ML24029A174 | 30 January 2024 | Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion | |
ML24003A181 | 8 January 2024 | Handout - Byron-Braidwood Core Monitoring and Support System LAR Pre-Submittal Meeting January 8,2024 | |
ML23345A036 | 11 December 2023 | ATWS Uet December 11, 2023 Pre-submittal Meeting Slides | Probabilistic Risk Assessment Large early release frequency |
ML23317A071 | 14 November 2023 | NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) | |
ML23229A483 | 17 August 2023 | RR 20-Year ISI Pre-Submittal NRC Meeting Handout | |
ML23229A013 | 17 August 2023 | Relief Request for Alternative Requirements for Byron Unit 1 Reactor Pressure Vessel Inservice Inspection Intervals NRC Meeting Handout | |
ML23255A104 | 11 August 2023 | Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout | |
ML23163A164 | 12 June 2023 | 2022 Braidwood/Byron End-of-Cycle Meeting Presentation | |
ML23033A666 | 9 February 2023 | Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna | |
ML23033A667 | 30 January 2023 | Public Call with Constellation January 30, 2023 (Slides) | |
ML22159A333 | 9 June 2022 | Presentation Slides for Braidwood and Byron 2021 End of Cycle Meeting | Coronavirus |
ML21314A447 | 10 November 2021 | Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval | Moisture barrier |
ML21166A372 | 15 June 2021 | End-of-Cycle Meeting Presentation | High Radiation Area Coronavirus |
ML20258A030 | 22 September 2020 | Decommissioning Licensing Action Submittal Plan for Byron and Dresden Stations Early Shutdowns | |
ML20261G732 | 16 September 2020 | Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a | Incorporated by reference Exemption Request |
ML20209A532 | 24 July 2020 | 2019 Braidwood and Byron End-of-Cycle Presentation | Coronavirus |
ML20178A420 | 30 June 2020 | NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response | Exemption Request Pandemic Coronavirus |
ML20170B021 | 23 June 2020 | NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections | Boric Acid Weld Overlay Nondestructive Examination Pandemic Coronavirus COVID-19 Pressure Boundary Leakage |
ML20169A559 | 16 June 2020 | Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) | Pandemic Coronavirus |
ML20163A655 | 16 June 2020 | 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections | Pandemic Coronavirus |
ML19318F951 | 20 November 2019 | Presentation Slides for November 20, 2019, Pre-Application Meeting - Request for Revision to Quality Assurance Program Internal Audit Frequency | Grace period |
ML19161A257 | 4 June 2019 | BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 | Incorporated by reference |
ML19151A660 | 31 May 2019 | BWR Fleet Mssv/Srv Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 | Incorporated by reference |
ML19022A200 | 23 January 2019 | Request for Use of ASME Code Case N-879 for Exelon Nuclear Power Plants | Loop seal |
ML18347B314 | 19 December 2018 | Bwrvip/Asme Relief Request Discussion December 19, 2018 | |
ML18334A216 | 30 November 2018 | Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 | GOTHIC |
ML18319A127 | 19 November 2018 | Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas | High Radiation Area Deep Dose Equivalent |
ML18218A112 | 8 August 2018 | Reactor Pressure Vessel Head Penetration Nozzle Post Peening Follow-up Inspection Relief Requests for Byron Unit 2 and Braidwood Unit 1 | Weld Overlay |
ML18054B359 | 27 February 2018 | Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli | |
ML17296A203 | 3 October 2017 | Accident Tolerant Fuel Lead Test Assembly Deployment | Shutdown Margin Coatings |
ML17142A238 | 25 May 2017 | OEDO-17-00280 - Briefing Package for Drop-In Visit on June 9, 2017, by Senior Management of Exelon Generation Company, LLC with Chairman Svinicki, Commissioner Baran, and Commissioner Burns | Probabilistic Risk Assessment Operator Manual Action FLEX Significance Determination Process |
ML17132A177 | 25 May 2017 | LAR for Control Room Cooling at Byron and Braidwood Stations | Post Accident Monitoring |
ML16334A464 | 5 December 2016 | Westinghouse Pre-Application Meeting: License Amendment Request to Modify Byron Station Facility Operating License in Support of the Molybdenum-99 Isotope Production Project - December 5, 2016 | |
ML16327A370 | 25 November 2016 | Enclosure 3: Exelon Byron Station Design (Meeting Handout) | |
ML16077A156 | 22 March 2016 | Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards | |
ML16075A329 | 16 March 2016 | OEDO-16-00165 - Briefing Package for Drop-In Visit on March 23, 2016, by Senior Management of Exelon Generation Company, LLC with the NRC Executive Director for Operations | Anticipated operational occurrence Enforcement Discretion Probabilistic Risk Assessment Significance Determination Process Open Phase Condition Risk-Informed Steering Committee Fuel cladding Generic Issues Program Backfit |
ML16062A422 | 2 March 2016 | Meeting Slides for March 7, 2016 Public Meeting to Discuss Backfit Appeal | Anticipated operational occurrence Backfit Power Uprate |
ML15342A101 | 9 December 2015 | TORMIS Computer Code Methodology Public Meeting Slides | Ultimate heat sink Finite Element Analysis Tornado Generated Missile Tornado Missile Protection TORMIS |
ML15232A683 | 27 August 2015 | Stations Auxiliary Feedwater System - Unit Cross-tie License Amendment Request | |
ML15209A972 | 30 July 2015 | Alloy 600 PWSCC Mitigation Plan for Reactor Vessel Head Penetration Nozzles Utilizing Cavitation Peening at Byron and Braidwood | Weld Overlay |
ML15133A473 | 20 May 2015 | Digital Upgrades of the Non-Safety Related NSSS Control Systems at Byron and Braidwood Stations | Unanalyzed Condition Anticipated operational occurrence Cyber Security |
ML14342A812 | 10 December 2014 | Presentation Slides for December 10, 2014 Meeting on Alloy 600 PWSCC Mitigation for Rvh Nozzles | Weld Overlay |
ML14261A111 | 22 September 2014 | 2014 NEI Fire Protection Information Forum NRC Public Slides | Coatings Multiple Spurious Operation Earthquake Fire Protection Program Very Early Warning Fire Detection Backfit |
ML14251A485 | 10 September 2014 | Byron/Braidwood Auxiliary Feedwater Cross-Tie | Probabilistic Risk Assessment |
ML14051A059 | 20 February 2014 | 2/06/2014, NRC Presentation Slides (Public Meeting with Exelon Generation Company, Nuclear Energy Industry, and Cask System Vendors to Discuss Issues with Spent Fuel Vacuum Drying Process) | Fuel cladding |
ML14051A066 | 20 February 2014 | 2/06/2014, Exelon Presentation Slides (Public Meeting with Exelon Generation Company, Nuclear Energy Industry, and Cask System Vendors to Discuss Issues with Spent Fuel Vacuum Drying Process) | |
ML13275A040 | 20 August 2013 | License Renewal Process and Environmental Scoping Meeting Slides | Aging Management Environmental Justice |
ML13227A392 | 14 August 2013 | 2012 Byron End-of-Cycle Public Meeting NRC Presentation | |
ML13227A389 | 14 August 2013 | 2012 Byron End-of-Cycle Public Meeting Licensee'S Presentation | Multiple Spurious Operation |