Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
IR 05000272/20230045 February 2024Integrated Inspection Report 05000272/2023004 and 05000311/2023004
ML24009A10226 January 2024Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting))
IR 05000272/202340122 January 2024Material Control and Accounting Program Inspection Report 05000272/2023401 and 05000311/2023401
ML24004A1548 January 2024Notification of Conduct of a Fire Protection Team Inspection
LR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days7 December 2023Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days
ML23270C00729 November 2023Notice of Proposed Amendment to Decommissioning Trust Agreement
LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion29 November 2023Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow ConversionLoop seal
ML23324A30717 November 2023Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications ImplementationTime of Discovery
Contraband
Exemption Request
IR 05000272/202300313 November 2023Integrated Inspection Report 05000272/2023003 and 05000311/2023003Boric Acid
Temporary Modification
Functionality Assessment
Significance Determination Process
Operability Determination
Maintenance Rule Program
Biofouling
Through Wall Leak
Fire Protection Program
Operability Assessment
LR-N23-0072, Core Operating Limits Report Cycle 301 November 2023Core Operating Limits Report Cycle 30
IR 05000272/202301012 October 2023Biennial Problem Identification and Resolution Inspection Report O5000272/2023010 and 05000311/2023010Safe Shutdown
Cyber Security
Significance Determination Process
Fire Protection Program
IR 05000272/202340212 October 2023and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only)Affidavit
LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement8 September 2023and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement
ML23249A2616 September 2023License Amendment Request to Modify the Salem and Hope Creek Exclusion Area BoundaryDeep Dose Equivalent
IR 05000272/202300531 August 2023Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005)Fitness for Duty
Cyber Security
ML23233A07621 August 2023Requalification Program Inspection
ML23192A82114 August 2023and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower LocationFire Protection Program
IR 05000272/20230029 August 2023Integrated Inspection Report 05000272/2023002 and 05000311/2023002Safe Shutdown
Boric Acid
High Radiation Area
Fire Barrier
Internal Flooding
Fire impairment
Nondestructive Examination
Temporary Modification
Functionality Assessment
Locked High Radiation Area
Significance Determination Process
Operability Determination
COVID-19
Fire Protection Program
Fire Watch
Dissimilar Metal Weld
Incremental Core Damage Probability Deficit
Power change
Operability Assessment
LR-N23-0055, Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days3 August 2023Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days
IR 05000354/20230023 August 2023Integrated Inspection Report 05000354/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200048/2023001Shutdown Margin
Packing leak
Temporary Modification
Functionality Assessment
FLEX
Significance Determination Process
Operability Determination
COVID-19
Fire Protection Program
LR-N23-0054, In-Service Inspection Activities26 July 2023In-Service Inspection Activities
LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 202310 July 2023Emergency Plan Document Revisions Implemented June 28, 2023Deep Dose Equivalent
Power change
LR-N23-0005, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies23 June 2023License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test FrequenciesHot Short
Safe Shutdown
Boric Acid
High winds
Weld Overlay
Internal Flooding
Probabilistic Risk Assessment
Coatings
Emergency Lighting
Incorporated by reference
FLEX
Aging Management
Test box
Thermoset
Local Leak Rate Testing
Foreign Material Exclusion
Large early release frequency
Moisture barrier
License Renewal
Fuel cladding
Power Uprate
ML23139A1475 June 2023Relief Request Associated with Fourth Interval In-service Inspection Limited Examinations of Weld CoverageNondestructive Examination
VT-2
Incorporated by reference
Pressure Boundary Leakage
Through-Wall Leak
Dissimilar Metal Weld
ML23096A1849 May 2023Issuance of Amendment No. 328 Revise and Relocate Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits ReportShutdown Margin
High Radiation Area
Offsite Dose Calculation Manual
Anticipated operational occurrence
Hydrostatic
Pressure and Temperature Limits Report
Surveillance Frequency Control Program
Process Control Program
Pressure Boundary Leakage
IR 05000272/20230013 May 2023Integrated Inspection Report 05000272/2023001 and 05000311/2023001Safe Shutdown
Boric Acid
Enforcement Discretion
Temporary Modification
Functionality Assessment
Condition Adverse to Quality
Aging Management
Significance Determination Process
Design basis earthquake
Operability Determination
License Renewal
Fire Protection Program
Downpower
ML23081A4662 May 2023Issuance of Amendment Nos. 346 and 327 Revise Technical Specifications to Extend Allowable Outage Time for Inoperable Emergency Diesel GeneratorSafe Shutdown
Probabilistic Risk Assessment
FLEX
Battery sizing
Maintenance Rule Program
Offsite Circuit
Fire Protection Program
IR 05000272/20233011 May 2023Initial Operator Licensing Examination Report 05000272/2023301 and 05000311/2023301
LR-N23-0034, 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station27 April 20232022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating StationOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Annual Radiological Effluent Release Report
Tritium
LR-N23-0035, 2022 Annual Radioactive Effluent Release Report (ARERR)27 April 20232022 Annual Radioactive Effluent Release Report (ARERR)Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Annual Radiological Effluent Release Report
LR-N23-0033, Core Operating Limits Report Cycle 2726 April 2023Core Operating Limits Report Cycle 27
LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location21 April 2023License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower LocationOffsite Dose Calculation Manual
ML23089A09417 April 2023NRC to PSEG Hope Creek, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek
ML23087A14917 April 2023NRC to PSEG Salem, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek
ML23103A32313 April 2023Submittal of Updated Final Safety Analysis Report, Rev. 26, Summary of Revised Regulatory Commitments for Hope Creek, Summary of Changes to PSEG Nuclear LLC, Quality Assurance Topical Report, NO-AA-10, Rev. 89Safe Shutdown
Non-Destructive Examination
Commercial Grade Dedication
Aging Management
Surveillance Frequency Control Program
Open Phase Condition
Open Phase Initiative
ML23095A36812 April 2023and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Threshold Determination for Proposed Transfer of Land Ownership
LR-N23-0006, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations24 March 2023Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage InstallationsDecommissioning Funding Plan
Authorized possession limits
ML23086A09124 March 2023NMFS to NRC, Transmittal of Biological Opinion for Continued Operations of Salem and Hope Creek Nuclear Generating Stations
RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations23 March 2023Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage InstallationsDecommissioning Funding Plan
Authorized possession limits
LR-N23-0019, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums21 March 2023and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums
ML23044A10513 March 2023Issuance of Amendment Nos. 345 and 326 Relocate Technical Specifications Requirements for Reactor Head Vents to Technical Requirements ManualSafe Shutdown
Probabilistic Risk Assessment
Fire Protection Program
ML23037A9719 March 2023and Salem Nuclear, Unit Nos. 1 and 2 Issuance of Amendment Nos. 233, 344, and 325 Relocate Technical Specification Staff Qualification Requirements to the PSEG Quality Assurance Topical ReportFire Protection Program
IR 05000272/20230117 March 2023Comprehensive Engineering Team Inspection Report 05000272/2023011 and 05000311/2023011Aging Management
IR 05000272/20220061 March 2023Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2022006 and 05000311/2022006)Fitness for Duty
Commercial Grade Dedication
Cyber Security
Exemption Request
COVID-19
LR-N23-0016, and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments28 February 2023and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and ExperimentsTemporary Modification
LR-N23-0012, Annual Property Insurance Status Report24 February 2023Annual Property Insurance Status Report
LR-N23-0014, Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.71723 February 2023Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.717Fitness for Duty
ML23034A1539 February 2023Operator Licensing Examination Approval
ML23019A3482 February 2023Issuance of Relief Request No. SC-I5R-221 for the Alternative Repair for Service Water System PipingCoatings
Nondestructive Examination
VT-2
Through-Wall Leakage
LR-N23-0003, Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-2111 February 2023Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-211Nondestructive Examination
VT-2
Incorporated by reference
Aging Management