Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000254/2023004 | 5 February 2024 | Integrated Inspection Report 05000254/2023004 and 05000265/2023004 | |
ML24004A005 | 17 January 2024 | Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0042 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) | |
RS-24-001, Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval | 3 January 2024 | Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval | VT-2 |
IR 05000254/2023403 | 22 December 2023 | Public- Quad Cities Nuclear Power Station Security Baseline Inspection Report 05000254/2023403 and 05000265/2023403 | Affidavit |
IR 05000254/2023010 | 20 December 2023 | Comprehensive Engineering Team Inspection Report 05000254/2023010 and 05000265/2023010 | Safe Shutdown Reactor Vessel Water Level Stroke time FLEX Significance Determination Process Operability Determination Battery sizing Power-Operated Valves Fuel cladding Very Low Safety Significance Issue Resolution Weak link Power Uprate |
ML23349A162 | 17 December 2023 | Issuance of Amendment Nos. 298 and 294 Increase Completion Time in Technical Specification 3.8.1.B.4 (Emergency Circumstances) | Safe Shutdown Probabilistic Risk Assessment Cyber Security Arc flash Surveillance Frequency Control Program Safeguards Contingency Plan Recently irradiated fuel Offsite Circuit |
RS-23-128, Response to Request for Additional Information for the Emergency License Amendment Request Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days | 15 December 2023 | Response to Request for Additional Information for the Emergency License Amendment Request Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days | High winds Mission time Tornado Missile B.5.b Surveillance Frequency Control Program Recently irradiated fuel Offsite Circuit |
ML23305A140 | 13 December 2023 | Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 | Hydrostatic Cyber Security Surveillance Frequency Control Program Safeguards Contingency Plan |
RS-23-123, Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days | 13 December 2023 | Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days | Safe Shutdown Arc flash FLEX Missed surveillance Surveillance Frequency Control Program Offsite Circuit |
ML23339A176 | 5 December 2023 | Notification of NRC Baseline Inspection and Request for Information (05000265/2024001) | Non-Destructive Examination Aging Management Foreign Material Exclusion Scaffolding |
ML23319A334 | 20 November 2023 | Regulatory Audit in Support of License Amendment Requests to Adopt TSTF 505, Revision 2 and 10 CFR 50.69 | Tornado Missile Internal Flooding Probabilistic Risk Assessment Qualified Offsite Circuit FLEX Open Phase Condition Offsite Circuit |
RS-23-104, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | 17 November 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | Time of Discovery Fitness for Duty Contraband Condition Adverse to Quality Safeguards Contingency Plan Preemption Authority Exemption Request |
ML23317A119 | 10 November 2023 | Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums | Affidavit |
IR 05000254/2023003 | 9 November 2023 | Integrated Inspection Report 05000254/2023003 and 05000265/2023003 | Safe Shutdown Enforcement Discretion Probabilistic Risk Assessment Functionality Assessment Condition Adverse to Quality FLEX Significance Determination Process Large early release frequency Operability Determination Maintenance Rule Program Fire Protection Program |
RS-23-113, Submittal of Updated Final Safety Analysis Report (Ufsar), Revision 17 and Fire Protection Report (Fpr), Revision 26 | 20 October 2023 | Submittal of Updated Final Safety Analysis Report (Ufsar), Revision 17 and Fire Protection Report (Fpr), Revision 26 | Safe Shutdown Aging Management License Renewal |
RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans | 12 October 2023 | Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans | |
ML23206A038 | 21 September 2023 | Proposed Alternative to the Requirements of the ASME Code | Non-Destructive Examination Nondestructive Examination Incorporated by reference |
IR 05000254/2023011 | 20 September 2023 | Safety-Conscious Work Environment Issue of Concern Team Inspection Report 05000254/2023011 and 05000265/2023011 | |
RS-23-089, Sixth Ten-Year Interval Inservice Testing Program | 5 September 2023 | Sixth Ten-Year Interval Inservice Testing Program | Safe Shutdown Packing leak High Radiation Area Stroke time Squib Incorporated by reference Locked High Radiation Area Missed surveillance Surveillance Frequency Control Program Scram Discharge Volume Cold shutdown justification Power-Operated Valves Power Operated Valves Grace period |
RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs | 30 August 2023 | Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs | Shutdown Margin Surveillance Frequency Control Program |
RS-23-086, Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval | 28 August 2023 | Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval | |
SVP-23-038, Owner'S Activity Report Submittal Fifth 10-Year Interval 2023 Refueling Outage Activities | 14 August 2023 | Owner'S Activity Report Submittal Fifth 10-Year Interval 2023 Refueling Outage Activities | |
IR 05000254/2023002 | 8 August 2023 | Integrated Inspection Report 05000254/2023002 and 05000265/2023002 | Shutdown Margin High Radiation Area Probabilistic Risk Assessment Nondestructive Examination Temporary Modification Functionality Assessment FLEX Significance Determination Process Operability Determination Liquid penetrant Fire Protection Program |
ML23178A074 | 7 August 2023 | Issuance of Amendment Nos. 296 and 292 Adoption of TSTF-416 Low Pressure Coolant Injection (LPCI) Valve Alignment Verification Note Location | Water Inventory Control Cyber Security Surveillance Frequency Control Program Safeguards Contingency Plan |
ML23216A036 | 7 August 2023 | Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFI | Job Performance Measure |
ML23216A056 | 4 August 2023 | Information Meeting (Open House) with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Quad Cities Nuclear Power Station, Units 1 and 2 | Open House |
SVP-23-031, Regulatory Commitment Change Summary Report | 14 July 2023 | Regulatory Commitment Change Summary Report | |
ML23181A106 | 30 June 2023 | Postponement- Information Meeting (Open House) with a Question-And-Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Quad Cities Nuclear Power Station | Open House |
ML23178A242 | 28 June 2023 | Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III | |
ML23179A193 | 28 June 2023 | 07122023 Letter-Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Quad Cities Nuclear Plant for Performance for 2022 Calendar Year | Open House |
IR 05000254/2023401 | 26 June 2023 | Cyber Security Inspection Report 05000254/2023401 and 05000265/2023401 | Cyber Security Affidavit |
IR 05000265/2023040 | 22 June 2023 | Reissue Quad Cities Nuclear Power Station 95001 Supplemental Inspection Supplemental Report 05000265/2023040 and Follow Up Assessment Letter | Condition Adverse to Quality |
RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations | 16 June 2023 | Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations | |
ML23167B172 | 16 June 2023 | 95001 Supplemental Inspection Report 05000265/2023040 and Follow-Up Assessment Letter | Condition Adverse to Quality |
RS-23-060, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors | 8 June 2023 | Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors | Safe Shutdown High winds Ultimate heat sink Mission time Tornado Missile Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Zebra Mussel FLEX Fukushima Dai-Ichi Large early release frequency Earthquake Turbine Missile Biofouling |
RS-23-059, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | 8 June 2023 | License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | Safe Shutdown High winds Shutdown Margin Reactor Vessel Water Level High Radiation Area Ultimate heat sink Mission time Anticipated operational occurrence Tornado Missile Water Inventory Control Safe Shutdown Earthquake Internal Flooding Hydrostatic Probabilistic Risk Assessment Operating Basis Earthquake Zebra Mussel FLEX B.5.b Fukushima Dai-Ichi Surveillance Frequency Control Program Scram Discharge Volume Feedwater Controller Failure Large early release frequency Tornado Missile Risk Evaluator Earthquake Turbine Missile Biofouling Offsite Circuit Failure to Scram |
ML23144A363 | 26 May 2023 | Information Meeting (Open House) with a Question and Answer Session to Discuss NRC 2022 End-of-Cycle Plant Performance Assessment of Quad Cities Nuclear Power Station, Units 1 and 2 | Open House |
RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling | 25 May 2023 | Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling | Hydrostatic Surveillance Frequency Control Program |
ML23033A404 | 15 May 2023 | Exemption from the Requirements of 10 CFR Part 2, Section 2.109(B) Related to Submission of Subsequent License Renewal Application Letter | |
IR 05000254/2023402 | 15 May 2023 | Security Baseline and ISFSI Inspection Reports 05000254/2023402, 05000265/2023402, 07200053/2023401 | Fitness for Duty |
ML23132A202 | 12 May 2023 | Annual Radiological Environmental Operating Report | Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Annual Radiological Effluent Release Report |
ML23125A061 | 8 May 2023 | Proposed Alternative to the Requirements of the ASME Code | |
IR 05000254/2023001 | 8 May 2023 | Integrated Report 05000254/2023001 and 05000265/2023001 | High winds Internal Flooding Enforcement Discretion Functionality Assessment Significance Determination Process Operability Determination Fire Protection Program Power change Downpower |
RS-22-067, 10 CFR 50.46 Annual Report | 4 May 2023 | 10 CFR 50.46 Annual Report | |
ML23118A347 | 1 May 2023 | County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Correction of Amendment No. 193 Adoption of TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration EPID L-2022-LLA-0143 | |
RS-23-068, Response to Request for Additional Information for Quad Cities Relief Request I6R-11, Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell | 28 April 2023 | Response to Request for Additional Information for Quad Cities Relief Request I6R-11, Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell | Nondestructive Examination |
SVP-23-018, Radioactive Effluent Release Report for 2022 | 28 April 2023 | Radioactive Effluent Release Report for 2022 | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program Annual Radiological Effluent Release Report |
ML23114A252 | 28 April 2023 | Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI | Incorporated by reference |
ML23110A062 | 25 April 2023 | Transmittal of Final Quad Cities Nuclear Power Plant, Unit 1 Accident Sequence Precursor Report (Licensee Event Report 254-2022-001) | |
ML23081A038 | 25 April 2023 | County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration | Cyber Security Safeguards Contingency Plan |