Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML24038A032 | 7 February 2024 | (Vcsns), Unit 1, 10 CFR 21 Report - Emergency Diesel Generator Flash Contactor Relay | |
IR 05000395/2023004 | 31 January 2024 | Integrated Inspection Report 05000395/2023004 | Enforcement Discretion Temporary Modification Functionality Assessment FLEX Significance Determination Process Operability Determination Fire Protection Program Overspeed trip |
ML24022A158 | 22 January 2024 | (Vcsns), Unit 1 - Reply to a Notice of Violation: EA-23-093 | |
ML24022A120 | 22 January 2024 | Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000395/2024403) | |
ML24018A011 | 18 January 2024 | CFR 21 Report Emergency Diesel Generator Fuel Oil Piping | |
IR 05000395/2024011 | 17 January 2024 | Notification of VC Summer Station Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000395/2024011 | |
ML23361A104 | 21 December 2023 | Inservice Testing Program for Pumps and Valves Fifth Interval Update and Associated Relief and Alternative Requests | Stroke time Power-Operated Valves |
IR 05000395/2023091 | 21 December 2023 | Final Significance Determination of a White Finding and Notice of Violation and Assessment Followup Letternrc Inspection Report 05000395/2023091 | Probabilistic Risk Assessment Condition Adverse to Quality FLEX Significance Determination Process |
ML23354A180 | 20 December 2023 | 301 Examination Report with Cover Letter | |
ML23347A049 | 12 December 2023 | Technical Specification Bases Changes Updated Through November 2023 | |
ML23334A246 | 30 November 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | Time of Discovery Contraband Safeguards Contingency Plan Preemption Authority Exemption Request |
ML23334A237 | 30 November 2023 | (Vvsns), Unit 1 - Annual Commitment Change Summary Report | |
ML23332A194 | 28 November 2023 | (Vcsns), Unit 1, Correction of Typographical Error in License Amendment Request - Inverter Allowed Outage Time (AOT) Extension | |
ML23317A224 | 9 November 2023 | (Vcsns), Unit 1 - License Amendment Request - Inverter Allowed Outage Time (AOT) Extension | Safe Shutdown Internal Flooding Probabilistic Risk Assessment Earthquake Maintenance Rule Program Fuel cladding |
ML23289A117 | 3 November 2023 | Tribal Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA | License Renewal Subsequent License Renewal |
ML23289A115 | 3 November 2023 | Ltr to R. Nelson - Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA | License Renewal Subsequent License Renewal |
ML23289A116 | 3 November 2023 | Ltr to W. Emerson - Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA | License Renewal Subsequent License Renewal |
IR 05000395/2023403 | 1 November 2023 | Material Control and Accounting Program Inspection Report 05000395/2023403 Cover | Affidavit |
IR 05000395/2023003 | 1 November 2023 | Integrated Inspection Report 05000395/2023003 | Boric Acid Stroke time Functionality Assessment FLEX Operability Determination Fire Protection Program |
ML23284A179 | 16 October 2023 | Subsequent License Renewal Application Online Reference Portal | License Renewal Subsequent License Renewal |
ML23275A014 | 11 October 2023 | SLRA - Acceptance and Opportunity for Hearing - Letter | Subsequent License Renewal |
ML23284A166 | 10 October 2023 | (Vcsns), Unit 1 - Request for Regulatory Conference; (EA-23-093) | |
IR 05000395/2023090 | 4 October 2023 | NRC Inspection Report 05000395/2023090 and Preliminary Yellow Finding and Apparent Violation | High winds Mission time Internal Flooding Probabilistic Risk Assessment Condition Adverse to Quality FLEX Significance Determination Process Large early release frequency Through-Wall Leak |
IR 05000395/2023011 | 27 September 2023 | Focused Engineering Inspection Report 05000395/2023011 | Commercial Grade Dedication |
ML23250A311 | 20 September 2023 | Request to Revise Reactor Vessel Material Surveillance Capsule Withdrawal Schedules | Aging Management License Renewal Subsequent License Renewal Power Uprate |
ML23244A235 | 18 September 2023 | Request to Use a Subsequent Edition of the ASME Code, Section XI | Incorporated by reference |
ML23230A001 | 15 September 2023 | Request to Use a Provision of a Previous Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Non-Destructive Examinations | Non-Destructive Examination Nondestructive Examination Incorporated by reference |
ML23235A043 | 5 September 2023 | Receipt and Availability of the Subsequent License Renewal Application | |
IR 05000395/2023401 | 30 August 2023 | Security Baseline Inspection Report 05000395/2023401 | |
ML23242A119 | 29 August 2023 | (Vcsns), Unit 1 - Inservice Inspection (ISI) Owner'S Activity Report (OAR) for Refueling Outage 27 | Coatings Moisture barrier |
ML23243B036 | 25 August 2023 | Request for FEMA Consultation on the Dominion Energy Proposal to Consolidate the Emergency Operations Facility for the Virgil C. Summer Nuclear Station Unit 1 | |
IR 05000395/2023005 | 23 August 2023 | Updated Inspection Plan for Virgil C. Summer Nuclear Station (Report 05000395 2023005) | Fitness for Duty Cyber Security |
ML23233A175 | 17 August 2023 | Application for Subsequent Renewed Operating License | |
IR 05000395/2023002 | 14 August 2023 | Integrated Inspection Report - Integrated Inspection Report 05000395/2023002 and Apparent Violation | Boric Acid High Radiation Area Mission time Stroke time Enforcement Discretion Coatings Nondestructive Examination Temporary Modification Functionality Assessment Locked High Radiation Area Condition Adverse to Quality Aging Management Significance Determination Process Operability Determination Fire Protection Program Scaffolding Power change |
IR 05000395/2023010 | 12 August 2023 | Biennial Problem Identification and Resolution Inspection Report 05000395/2023010 | Operability Determination |
ML23207A110 | 26 July 2023 | NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations | |
IR 05000395/2023441 | 17 July 2023 | 95001 Supplemental Inspection Report 05000395/2023441 and Follow Up Assessment Letter | Affidavit |
ML23190A001 | 9 July 2023 | Special Report 2023-003 Inoperable Radiation Monitoring Instrumentation Channel | |
ML23187A509 | 6 July 2023 | Request for Federal Emergency Management Agency Consultation on the Dominion Energy Proposal to Consolidate the Emergency Operations Facility for the Virgil C. Summer Nuclear Station Unit 1 | |
ML23178A168 | 26 June 2023 | 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 | |
ML23173A105 | 22 June 2023 | Special Report 2023-002 Inoperable Loose-Part Monitoring System Channel | |
ML23163A235 | 12 June 2023 | Request to Use a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for the SPS Sixth Inservice Inspection (Isi) Intervals and VCSNS Fifth ISI Interval | Non-Destructive Examination |
ML23159A233 | 8 June 2023 | License Amendment Request - Emergency Response Organization Augmentation Time Change, Emergency Operations Facility Relocation and Other Emergency Plan Changes | Health Physics Network Grab sample Anticipated operational occurrence Probabilistic Risk Assessment FLEX B.5.b Earthquake Fuel cladding Minimum staff Fire Protection Program |
ML23156A309 | 5 June 2023 | Requalification Program Inspection Virgil C. Summer Nuclear Station Unit 1 - 05000395/2023003 |