Issue date | Title | Topic | |
---|---|---|---|
IR 05000272/2023004 | 5 February 2024 | Integrated Inspection Report 05000272/2023004 and 05000311/2023004 | |
ML24009A102 | 26 January 2024 | Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) | |
IR 05000272/2023401 | 22 January 2024 | Material Control and Accounting Program Inspection Report 05000272/2023401 and 05000311/2023401 | |
ML24004A154 | 8 January 2024 | Notification of Conduct of a Fire Protection Team Inspection | |
LR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days | 7 December 2023 | Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days | |
ML23270C007 | 29 November 2023 | Notice of Proposed Amendment to Decommissioning Trust Agreement | |
LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion | 29 November 2023 | Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion | Loop seal |
ML23324A307 | 17 November 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | Time of Discovery Contraband Exemption Request |
IR 05000272/2023003 | 13 November 2023 | Integrated Inspection Report 05000272/2023003 and 05000311/2023003 | Boric Acid Temporary Modification Functionality Assessment Significance Determination Process Operability Determination Maintenance Rule Program Biofouling Through Wall Leak Fire Protection Program Operability Assessment |
LR-N23-0072, Core Operating Limits Report Cycle 30 | 1 November 2023 | Core Operating Limits Report Cycle 30 | |
IR 05000272/2023010 | 12 October 2023 | Biennial Problem Identification and Resolution Inspection Report O5000272/2023010 and 05000311/2023010 | Safe Shutdown Cyber Security Significance Determination Process Fire Protection Program |
IR 05000272/2023402 | 12 October 2023 | and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) | Affidavit |
LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement | 8 September 2023 | and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement | |
ML23249A261 | 6 September 2023 | License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary | Deep Dose Equivalent |
IR 05000272/2023005 | 31 August 2023 | Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) | Fitness for Duty Cyber Security |
ML23233A076 | 21 August 2023 | Requalification Program Inspection | |
ML23192A821 | 14 August 2023 | and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location | Fire Protection Program |
IR 05000272/2023002 | 9 August 2023 | Integrated Inspection Report 05000272/2023002 and 05000311/2023002 | Safe Shutdown Boric Acid High Radiation Area Fire Barrier Internal Flooding Fire impairment Nondestructive Examination Temporary Modification Functionality Assessment Locked High Radiation Area Significance Determination Process Operability Determination COVID-19 Fire Protection Program Fire Watch Dissimilar Metal Weld Incremental Core Damage Probability Deficit Power change Operability Assessment |
LR-N23-0055, Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days | 3 August 2023 | Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days | |
IR 05000354/2023002 | 3 August 2023 | Integrated Inspection Report 05000354/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200048/2023001 | Shutdown Margin Packing leak Temporary Modification Functionality Assessment FLEX Significance Determination Process Operability Determination COVID-19 Fire Protection Program |
LR-N23-0054, In-Service Inspection Activities | 26 July 2023 | In-Service Inspection Activities | |
LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 2023 | 10 July 2023 | Emergency Plan Document Revisions Implemented June 28, 2023 | Deep Dose Equivalent Power change |
LR-N23-0005, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies | 23 June 2023 | License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies | Hot Short Safe Shutdown Boric Acid High winds Weld Overlay Internal Flooding Probabilistic Risk Assessment Coatings Emergency Lighting Incorporated by reference FLEX Aging Management Test box Thermoset Local Leak Rate Testing Foreign Material Exclusion Large early release frequency Moisture barrier License Renewal Fuel cladding Power Uprate |
ML23139A147 | 5 June 2023 | Relief Request Associated with Fourth Interval In-service Inspection Limited Examinations of Weld Coverage | Nondestructive Examination VT-2 Incorporated by reference Pressure Boundary Leakage Through-Wall Leak Dissimilar Metal Weld |
ML23096A184 | 9 May 2023 | Issuance of Amendment No. 328 Revise and Relocate Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report | Shutdown Margin High Radiation Area Offsite Dose Calculation Manual Anticipated operational occurrence Hydrostatic Pressure and Temperature Limits Report Surveillance Frequency Control Program Process Control Program Pressure Boundary Leakage |
IR 05000272/2023001 | 3 May 2023 | Integrated Inspection Report 05000272/2023001 and 05000311/2023001 | Safe Shutdown Boric Acid Enforcement Discretion Temporary Modification Functionality Assessment Condition Adverse to Quality Aging Management Significance Determination Process Design basis earthquake Operability Determination License Renewal Fire Protection Program Downpower |
ML23081A466 | 2 May 2023 | Issuance of Amendment Nos. 346 and 327 Revise Technical Specifications to Extend Allowable Outage Time for Inoperable Emergency Diesel Generator | Safe Shutdown Probabilistic Risk Assessment FLEX Battery sizing Maintenance Rule Program Offsite Circuit Fire Protection Program |
IR 05000272/2023301 | 1 May 2023 | Initial Operator Licensing Examination Report 05000272/2023301 and 05000311/2023301 | |
LR-N23-0034, 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station | 27 April 2023 | 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Annual Radiological Effluent Release Report Tritium |
LR-N23-0035, 2022 Annual Radioactive Effluent Release Report (ARERR) | 27 April 2023 | 2022 Annual Radioactive Effluent Release Report (ARERR) | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report |
LR-N23-0033, Core Operating Limits Report Cycle 27 | 26 April 2023 | Core Operating Limits Report Cycle 27 | |
LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location | 21 April 2023 | License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location | Offsite Dose Calculation Manual |
ML23089A094 | 17 April 2023 | NRC to PSEG Hope Creek, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek | |
ML23087A149 | 17 April 2023 | NRC to PSEG Salem, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek | |
ML23103A323 | 13 April 2023 | Submittal of Updated Final Safety Analysis Report, Rev. 26, Summary of Revised Regulatory Commitments for Hope Creek, Summary of Changes to PSEG Nuclear LLC, Quality Assurance Topical Report, NO-AA-10, Rev. 89 | Safe Shutdown Non-Destructive Examination Commercial Grade Dedication Aging Management Surveillance Frequency Control Program Open Phase Condition Open Phase Initiative |
ML23095A368 | 12 April 2023 | and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Threshold Determination for Proposed Transfer of Land Ownership | |
LR-N23-0006, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations | 24 March 2023 | Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations | Decommissioning Funding Plan Authorized possession limits |
ML23086A091 | 24 March 2023 | NMFS to NRC, Transmittal of Biological Opinion for Continued Operations of Salem and Hope Creek Nuclear Generating Stations | |
RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations | 23 March 2023 | Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations | Decommissioning Funding Plan Authorized possession limits |
LR-N23-0019, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums | 21 March 2023 | and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums | |
ML23044A105 | 13 March 2023 | Issuance of Amendment Nos. 345 and 326 Relocate Technical Specifications Requirements for Reactor Head Vents to Technical Requirements Manual | Safe Shutdown Probabilistic Risk Assessment Fire Protection Program |
ML23037A971 | 9 March 2023 | and Salem Nuclear, Unit Nos. 1 and 2 Issuance of Amendment Nos. 233, 344, and 325 Relocate Technical Specification Staff Qualification Requirements to the PSEG Quality Assurance Topical Report | Fire Protection Program |
IR 05000272/2023011 | 7 March 2023 | Comprehensive Engineering Team Inspection Report 05000272/2023011 and 05000311/2023011 | Aging Management |
IR 05000272/2022006 | 1 March 2023 | Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2022006 and 05000311/2022006) | Fitness for Duty Commercial Grade Dedication Cyber Security Exemption Request COVID-19 |
LR-N23-0016, and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments | 28 February 2023 | and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments | Temporary Modification |
LR-N23-0012, Annual Property Insurance Status Report | 24 February 2023 | Annual Property Insurance Status Report | |
LR-N23-0014, Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.717 | 23 February 2023 | Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.717 | Fitness for Duty |
ML23034A153 | 9 February 2023 | Operator Licensing Examination Approval | |
ML23019A348 | 2 February 2023 | Issuance of Relief Request No. SC-I5R-221 for the Alternative Repair for Service Water System Piping | Coatings Nondestructive Examination VT-2 Through-Wall Leakage |