IR 05000387/2023004 | 7 February 2024 | Integrated Inspection Report 05000387/2023004 and 05000388/2023004 | |
PLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval | 4 January 2024 | Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval | |
PLA-8077, Emergency Plan Revision 67 (PLA-8077) | 27 December 2023 | Emergency Plan Revision 67 (PLA-8077) | |
IR 05000387/2023010 | 11 December 2023 | Fire Protection Team Inspection Report 05000387/2023010 and 05000388/2023010 | Safe Shutdown Fire Barrier Aging Management Time Critical Operator Action License Renewal Fire Protection Program |
PLA-8089, Submittal of Revision to Inservice Testing Program Plan | 5 December 2023 | Submittal of Revision to Inservice Testing Program Plan | |
PLA-8084, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 | 29 November 2023 | Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 | Surveillance Frequency Control Program |
ML23345A068 | 28 November 2023 | Technical Specification Bases, Manual | Shutdown Margin Ultimate heat sink Anticipated operational occurrence Water Inventory Control Post Accident Monitoring Hydrostatic Surveillance Frequency Control Program Scram Discharge Volume Battery sizing |
PLA-8091, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091) | 8 November 2023 | Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091) | |
IR 05000387/2023003 | 3 November 2023 | Integrated Inspection Report 05000387/2023003 and 05000388/2023003 | Enforcement Discretion Temporary Modification Functionality Assessment Aging Management Significance Determination Process Foreign Material Exclusion Operability Determination License Renewal Through-Wall Leak Offsite Circuit Fire Protection Program Exclusive Use |
PLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program | 2 November 2023 | Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program | Shutdown Margin Surveillance Frequency Control Program Deep Dose Equivalent Pressure Boundary Leakage Unidentified leakage |
ML23291A113 | 12 October 2023 | Submittal of Revision 71 to Updated Final Safety Analysis Report and Revision 25 to Fire Protection Review Report | |
ML23279A061 | 5 October 2023 | Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) | Commercial Grade Dedication |
ML23277A041 | 5 October 2023 | Notification of Commercial Grade Dedication Inspection (05000387/2024011 and 05000388/2024011) and Request for Information | Commercial Grade Dedication |
IR 05000387/2023301 | 20 September 2023 | Initial Operator Licensing Examination Report 05000387/2023301 and 05000388/2023301 | |
ML23254A024 | 6 September 2023 | Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) | |
IR 05000387/2023005 | 31 August 2023 | Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2023005 and 05000388/2023005) | Commercial Grade Dedication Cyber Security License Renewal |
ML23228A195 | 21 August 2023 | Summary of August 10, 2023, Public Observation Meeting Re. Proposed Alternative | Grace period |
PLA-8080, Proposed Relief for Valve 251130 (PLA-8080) | 14 August 2023 | Proposed Relief for Valve 251130 (PLA-8080) | Missed surveillance |
PLA-8074, Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval | 3 August 2023 | Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval | Hydrostatic Incorporated by reference Power-Operated Valves |
IR 05000387/2023002 | 1 August 2023 | Integrated Inspection Report 05000387/2023002 and 05000388/2023002 | Shutdown Margin Enforcement Discretion Nondestructive Examination Temporary Modification Functionality Assessment Aging Management Operability Determination License Renewal Liquid penetrant Fire Protection Program Dissimilar Metal Weld Power change |
ML23195A185 | 27 July 2023 | Correction to Technical Specifications Page 3.3-73 in Amendment No. 265 | |
PLA-8076, Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076) | 20 July 2023 | Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076) | |
ML23201A015 | 20 July 2023 | Operator Licensing Examination Approval | |
ML23200A101 | 19 July 2023 | Notification of Conduct of a Fire Protection Team Inspection | Safe Shutdown Probabilistic Risk Assessment Temporary Modification Aging Management Fire Protection Program |
ML23193A006 | 12 July 2023 | Requalification Program Inspection | |
PLA-8078, Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-8078 | 5 July 2023 | Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-8078 | Shutdown Margin |
ML23163A101 | 12 June 2023 | 10 CFR 50.46 Annual Report (Pla 8065) | |
PLA-8054, Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence | 8 June 2023 | Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence | Shutdown Margin Anticipated operational occurrence Incorporated by reference Surveillance Frequency Control Program Overtravel Fuel cladding |
IR 05000387/2023401 | 7 June 2023 | Security Baseline Inspection Report 05000387/2023401 and 05000388/2023401 | Fitness for Duty Fatigue Rule |
PLA-8073, Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval | 1 June 2023 | Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval | |
PLA-8064, Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064) | 17 May 2023 | Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064) | |
ML23132A321 | 17 May 2023 | Associated Independent Spent Fuel Storage Installation - Issuance of Amendment Nos. 285 and 269 Related to Order Approving Transfer of Licenses | |
PLA-8067, Notification of Completion of Emergence from Bankruptcy (PLA-8067) | 17 May 2023 | Notification of Completion of Emergence from Bankruptcy (PLA-8067) | |
IR 05000387/2023001 | 12 May 2023 | Integrated Inspection Report 05000387/2023001 and 05000388/2023001 | High Radiation Area Enforcement Discretion Probabilistic Risk Assessment Temporary Modification Functionality Assessment FLEX Aging Management Significance Determination Process Scram Discharge Volume Operability Determination License Renewal Fire Protection Program Coast down Unidentified leakage |
PLA-8066, Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-8066 | 8 May 2023 | Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-8066 | |
PLA-8053, Radiation Exposure Information and Reporting System | 27 April 2023 | Radiation Exposure Information and Reporting System | |
PLA-8058, Annual Radiological Environmental Operating Report (PLA-8058) | 26 April 2023 | Annual Radiological Environmental Operating Report (PLA-8058) | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Chernobyl Tritium Stolen |
PLA-8041, Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041) | 25 April 2023 | Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041) | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Power change |
PLA-8047, 2022 Annual Environmental Operating Report (Nonradiological), PLA-8047 | 19 April 2023 | 2022 Annual Environmental Operating Report (Nonradiological), PLA-8047 | Zebra Mussel Biofouling |
PLA-8062, Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-8062 | 11 April 2023 | Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-8062 | Anchor Darling Surveillance Frequency Control Program Pressure Boundary Leakage |
PLA-8061, Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-8061 | 10 April 2023 | Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-8061 | Reactor Vessel Water Level |
ML23090A230 | 31 March 2023 | NRC Decommissioning Funding Status Report PLA-8049 | |
PLA-8060, Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060) | 30 March 2023 | Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060) | |
ML23095A057 | 29 March 2023 | NRC Decommissioning Funding Status Report December 31, 2022 | |
PLA-8057, Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-8057 | 15 March 2023 | Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-8057 | |
ML23065A196 | 2 March 2023 | EN 56387 Paragon - Part 21 Report Re Defect Identified in Automatic Transfer Switch Pn: NLI-ATS480A400X1 | |
IR 05000387/2022006 | 1 March 2023 | Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2022006 and 05000388/2022006) | Commercial Grade Dedication Cyber Security License Renewal Exemption Request COVID-19 |
PLA-8052, (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums | 13 February 2023 | (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums | |
IR 05000387/2022004 | 8 February 2023 | Integrated Inspection Report 05000387/2022004 and 05000388/2022004 | Stroke time Enforcement Discretion Temporary Modification Cyber Security Functionality Assessment Scram Discharge Volume Operability Determination Severe Accident Management Guideline License Renewal Through-Wall Leak Fire Protection Program Unidentified leakage |
ML23010A088 | 15 January 2023 | Summary of Regulatory Audit in Support of License Amendment Request to Revise Control Rod Technical Specifications | Shutdown Margin |