 SiteLER yearLER numberEvent dateReporting criterion
05000029/LER-1985-002, Forwards LER 85-002-00Yankee Rowe2,0852
05000029/LER-1985-006, Forwards LER 85-006-00Yankee Rowe2,0856
05000029/LER-1985-007, Forwards LER 85-007-00Yankee Rowe2,0857
05000029/LER-1985-008, Forwards LER 85-008-00Yankee Rowe2,0858
05000029/LER-1985-009, Forwards LER 85-009-00Yankee Rowe2,0859
05000029/LER-1985-010, Forwards LER 85-010-00 Re Inadvertent Reactor Scram During Maint ActivityYankee Rowe2,08510
05000029/LER-1986-001, Forwards LER 86-001-00 Re Tech Spec Violation on Util Emergency PlanYankee Rowe2,0861
05000029/LER-1986-002, Forwards LER 86-002-00 Re Insufficient Implementation Procedures for Offsite Dose Calculation ManualYankee Rowe2,0862
05000029/LER-1986-003, Forwards LER 86-003-00Yankee Rowe2,0863
05000029/LER-1986-004, Forwards LER 86-004-00 Re Reactor Scram Due to Loss of Heater Drain Pumps During Severe Lightning StormYankee Rowe2,0864
05000029/LER-1986-005, Forwards LER 86-005-00 Re Primary Coolant Dose Equivalent I-131 Greater than 1 Mci Per GYankee Rowe2,0865
05000029/LER-1986-007, Forwards LER 86-007-01,per 10CFR50.73(a)(2)(v)Yankee Rowe2,0867
05000029/LER-1986-010, Forwards LER-86-010-00.One Day Extension Granted by D Havercamp for Submission of LERYankee Rowe2,08610
05000029/LER-1986-011, Forwards LER 86-011-00Yankee Rowe2,08611
05000029/LER-1986-012, Forwards LER 86-012-00 Re Plant Trip on Low Steam Generator Level Due to Loss of Control AirYankee Rowe2,08612
05000029/LER-1986-013, Forwards LER 86-013-00 Re Reactor Scram Due to Operator ErrorYankee Rowe2,08613
05000029/LER-1986-014, Forwards LER-86-014-00Yankee Rowe2,08614
05000029/LER-1987-001, Forwards LER 87-001-00Yankee Rowe2,0871
05000029/LER-1987-002, Forwards LER 87-002-00Yankee Rowe2,0872
05000029/LER-1987-003, Forwards LER 87-003-00Yankee Rowe2,0873
05000029/LER-1987-004, Forwards LER 87-004-00Yankee Rowe2,0874
05000029/LER-2001-001Vermont Yankee2,001110 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications
05000133/LER-1978-003, Forwards LER 78-003/01T-0Humboldt Bay2,0783
05000133/LER-1982-004, Forwards LER 82-004/03L-0Humboldt Bay2,0824
05000133/LER-1982-005, Forwards LER 82-005/03L-0Humboldt Bay2,0825
05000133/LER-1982-006, Forwards LER 82-006/03L-0Humboldt Bay2,0826
05000133/LER-2010-0012,010124 June 2010
05000155/LER-1978-032, Forwards LER 78-032/03L-0.W/o EnclBig Rock Point2,07832
05000155/LER-1982-018, Forwards LER 82-018/01T-0Big Rock Point2,08218
05000155/LER-1982-019, Forwards LER 82-019/03L-0Big Rock Point2,08219
05000155/LER-1982-020, Forwards LER 82-020/03L-0Big Rock Point2,08220
05000155/LER-1982-021, Forwards LER 82-021/03L-0Big Rock Point2,08221
05000155/LER-1982-022, Forwards LER 82-022/03L-0Big Rock Point2,08222
05000155/LER-1987-009, Responds to NRC Re Violations Noted in Insp Rept 50-155/87-19.Events Cited in 870803 Encl LER 87-009.Issuance of Violation Contradicts NRC Policy to Encourage & Support Licensee Initiative to Identify & Correct ProblemsBig Rock Point2,0879
05000155/LER-1989-006, Updates 900405 Submittal of LER 89-006,Rev 1 Re Defects in Fire Penetration SealsBig Rock Point2,0896
05000155/LER-1990-002, Requests Extension of Due Date for Radiation on-the-job Training to 901101,per 900518 LER-90-002 Describing Violation Involving Unqualified Technician Assigned to Shift Compliment.Delay Due to Forced OutageBig Rock Point2,0902
05000155/LER-1992-002, Advises That Commitment Due Dates for LER 92-002 Re as-found Setpoint Failure of Liquid Poison Relief Valve RV-5049 & LER 92-009 Re Reactor Scram During Plant Startup for Cycle 26 Overdue.Operator Training Delayed Until 930301Big Rock Point2,0922
05000155/LER-1992-008, Advises That Util Terminated Corrective Actions Re LER 92-008 of Loss of Station Power 125 Volt Dc sys.SOP-28 Has Been Deleted in Entirety.Commitments No Longer ApplicableBig Rock Point2,0928
05000155/LER-1992-010, Informs That Initial Pressure Regulator Bellows W/One Operating Cycle (About 12 Months) of Satisfactory Performance Will Be Installed in Lieu of New Bellows,In Response to LER 92-010Big Rock Point2,09210
05000155/LER-1998-001, Forwards LER 98-001-00 Re Discovery During Facility Decommissioning of Severed Liquid Poison Tank Discharge Pipe.Rept Being Submitted IAW 10CFR50.72(b)(2)(iii) & 10CFR50.73(a)(2)(i)(B)Big Rock Point2,0981
05000206/LER-1982-015, Forwards LER 82-015/99X-0.Detailed Event Analysis SubmittedSan Onofre2,08215
05000206/LER-1982-016, Forwards LER 82-016/01T-0.Detailed Event Analysis SubmittedSan Onofre2,08216
05000206/LER-1982-017, Forwards LER 82-017/01X-1.Detailed Event Analysis EnclSan Onofre2,08217
05000206/LER-1988-001, Forwards Revised Environ Qualification Master List for Electrical Equipment to Address Deficiencies in LER 88-01. All Environ Qualification Deficiencies,Identified During mid-cycle Maint Outage,Corrected or ResolvedSan Onofre2,0881
05000206/LER-1997-001, Forwards LER 97-001-02 Re Missed Testing/Insp of Security Sys.Util Has Noted That Counselling of Individual Was Inadvertently Not Completed & LER Is Being Revised, AccordinglySan Onofre2,0971
05000206/LER-1997-002, Forwards LER 97-002-00 Re Loss of Single Copy of Security Contingency Plan.Revised LER Will Be Submitted by 971219 After Investigation Into Cause & Development of Corrective ActionsSan Onofre2,0972
05000206/LER-1997-003, Forwards LER 97-003,providing 30-day follow-up Rept Required by 10CFR73.71(d) for Security Computer Sys Being Inoperable for Few MinutesSan Onofre2,0973
05000206/LER-1998-001, Forwards LER 98-001-00 Which Provides 30-day follow-up Rept Required by 10CFR73.71(d) for Security Computer Sys Being Inoperable for Few MinutesSan Onofre2,0981
05000206/LER-1998-003, Forwards LER 98-003-00,involving Unauthorized Access to Protected AreaSan Onofre2,0983
05000206/LER-1998-004, Forwards LER 98-004-01,re Safeguard Drawings That Were Incorrectly Decontrolled,Iaw NUREG-1022,rev 1.No New Commitments Made within LERSan Onofre2,0984