Issue date | Title | Topic | |
---|---|---|---|
L-24-002, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G | 2 February 2024 | Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G | |
ML23342A118 | 9 January 2024 | Independent Spent Fuel Storage Installation Security Inspection Plan | |
L-23-019, Proof of Financial Protection 10 CFR 140.15 | 18 December 2023 | Proof of Financial Protection 10 CFR 140.15 | |
ML23334A182 | 30 November 2023 | Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary November 2021 Through October 2023 | Safe Shutdown High winds High Radiation Area Ultimate heat sink Grab sample Offsite Dose Calculation Manual Fire Barrier Tornado Missile Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Emergency Lighting Locked High Radiation Area Tornado-Generated Missile Aging Management Abnormal operational transient Design basis earthquake Annual Radiological Environmental Operating Report License Renewal Earthquake Control of Heavy Loads Accidental discharge Fire Protection Program Fire Watch Scaffolding |
L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point | 13 November 2023 | Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point | |
ML23306A099 | 2 November 2023 | and Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) | |
L-23-011, 10 CFR 72.48 Biennial Change Summary Report | 27 October 2023 | 10 CFR 72.48 Biennial Change Summary Report | |
IR 05000293/2023401 | 31 August 2023 | NRC Inspection Report No. 05000293/2023401 & 2023001 (Cover Letter Only) | Affidavit |
IR 05000293/2023002 | 4 August 2023 | NRC Inspection Report No. 05000293/2023002 | Grab sample Offsite Dose Calculation Manual |
L-23-008, Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI) | 23 May 2023 | Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI) | |
ML23136A779 | 15 May 2023 | Annual Radiological Environmental Operating Report, January 1 Through December 31, 2022 | Non-Destructive Examination Grab sample Offsite Dose Calculation Manual Met Tower Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report Chernobyl Fuel cladding Grace period |
ML23135A215 | 15 May 2023 | Annual Radioactive Effluent Release Report, January 1 Through December 31, 2022 | Grab sample Offsite Dose Calculation Manual Met Tower Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report |
L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 2022 | 24 April 2023 | HDI Annual Occupational Radiation Exposure Data Reports - 2022 | |
L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations | 31 March 2023 | Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations | Decommissioning Funding Plan |
ML23088A038 | 29 March 2023 | Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance | |
ML23069A278 | 13 March 2023 | Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1 Subsequent License Renewal Application | |
ML22361A102 | 24 February 2023 | Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities | |
IR 05000293/2022004 | 15 February 2023 | NRC Inspection Report No. 05000293/2022004 | High Radiation Area Coatings Fire Protection Program |
ML22356A071 | 31 January 2023 | Issuance of Exemption for Pilgrim Nuclear Power Station ISFSI Regarding Annual Radioactive Effluent Release Report - Cover Letter | Annual Radioactive Effluent Release Report Exemption Request |
ML22347A278 | 21 December 2022 | Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 | |
L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 | 14 December 2022 | Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 | |
L-22-041, Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension | 9 December 2022 | Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Exemption Request |
IR 05000293/2022003 | 18 November 2022 | NRC Inspection Report No. 05000293/2022003 | High Radiation Area Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Chernobyl |
L-22-036, Decommissioning Trust Fund Agreement | 8 November 2022 | Decommissioning Trust Fund Agreement | |
ML22276A176 | 24 October 2022 | Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages | |
ML22266A192 | 23 September 2022 | and Pilgrim Nuclear Power Station - Request to Withdraw Prior Submissions from NRC Consideration | |
ML22272A035 | 22 September 2022 | S. Lynch-Benttinen Letter Regarding U.S. Citizen Intent to Sue U.S. Fish and Wildlife and NOAA Fisheries Representing the Endangered Species (Na Right Whale) Which Will Be Adversely Affected by Holtec International Potential Actions | |
ML22269A420 | 22 September 2022 | Citizen Lawsuit | |
ML22241A112 | 29 August 2022 | Request for Exemption from 10 CFR 72.212(a)(2), (b)(2), (b)(3), (b)(4), (B)(5)(i), (b)(11), and 72.214 for Pilgrim ISFSI Annual Radioactive Effluent Release Report | Annual Radioactive Effluent Release Report Exemption Request |
IR 05000293/2022002 | 12 August 2022 | NRC Inspection Report No. 05000293/2022002 | Fire Barrier Fire Protection Program |
ML22215A177 | 3 August 2022 | Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages | |
ML22206A151 | 1 August 2022 | NRC Office of Investigations Case Nos. 1-2022-002 & 1-2022-006 | |
ML22221A259 | 1 August 2022 | LTR-22-0217-1-NMSS - Town of Duxbury Letter Opposing the Irradiated Water Release from Pilgrim (Docket No. 05000293) | |
ML22193A166 | 28 July 2022 | LTR-22-0154-1 - Heather Govern, VP, Clean Air and Water Program, Et Al., Letter Regarding Radioactive Wastewater Disposal from the Pilgrim Nuclear Power Station (Docket No. 05000293) | License Renewal Exemption Request |
ML22175A173 | 28 July 2022 | LTR-22-0153-1 - Response Letter to D. Turco, Cape Downwinders, from A. Roberts, NRC, Regarding Holtec-Pilgrim Plans to Dump One Million Gallons of Radioactive Waste Into Cape Cod Bay | License Renewal Exemption Request |
ML22154A488 | 1 June 2022 | Letter from Conservation Law Foundation Regarding Irradiated Water Release from Pilgrim | Pandemic COVID-19 |
ML22154A162 | 26 May 2022 | Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim | |
ML22136A260 | 16 May 2022 | Submittal of Annual Radiological Environmental Operating Report for January 1 Through December 31, 2021 | Annual Radiological Environmental Operating Report |
ML22136A257 | 16 May 2022 | Submittal of Annual Radioactive Effluent Release Report for January 1 Through December 31, 2021 | Annual Radioactive Effluent Release Report |
ML22102A093 | 12 May 2022 | LTR-22-0067 Response to Matthew P. Levesque, President, Barnstable Town Council Regarding Irradiated Water Release from Pilgrim | Annual Radiological Environmental Operating Report |
IR 05000293/2022001 | 11 May 2022 | NRC Inspection Report No. 05000293/2022001 | High Radiation Area Locked High Radiation Area |
ML22104A054 | 30 April 2022 | LTR-22-0093 Response to Sheila Lynch-Benttinen, Regarding Irradiated Water Release from Pilgrim | |
L-22-026, Occupational Radiation Exposure Data Report - 2021 | 29 April 2022 | Occupational Radiation Exposure Data Report - 2021 | |
ML22152A259 | 25 April 2022 | Zaccagnini Letter Dated 04/25/22 | |
ML22152A264 | 19 April 2022 | Flynn Letter Dated 04/19/22 | |
ML22091A106 | 1 April 2022 | Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) | |
L-22-022, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec. | 25 March 2022 | and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec. | Decommissioning Funding Plan |
ML22130A676 | 14 March 2022 | Decola Ltr Dtd 03/14/22 Re Potential Discharge of Radioactive Water from Pilgrim Nuclear Power Station | License Renewal |
ML22041B076 | 7 March 2022 | 03-07-22 - Letter to the Honorable William R. Keating, Responds to Letter Regarding Proposed Release of Irradiated Water at Pilgrim Nuclear Power Station Into Cape Cod Bay | Annual Radiological Environmental Operating Report Environmental Justice |
ML22054A296 | 23 February 2022 | Annual ISFSI Radioactive Effluent Release Report for 2021 | Annual Radioactive Effluent Release Report |