ML24032A02031 January 2024NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2023
ML23319A24529 January 2024Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 IssuesCyber Security
Surveillance Frequency Control Program
Safeguards Contingency Plan
Fire Protection Program
CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions17 January 2024Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions
ML24018A01417 January 2024Engine Systems, Inc., Report No. 10CFR21-0137, Rev. 1, 56913-EN 56913
ML24011A31811 January 2024Submittal of Discharge Monitoring Report (Dmr), October 2023
ML24011A31711 January 2024Submittal of Discharge Monitoring Report (Dmr), September 2023
ML24011A32011 January 2024Submittal of Discharge Monitoring Report (Dmr), December 2023
ML24011A31611 January 2024Submittal of Discharge Monitoring Report (Dmr), August 2023
ML24011A31911 January 2024Submittal of Discharge Monitoring Report (Dmr), November 2023
IR 05000327/202344211 January 202495001 Supplemental Inspection Report 05000327/2023442 and 05000328/2023442 and Follow-Up Assessment Letter
ML24010A21310 January 2024CFR 21.21 Final Report Regarding Siemens Medium Voltage Circuit Breakers
ML24018A0954 January 2024Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance Report No. 10CFR21-0137, Rev. 0
ML24004A0333 January 2024Interim Report of a Deviation or Failure to Comply Crompton Instruments Type 077 Ammeter
ML24004A0403 January 2024Response to NRCs November 8, 2023, Request for Additional Information - Related to Independent Spent Fuel Storage Installation
CNL-23-068, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation21 December 2023Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation
CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)18 December 2023Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)Safe Shutdown
Anticipated operational occurrence
ML23346A12212 December 2023Annual Non-Radiological Environmental Operating Report - 2023
IR 05000327/202342028 November 2023Security Baseline Inspection Report 05000327/2023420 and 05000328/2023420Affidavit
CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions27 November 2023Central Emergency Control Center Emergency Plan Implementing Procedure Revisions
ML23324A4369 November 2023Exam Corporate Notification Letter Aka 210-day Letter
ML23307A0828 November 2023Request for Additional Information August 4, 2022, Exemption Request for Deviating from the Conditions of Certificate of Compliance No. 1032, Amendment No. 3, Related to Sequoyah Nuclear Plant Independent Spent Fuel Storage InstallationExemption Request
IR 05000327/20230033 November 2023Integrated Inspection Report 05000327/2023003 and 05000328/2023003Temporary Modification
Functionality Assessment
Operability Determination
Fire Protection Program
ML23306A1592 November 2023Enforcement Action EA-22-129 Inspection Readiness Notification
ML23292A07919 October 2023Tennessee Valley Authority - Emergency Plan Implementing Procedure Revision, Includes EPIP-5, Revision 58, General Emergency
IR 05000327/202301116 October 2023Triennial Fire Protection Inspection Report 05000327/2023011 and 05000328/2023011Hot Short
Safe Shutdown
Fire Barrier
Operator Manual Action
Emergency Lighting
Fire Protection Program
Fire Watch
ML23285A08812 October 2023Submittal of Sequoyah Nuclear Plant, Units 1 and 2, Submittal of Updated Final Safety Analysis Report Amendment 31Aging Management
ML23284A42511 October 202310 CFR 50.59 and 10 CFR 72.48 Changes, Tests, and Experiments Summary Report; Commitment Summary Report; and Update to the Fire Protection ReportShutdown Margin
Anticipated operational occurrence
Temporary Modification
Incorporated by reference
FLEX
Fuel cladding
ML23283A27910 October 2023Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Requirements ManualUnanalyzed Condition
Boric Acid
Time of Discovery
High winds
Shutdown Margin
Anticipated operational occurrence
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Functionality Assessment
Incorporated by reference
Pressure and Temperature Limits Report
Design basis earthquake
Operability Determination
Earthquake
Maintenance Rule Program
ML23279A0615 October 2023Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs)Commercial Grade Dedication
ML23277A0464 October 2023Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Specification Bases
ML23275A02729 September 2023Submittal of Discharge Monitoring Report (DMR) Quality Assurance Study 43 Final Report 2023
ML23271A16628 September 2023Registration of Spent Fuel Storage Cask Pursuant to 10 CFR 72.212(b)(2)
CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-20 September 2023Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03Coatings
Surveillance Frequency Control Program
Fuel cladding
CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision20 September 2023Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision
IR 05000327/202340314 September 2023Cyber Security Inspection Report 05000327/2023403 and 05000328/2023403 (Cover Letter)Cyber Security
Affidavit
ML23257A00614 September 2023Enforcement Action EA-22-129 Inspection Postponement Request
ML23254A21911 September 2023Emergency Plan Implementing Procedure Revisions
ML23254A0657 September 2023Registration of Spent Fuel Storage Cask Pursuant to 10 CFR 72.212(b)(2)
CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 645 September 2023Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64
IR 05000327/202300529 August 2023Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2023005 and 05000328/2023005Commercial Grade Dedication
Enforcement Discretion
Aging Management
License Renewal
ML23233A01217 August 2023Unit 1 Cycle 25 Refueling Outage - 90-Day Inservice Inspection Summary Report - Supplement
ML23233A01415 August 2023Discharge Monitoring Report (Dmr), July 2023
ML23215A1213 August 2023301 Exam Administrative Items (2B) Normal ReleaseProbabilistic Risk Assessment
Job Performance Measure
ML23215A1573 August 2023Enforcement Action EA-22-129 Inspection Readiness Notification
CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2 August 2023Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)Coatings
Surveillance Frequency Control Program
Fuel cladding
ML23192A44731 July 2023Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards InformationProbabilistic Risk Assessment
Fukushima Dai-Ichi
Earthquake