ML24009A115 | 29 January 2024 | Exemption from Select Requirements of 10 CFR Part 73 (EPID L 2023 LLE-0043 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) | Time of Discovery Contraband Condition Adverse to Quality Safeguards Contingency Plan Exemption Request |
L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) | 25 January 2024 | Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) | |
ML24022A065 | 22 January 2024 | Senior Reactor and Reactor Operator Initial License Examinations | |
L-2024-003, NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report | 11 January 2024 | NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report | Stretch Power Uprate |
ML23312A182 | 22 December 2023 | Issuance of Amendment No. 172 Revision to Cooling Tower Service Water Loop or Cell Requirements | High winds Ultimate heat sink Safe Shutdown Earthquake Enforcement Discretion Probabilistic Risk Assessment Surveillance Frequency Control Program Earthquake Fuel cladding |
L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update | 15 December 2023 | Quality Assurance Topical Report (FPL-1) Revision 30 Update | Fitness for Duty Shutdown Margin Offsite Dose Calculation Manual Commercial Grade Dedication Post Accident Monitoring Probabilistic Risk Assessment Coatings Nondestructive Examination Temporary Modification Cyber Security Condition Adverse to Quality Aging Management Process Control Program Operability Determination Safeguards Contingency Plan License Renewal Maintenance Rule Program Fire Protection Program Grace period Power Uprate |
L-2023-180, Submittal of Changes to the Technical Specification Bases | 13 December 2023 | Submittal of Changes to the Technical Specification Bases | Surveillance Frequency Control Program |
L-2023-177, Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule | 29 November 2023 | Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule | Exemption Request |
L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654 | 28 November 2023 | Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, | Health Physics Network High Radiation Area Offsite Dose Calculation Manual Met Tower Incorporated by reference FLEX Severe Accident Management Guideline Earthquake Deep Dose Equivalent Minimum staff Fire Protection Program Grace period Overexposure |
L-2023-160, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule | 16 November 2023 | Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule | Contraband Exemption Request |
ML23318A077 | 14 November 2023 | Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000443/2024011 | Probabilistic Risk Assessment Operability Determination |
IR 05000443/2023403 | 7 November 2023 | Security Baseline Inspection Report 05000443/2023403 and Independent Spent Fuel Storage Installation 07200063/2023401 | Affidavit |
IR 05000443/2023003 | 6 November 2023 | Integrated Inspection Report 05000443/2023003 | Safe Shutdown Safe Shutdown Earthquake Internal Flooding Hydrostatic Enforcement Discretion Temporary Modification Functionality Assessment Operability Determination COVID-19 Fire Protection Program |
IR 05000443/2023010 | 19 October 2023 | Triennial Fire Protection Inspection Report 05000443/2023010 | Safe Shutdown Time Critical Operator Action Fire Protection Program |
ML23346A132 | 6 October 2023 | Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published | Pandemic COVID-19 Siren |
ML23275A052 | 2 October 2023 | Requalification Program Inspection | |
IR 05000443/2023401 | 8 September 2023 | Cybersecurity Inspection Report 05000443/2023401 (Cover Letter Only) | Affidavit |
IR 05000443/2023420 | 5 September 2023 | Security Baseline Inspection Report 05000443/2023420 | Affidavit |
IR 05000443/2023005 | 31 August 2023 | Updated Inspection Plan for Seabrook Station (Report 05000443/2023005) | Cyber Security |
L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update | 17 August 2023 | Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update | |
IR 05000443/2023302 | 16 August 2023 | Operator Licensing Retake Examination Report 05000443/2023302 | |
IR 05000443/2023002 | 8 August 2023 | Integrated Inspection Report 05000443/2023002 | Safe Shutdown Boric Acid High Radiation Area Fire Barrier Internal Flooding Enforcement Discretion Nondestructive Examination Functionality Assessment Locked High Radiation Area Significance Determination Process Operability Determination Maintenance Rule Program Liquid penetrant Continuous fire watch Fire Protection Program Fire Watch Hourly Fire Watch |
L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 | 7 August 2023 | and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 | Health Physics Network Cyber Security FLEX B.5.b Severe Accident Management Guideline Minimum staff Siren |
ML23201A087 | 3 August 2023 | Audit Plan in Support of Review of License Amendment | FLEX |
L-2023-104, Preparation and Scheduling of Operator Licensing Examinations | 3 August 2023 | Preparation and Scheduling of Operator Licensing Examinations | |
L-2023-103, Inservice Inspection Examination Report | 3 August 2023 | Inservice Inspection Examination Report | Moisture barrier |
ML23192A078 | 11 July 2023 | Operator Licensing Retake Examination Approval | |
L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) | 29 June 2023 | Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) | |
SBK-L-23053, Radiological Emergency Plan (Ssrep), Revision 80 | 22 June 2023 | Radiological Emergency Plan (Ssrep), Revision 80 | Health Physics Network |
ML23157A072 | 6 June 2023 | Notification of Conduct of a Fire Protection Team Inspection | Safe Shutdown Probabilistic Risk Assessment Temporary Modification Large early release frequency Time Critical Operator Action Fire Protection Program |
L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update | 2 June 2023 | Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update | Decommissioning Funding Plan Authorized possession limits |
L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal | 22 May 2023 | NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal | Fitness for Duty Shutdown Margin Offsite Dose Calculation Manual Commercial Grade Dedication Post Accident Monitoring Probabilistic Risk Assessment Coatings Nondestructive Examination Temporary Modification Cyber Security Condition Adverse to Quality Aging Management Process Control Program Operability Determination Safeguards Contingency Plan License Renewal Maintenance Rule Program Fire Protection Program Grace period Power Uprate |
IR 05000443/2023301 | 15 May 2023 | Initial Operator Licensing Examination Report 05000443/2023301 | |
L-2023-064, License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves | 11 May 2023 | License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves | |
IR 05000443/2023001 | 11 May 2023 | Integrated Inspection Report 05000443/2023001 | Safe Shutdown Earthquake Functionality Assessment Operability Determination Through-Wall Leak Fire Protection Program Power change Operability Assessment |
ML23129A031 | 9 May 2023 | Reactor Operator Retake License Examination | |
ML23117A365 | 4 May 2023 | Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request to Remove Period of Applicability from PTL and Low Temperature Over Pressure Protection Curves | Safe Shutdown Probabilistic Risk Assessment |
SBK-L-23044, 2022 Annual Radiological Environmental Operating Report | 28 April 2023 | 2022 Annual Radiological Environmental Operating Report | Annual Radiological Environmental Operating Report |
SBK-L-23031, 2022 Annual Radioactive Effluent Release Report | 28 April 2023 | 2022 Annual Radioactive Effluent Release Report | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program |
SBK-L-23033, 2022 Annual Environmental Operating Report | 11 April 2023 | 2022 Annual Environmental Operating Report | |
L-2023-053, Core Operating Limits Report for Cycle 23 | 5 April 2023 | Core Operating Limits Report for Cycle 23 | Boric Acid Shutdown Margin |
ML23088A152 | 29 March 2023 | Summary of Meeting Between Nrc/Region I and C-10 - Questions Regarding Seabrook 4Q2022 Inspection Report | |
L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update | 28 March 2023 | Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update | Decommissioning Funding Plan Authorized possession limits |
L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications | 27 March 2023 | and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications | Fuel cladding |
ML23073A156 | 23 March 2023 | Relief Request 4RA-22-01, Relief from the Requirements of the ASME Code | Nondestructive Examination |
L-2023-012, License Amendment Request 23-01, Remove Period of Applicability (Poa) from Pressure Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves | 15 March 2023 | License Amendment Request 23-01, Remove Period of Applicability (Poa) from Pressure Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves | Anticipated operational occurrence Hydrostatic Probabilistic Risk Assessment Nonconservative Technical Specifications |
L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 | 15 March 2023 | Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 | Non-Destructive Examination Probabilistic Risk Assessment |
L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) | 10 March 2023 | and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) | |
L-2023-023, Revised Steam Generator Tube Inspection Report | 3 March 2023 | Revised Steam Generator Tube Inspection Report | Non-Destructive Examination |
ML23020A100 | 3 March 2023 | OEDO-22-00419 - 2.206 Petition for Seabrook Station Structure Concrete Concerns (EPID L-2022-CRS-0000)- Closure Letter | Functionality Assessment Significance Determination Process |