Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML24036A2655 February 2024Notice of Inspection and Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000266/2024010 and 05000301/2024010
IR 05000266/20230041 February 2024Integrated Inspection Report 05000266/2023004 and 05000301/2023004
ML24030A03530 January 2024Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection
L-2024-001, Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements26 January 2024Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements
L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)25 January 2024Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)
ML24005A32424 January 2024Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0040 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting))
ML23352A27523 January 2024Issuance of Amendment Nos. 274 and 276 Regarding Revision to Technical Specification 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program
L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update15 December 2023Quality Assurance Topical Report (FPL-1) Revision 30 UpdateFitness for Duty
Shutdown Margin
Offsite Dose Calculation Manual
Commercial Grade Dedication
Post Accident Monitoring
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Temporary Modification
Cyber Security
Condition Adverse to Quality
Aging Management
Process Control Program
Operability Determination
Safeguards Contingency Plan
License Renewal
Maintenance Rule Program
Fire Protection Program
Grace period
Power Uprate
L-2023-174, Subsequent License Renewal Application - Third Annual Update13 December 2023Subsequent License Renewal Application - Third Annual UpdateBoric Acid
Fire Barrier
Coatings
Aging Management
License Renewal
Subsequent License Renewal
L-2023-176, Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule29 November 2023Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final RuleTime of Discovery
Contraband
Exemption Request
L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-065428 November 2023Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654,Health Physics Network
High Radiation Area
Offsite Dose Calculation Manual
Met Tower
Incorporated by reference
FLEX
Severe Accident Management Guideline
Earthquake
Deep Dose Equivalent
Minimum staff
Fire Protection Program
Grace period
Overexposure
L-2023-159, Part 3 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks and Security Event Notifications Final Rule16 November 2023Part 3 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks and Security Event Notifications Final RuleExemption Request
IR 05000266/202340214 November 2023Security Baseline Inspection Report 05000266/2023402 and 05000301/2023402
ML23279A0679 November 2023Issuance of Relief Request I6 RR 02 - Examination of the Unit 2 Steam Generator Feedwater Nozzle Extension to Nozzle Weld Sixth 10 Year Inservice Inspection Program IntervalVT-2
IR 05000266/202300316 October 2023Integrated Inspection Report 05000266/2023003 and 05000301/2023003Functionality Assessment
FLEX
Operability Determination
Fire Protection Program
ML23346A1326 October 2023Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently PublishedPandemic
COVID-19
Siren
L-2023-128, License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program19 September 2023License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance ProgramIncorporated by reference
ML23243A9106 September 2023Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water ReactorsExemption Request
IR 05000266/202350129 August 2023Emergency Preparedness Biennial Exercise Inspection Report 05000266/2023501 and 05000301/2023501Siren
ML23208A22628 August 2023Exemption from the Requirements of 10 CFR 50,46, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors (EPID L-2022-LLE-0026) - Letter
ML23208A09528 August 2023Issuance of Amendment Nos. 273 and 275 Regarding Revising Licensing Basis to Address Generic Safety Issue-191 and Respond to Generic Letter 2004-02 Using a Risk Informed ApproachBoric Acid
High winds
Mission time
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Coatings
Temporary Modification
Finite Element Analysis
FLEX
Large early release frequency
Exemption Request
Earthquake
Maintenance Rule Program
Turbine Missile
Fuel cladding
IR 05000266/202300524 August 2023Updated Inspection Plan for Point Beach Nuclear Plant (Report 05000266/2023005 and 05000301/2023005)
ML23160A06421 August 2023Issuance of Amendment Nos. 272 and 274 Regarding Revision to Use Beacon Power Distribution Monitoring SystemShutdown Margin
Probabilistic Risk Assessment
Surveillance Frequency Control Program
Fuel cladding
L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update17 August 2023Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update
ML23221A0529 August 2023Confirmation of Initial License Examination, March 2024
L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 27 August 2023and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2Health Physics Network
Cyber Security
FLEX
B.5.b
Severe Accident Management Guideline
Minimum staff
Siren
ML23201A0873 August 2023Audit Plan in Support of Review of License AmendmentFLEX
L-2023-089, Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections24 July 2023Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections
IR 05000266/202300218 July 2023Integrated Inspection Report 05000266/2023002 and 05000301/2023002Boric Acid
Internal Flooding
Past operability
Functionality Assessment
Operability Determination
License Renewal
Maintenance Rule Program
Fire Protection Program
IR 05000266/202340113 July 2023Public-Point Beach Nuclear Plant-Security Baseline Inspection Report 05000266/2023401; 05000301/2023401; Independent Spent Fuel Storage Security Inspection Report 07200005/2023401Affidavit
L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)29 June 2023Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)
ML23178A24228 June 2023Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III
L-2023-088, 10 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval27 June 202310 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval
ML23171B10621 June 2023Info Meeting with a Question and Answer Session to Discuss NRC 2022 EOC Plant Performance Assessment of Ptbh, Units 1 and 2
ML23163A24213 June 2023Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000266/2023004Boric Acid
Non-Destructive Examination
Aging Management
Foreign Material Exclusion
Scaffolding
L-2023-075, Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-029 June 2023Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-02Boric Acid
Non-Destructive Examination
Weld Overlay
Probabilistic Risk Assessment
Coatings
Functionality Assessment
Condition Adverse to Quality
Aging Management
Exemption Request
Liquid penetrant
Pressure Boundary Leakage
Through Wall Leak
Through-Wall Leakage
Fire Protection Program
Dissimilar Metal Weld
DM weld
Grace period
L-2023-073, Subsequent License Renewal Application, Second Annual Update Request for Additional Information Set 1 Response1 June 2023Subsequent License Renewal Application, Second Annual Update Request for Additional Information Set 1 ResponseAging Management
ML23103A1331 June 2023Issuance of Amendment Nos. 271 and 273 Regarding Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4bSafe Shutdown
High winds
High Radiation Area
Hydrostatic
Probabilistic Risk Assessment
FLEX
Fukushima Dai-Ichi
Surveillance Frequency Control Program
Large early release frequency
Flooding Focused Evaluation
Maintenance Rule Program
Fuel cladding
Offsite Circuit
L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal22 May 2023NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual SubmittalFitness for Duty
Shutdown Margin
Offsite Dose Calculation Manual
Commercial Grade Dedication
Post Accident Monitoring
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Temporary Modification
Cyber Security
Condition Adverse to Quality
Aging Management
Process Control Program
Operability Determination
Safeguards Contingency Plan
License Renewal
Maintenance Rule Program
Fire Protection Program
Grace period
Power Uprate
ML23118A1764 May 2023Audit Summary for License Amendment Request Regarding Risk-Informed Approach for Closure of Generic Safety Issue 191Coatings
Exemption Request
IR 05000266/20230011 May 2023Integrated Inspection Report 05000266/2023001 and 05000301/2023001Boric Acid
Internal Flooding
Nondestructive Examination
Temporary Modification
Nuclear Accident Reporting System
Functionality Assessment
FLEX
Significance Determination Process
Foreign Material Exclusion
Operability Determination
Liquid penetrant
Fire Protection Program
Power change
Operability Assessment
ML23114A12225 April 2023Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection
L-2023-058, 2022 Annual Monitoring Report10 April 20232022 Annual Monitoring ReportBoric Acid
Grab sample
Offsite Dose Calculation Manual
Hydrostatic
Met Tower
Process Control Program
Chernobyl
L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update28 March 2023Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance UpdateDecommissioning Funding Plan
Authorized possession limits
L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications27 March 2023and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or ApplicationsFuel cladding