 Issue dateTitleTopic
ML22067A1841 March 2022Enc 2 -NRC Regulatory Conference PresentationHigh Radiation Area
Locked High Radiation Area
Significance Determination Process
Substantial potential for overexposure
ML22067A1851 March 2022Enc 3 - Energy Northwest PresentationLocked High Radiation Area
Significance Determination Process
Foreign Material Exclusion
Substantial potential for overexposure
ML21081A18122 March 2021Pre-Submittal Meeting SlidesAging Management
ML20093F0166 April 2020Presubmittal Meeting: License Amendment Request for One-Time Completion Time Extension to Actions for Inoperable Electrical Distribution SubsystemsEmergency Lighting
ML19023A03624 January 2019Presubmittal Meeting: License Amendment Request to Remove Operating License Condition 2.(C).11 and Attachment 3
ML18313A03215 November 2018Presubmittal Meeting: License Amendment Request for Licensing Basis Change to Emergency Chilled Water SystemSafe Shutdown
ML18317A08615 November 2018Licensee Pre-Submittal Presentation Regarding Chiller System for Columbia Generating Station, Pending LAR (EPID-L-2018-LRM-0070)Safe Shutdown
ML16264A03620 September 2016Licensee Presentation Regarding Columbia Presubmittal Meeting - Change 7-Day Completion Time to Support Replace RHR-A Pump, Motor Affects TS 3.5.1A, 3.6.1.5.A, 3.6.2.3.AInternal Flooding
ML16182A15930 June 2016Company Presentation Regarding EAL Scheme Change Pending LAR, Public Meeting, June 30 2016 (Cac No. MF7791)Shutdown Margin
ML16134A5782 May 20165/2/16, Meeting Slides for Pre-Submittal Meeting Regarding License Amendment Request Measurement Uncertainty Recapture (Mur) Power Uprate
ML15155A7484 June 2015NRC Slides for Near-Term Task Force Recommendation 2.1 (R2.1) Seismic Hazard Evaluation - Energy Northwest Columbia Generating Station Public Meeting - June 4, 2015Safe Shutdown Earthquake
Probabilistic Risk Assessment
Earthquake
Backfit
ML15154B3964 June 2015Discussion of Seismic Hazard Reevaluation and Nrc'S Technical Focus Areas for Columbia Generating Station - June 4, 2015Ultimate heat sink
Probabilistic Risk Assessment
FLEX
Earthquake
ML15054A47323 February 2015Pre-Submittal Public Meeting with Energy Northwest to Discuss Upcoming Relief Request Regarding Reactor Water Cleanup SystemPacking leak
Hydrostatic
Nondestructive Examination
ML14127A6017 May 2014Summary of Annual Performance Assessment Meeting for Columbia Generating Station
ML13339B1455 December 2013Meeting Summary for Public Meeting with Energy Northwest Regarding Columbia Generating Station
ML13158A0116 June 2013Summary of End-of-Cycle Meeting with Energy Northwest Regarding Columbia Generating Station 2012 Performance
ML12293A05918 October 2012Summary of Meeting with Energy Northwest Regarding Columbia Generating Station Performance Improvement Initiatives
ML12292A16418 October 2012Energy Northwest Presentation Slide to NRC on 618-11 Remediation 10-18-2012Fire Protection Program
ML12157A27211 June 20125/31/2012 Summary of Telephone Conference with Licensees Regarding Near Term Task Force Recommendation 2.1 Seismic Reevaluations - Diablo Canyon, 1 and 2, San Onofre, Units 2 and 3, Columbia Generating Station, and Palo Verde, Units 1, 2, aEarthquake
ML12012011012 January 2012Summary of Meeting with Energy Northwest Regarding Columbia Generating Station Performance Improvement Initiatives
ML11263060320 September 2011Meeting Slides Preliminary Site-Specific Results of the License Renewal Environmental Review for Columbia Generating Station
ML11161A06123 August 201104/27/2010 Columbia Generating Station License Renewal Environmental Review (Log No.: 121007-20-NRC)License Renewal
Environmental Justice
ML1118700596 July 2011Licensee Handouts from 7/6/11 Meeting with Energy Northwest to Discuss the Status of Columbia Generating Station License Amendment Request on Power Range Neutron Monitoring System
ML1015405373 June 2010Summary of Meeting with Energy Northwest Regarding Columbia Generating Station End of Cycle Assessment
ML10056018924 February 2010Summary of Meeting with Energy Northwest Regarding Columbia Generating Station Performance and Improvement Initiatives
ML09288109614 October 2009Presentation Slides from October 14, 2009, Meeting with Energy Northwest, Department of Energy Re 618-11 Burial Ground Project Status (PM Session)
ML09288106214 October 2009Presentation Slides, Energy Re 618-11 Burial Ground Project StatusSafe Shutdown
ML06174057420 June 2006Summary of Meeting with Energy Northwest Regarding Columbia Generating Station
ML0604405788 February 2006Summary of Meeting with Energy Northwest Regarding Columbia Generating Station
ML0431001484 November 2004Summary of Meeting with Energy Northwest Company Regarding Operational Issues & Improvement Initiatives Related to Columbia Generating Station
ML04015045314 January 2004Summary of Meeting with Energy Northwest Columbia Generating Station General Engineering Issues and Licensee Improvement Innitiatives
ML02347009012 December 2002Columbia - Meeting Slides - Alternate Source Term ResubmittalGOTHIC
ML0227604042 October 2002Meeting Handouts from Energy Northwest Columbia Generating Station Energy Northwest/Framatome Anp Transition Cycle LicensingAnticipated operational occurrence
ML02081075619 March 2002Operator Licensing Workshop Meeting SummaryProbabilistic Risk Assessment
Significance Determination Process
Job Performance Measure
ML17037B84923 August 197508/21/1975 Summary of Meeting with Mark II Owners, Sargent & Lundy, Bechtel, Stone & Webster, Burns & Roe, and the NRC Staff to Discuss Load Factors and Load Combinations Proposed by the Mark II Owners and Their Architect ...Safe Shutdown Earthquake