Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
IR 05000254/20230045 February 2024Integrated Inspection Report 05000254/2023004 and 05000265/2023004
ML24004A00517 January 2024Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0042 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting))
RS-24-001, Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval3 January 2024Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection IntervalVT-2
IR 05000254/202340322 December 2023Public- Quad Cities Nuclear Power Station Security Baseline Inspection Report 05000254/2023403 and 05000265/2023403Affidavit
IR 05000254/202301020 December 2023Comprehensive Engineering Team Inspection Report 05000254/2023010 and 05000265/2023010Safe Shutdown
Reactor Vessel Water Level
Stroke time
FLEX
Significance Determination Process
Operability Determination
Battery sizing
Power-Operated Valves
Fuel cladding
Very Low Safety Significance Issue Resolution
Weak link
Power Uprate
ML23349A16217 December 2023Issuance of Amendment Nos. 298 and 294 Increase Completion Time in Technical Specification 3.8.1.B.4 (Emergency Circumstances)Safe Shutdown
Probabilistic Risk Assessment
Cyber Security
Arc flash
Surveillance Frequency Control Program
Safeguards Contingency Plan
Recently irradiated fuel
Offsite Circuit
RS-23-128, Response to Request for Additional Information for the Emergency License Amendment Request Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days15 December 2023Response to Request for Additional Information for the Emergency License Amendment Request Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 DaysHigh winds
Mission time
Tornado Missile
B.5.b
Surveillance Frequency Control Program
Recently irradiated fuel
Offsite Circuit
ML23305A14013 December 2023Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580Hydrostatic
Cyber Security
Surveillance Frequency Control Program
Safeguards Contingency Plan
RS-23-123, Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days13 December 2023Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 DaysSafe Shutdown
Arc flash
FLEX
Missed surveillance
Surveillance Frequency Control Program
Offsite Circuit
ML23339A1765 December 2023Notification of NRC Baseline Inspection and Request for Information (05000265/2024001)Non-Destructive Examination
Aging Management
Foreign Material Exclusion
Scaffolding
ML23319A33420 November 2023Regulatory Audit in Support of License Amendment Requests to Adopt TSTF 505, Revision 2 and 10 CFR 50.69Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
Qualified Offsite Circuit
FLEX
Open Phase Condition
Offsite Circuit
RS-23-104, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation17 November 2023Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications ImplementationTime of Discovery
Fitness for Duty
Contraband
Condition Adverse to Quality
Safeguards Contingency Plan
Preemption Authority
Exemption Request
ML23317A11910 November 2023Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred PremiumsAffidavit
IR 05000254/20230039 November 2023Integrated Inspection Report 05000254/2023003 and 05000265/2023003Safe Shutdown
Enforcement Discretion
Probabilistic Risk Assessment
Functionality Assessment
Condition Adverse to Quality
FLEX
Significance Determination Process
Large early release frequency
Operability Determination
Maintenance Rule Program
Fire Protection Program
RS-23-113, Submittal of Updated Final Safety Analysis Report (Ufsar), Revision 17 and Fire Protection Report (Fpr), Revision 2620 October 2023Submittal of Updated Final Safety Analysis Report (Ufsar), Revision 17 and Fire Protection Report (Fpr), Revision 26Safe Shutdown
Aging Management
License Renewal
RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans12 October 2023Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans
ML23206A03821 September 2023Proposed Alternative to the Requirements of the ASME CodeNon-Destructive Examination
Nondestructive Examination
Incorporated by reference
IR 05000254/202301120 September 2023Safety-Conscious Work Environment Issue of Concern Team Inspection Report 05000254/2023011 and 05000265/2023011
RS-23-089, Sixth Ten-Year Interval Inservice Testing Program5 September 2023Sixth Ten-Year Interval Inservice Testing ProgramSafe Shutdown
Packing leak
High Radiation Area
Stroke time
Squib
Incorporated by reference
Locked High Radiation Area
Missed surveillance
Surveillance Frequency Control Program
Scram Discharge Volume
Cold shutdown justification
Power-Operated Valves
Power Operated Valves
Grace period
RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs30 August 2023Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRsShutdown Margin
Surveillance Frequency Control Program
RS-23-086, Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval28 August 2023Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval
SVP-23-038, Owner'S Activity Report Submittal Fifth 10-Year Interval 2023 Refueling Outage Activities14 August 2023Owner'S Activity Report Submittal Fifth 10-Year Interval 2023 Refueling Outage Activities
IR 05000254/20230028 August 2023Integrated Inspection Report 05000254/2023002 and 05000265/2023002Shutdown Margin
High Radiation Area
Probabilistic Risk Assessment
Nondestructive Examination
Temporary Modification
Functionality Assessment
FLEX
Significance Determination Process
Operability Determination
Liquid penetrant
Fire Protection Program
ML23178A0747 August 2023Issuance of Amendment Nos. 296 and 292 Adoption of TSTF-416 Low Pressure Coolant Injection (LPCI) Valve Alignment Verification Note LocationWater Inventory Control
Cyber Security
Surveillance Frequency Control Program
Safeguards Contingency Plan
ML23216A0367 August 2023Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFIJob Performance Measure
ML23216A0564 August 2023Information Meeting (Open House) with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Quad Cities Nuclear Power Station, Units 1 and 2Open House
SVP-23-031, Regulatory Commitment Change Summary Report14 July 2023Regulatory Commitment Change Summary Report
ML23181A10630 June 2023Postponement- Information Meeting (Open House) with a Question-And-Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Quad Cities Nuclear Power StationOpen House
ML23178A24228 June 2023Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III
ML23179A19328 June 202307122023 Letter-Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Quad Cities Nuclear Plant for Performance for 2022 Calendar YearOpen House
IR 05000254/202340126 June 2023Cyber Security Inspection Report 05000254/2023401 and 05000265/2023401Cyber Security
Affidavit
IR 05000265/202304022 June 2023Reissue Quad Cities Nuclear Power Station 95001 Supplemental Inspection Supplemental Report 05000265/2023040 and Follow Up Assessment LetterCondition Adverse to Quality
RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations16 June 2023Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations
ML23167B17216 June 202395001 Supplemental Inspection Report 05000265/2023040 and Follow-Up Assessment LetterCondition Adverse to Quality
RS-23-060, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors8 June 2023Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power ReactorsSafe Shutdown
High winds
Ultimate heat sink
Mission time
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Zebra Mussel
FLEX
Fukushima Dai-Ichi
Large early release frequency
Earthquake
Turbine Missile
Biofouling
RS-23-059, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b8 June 2023License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4bSafe Shutdown
High winds
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Mission time
Anticipated operational occurrence
Tornado Missile
Water Inventory Control
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Operating Basis Earthquake
Zebra Mussel
FLEX
B.5.b
Fukushima Dai-Ichi
Surveillance Frequency Control Program
Scram Discharge Volume
Feedwater Controller Failure
Large early release frequency
Tornado Missile Risk Evaluator
Earthquake
Turbine Missile
Biofouling
Offsite Circuit
Failure to Scram
ML23144A36326 May 2023Information Meeting (Open House) with a Question and Answer Session to Discuss NRC 2022 End-of-Cycle Plant Performance Assessment of Quad Cities Nuclear Power Station, Units 1 and 2Open House
RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling25 May 2023Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown CoolingHydrostatic
Surveillance Frequency Control Program
ML23033A40415 May 2023Exemption from the Requirements of 10 CFR Part 2, Section 2.109(B) Related to Submission of Subsequent License Renewal Application Letter
IR 05000254/202340215 May 2023Security Baseline and ISFSI Inspection Reports 05000254/2023402, 05000265/2023402, 07200053/2023401Fitness for Duty
ML23132A20212 May 2023Annual Radiological Environmental Operating ReportAnnual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Annual Radiological Effluent Release Report
ML23125A0618 May 2023Proposed Alternative to the Requirements of the ASME Code
IR 05000254/20230018 May 2023Integrated Report 05000254/2023001 and 05000265/2023001High winds
Internal Flooding
Enforcement Discretion
Functionality Assessment
Significance Determination Process
Operability Determination
Fire Protection Program
Power change
Downpower
RS-22-067, 10 CFR 50.46 Annual Report4 May 202310 CFR 50.46 Annual Report
ML23118A3471 May 2023County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Correction of Amendment No. 193 Adoption of TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration EPID L-2022-LLA-0143
RS-23-068, Response to Request for Additional Information for Quad Cities Relief Request I6R-11, Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell28 April 2023Response to Request for Additional Information for Quad Cities Relief Request I6R-11, Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and ShellNondestructive Examination
SVP-23-018, Radioactive Effluent Release Report for 202228 April 2023Radioactive Effluent Release Report for 2022Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Process Control Program
Annual Radiological Effluent Release Report
ML23114A25228 April 2023Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XIIncorporated by reference
ML23110A06225 April 2023Transmittal of Final Quad Cities Nuclear Power Plant, Unit 1 Accident Sequence Precursor Report (Licensee Event Report 254-2022-001)
ML23081A03825 April 2023County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the PenetrationCyber Security
Safeguards Contingency Plan