Energy Re 618-11 Burial Ground Project Status | Safe Shutdown |
ML061740574 | 20 June 2006 | Summary of Meeting with Energy Northwest Regarding Columbia Generating Station | |
ML060440578 | 8 February 2006 | Summary of Meeting with Energy Northwest Regarding Columbia Generating Station | |
ML043100148 | 4 November 2004 | Summary of Meeting with Energy Northwest Company Regarding Operational Issues & Improvement Initiatives Related to Columbia Generating Station | |
ML040150453 | 14 January 2004 | Summary of Meeting with Energy Northwest Columbia Generating Station General Engineering Issues and Licensee Improvement Innitiatives | |
ML023470090 | 12 December 2002 | Columbia - Meeting Slides - Alternate Source Term Resubmittal | GOTHIC |
ML022760404 | 2 October 2002 | Meeting Handouts from Energy Northwest Columbia Generating Station Energy Northwest/Framatome Anp Transition Cycle Licensing | Anticipated operational occurrence |
ML020810756 | 19 March 2002 | Operator Licensing Workshop Meeting Summary | Probabilistic Risk Assessment Significance Determination Process Job Performance Measure |
ML17037B849 | 23 August 1975 | 08/21/1975 Summary of Meeting with Mark II Owners, Sargent & Lundy, Bechtel, Stone & Webster, Burns & Roe, and the NRC Staff to Discuss Load Factors and Load Combinations Proposed by the Mark II Owners and Their Architect ... | Safe Shutdown Earthquake |