Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
05000454/LER-2017-00125 April 20171 OF 4
LER 17-001-00 for Byron, Unit 1, Regarding Volumetric and Surface Examinations of Reactor Pressure Vessel Head Penetration Nozzles Identify Indications Attributed to Primary Water Stress Corrosion Cracking and Minor Subsurface Void Enlargement from..
Through-Wall Leak
05000455/LER-2016-00115 February 2017Manual Reactor Trip due to Circuit Breaker Failure that Caused Actuation of Feedwater Hammer Prevention System with Automatic Isolation of Feedwater to Two Steam Generators and Low Steam Generator Levels
LER 16-001-01 for Byron Station, Unit 2 Regarding Manual Reactor Trip Due to Circuit Breaker Failure that Caused Actuation of Feedwater Hammer Prevention System with Automatic Isolation of Feedwater to Two Steam Generators and Low Steam Generator....
05000454/LER-2016-0013 May 2016Auxiliary Feedwater Diesel Intake Design Deficiency Related to Turbine Building High Energy Line Break Resulted in an Unanalyzed Condition Due to Insufficient Validation of Vendor Analysis Inputs
LER 16-001-00 for Byron, Unit 1, Regarding Auxiliary Feedwater Diesel Intake Design Deficiency Related to Turbine Building High Energy Line Break Resulted in an Unanalyzed Condition Due to Insufficient Validation of Vendor Analysis Inputs
Unanalyzed Condition
Fire Watch
BYRON 2004-0033, Supplemental One to Licensee Event Report (LER) 454-2003-003-00, Licensed Maximum Power Level Exceeded Due to Inaccuracies in Feedwater Ultrasonic Flow Measurements Caused by Signal Noise Contamination31 March 2004Supplemental One to Licensee Event Report (LER) 454-2003-003-00, Licensed Maximum Power Level Exceeded Due to Inaccuracies in Feedwater Ultrasonic Flow Measurements Caused by Signal Noise Contamination
BYRON 2002-0115, LER 02-S001-00 for Byron Station, Units 1 and 2, Unescorted Access Granted Based on Falsified Information Provided by an Individual25 October 2002LER 02-S001-00 for Byron Station, Units 1 and 2, Unescorted Access Granted Based on Falsified Information Provided by an IndividualFitness for Duty