Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
IR 05000440/202300430 January 2024Integrated Inspection Report 05000440/2023004
L-23-207, License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs24 January 2024License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs
L-24-017, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative24 January 202430-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative
IR 05000440/202340210 January 2024Cyber Security Inspection Report 05000440/2023402Cyber Security
Affidavit
ML24003A8033 January 2024Notification of NRC Fire Protection Team Inspection Request for InformationSafe Shutdown
Fire Barrier
Probabilistic Risk Assessment
Fire impairment
Job Performance Measure
Fire Protection Program
ML23321A04720 December 2023Letter to Rod L. Penfield - Perry Nuclear Power Plant, Unit 1 - License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal ApplicationHigh winds
Internal Flooding
Probabilistic Risk Assessment
FLEX
Tornado-Generated Missile
Fukushima Dai-Ichi
Annual Radioactive Effluent Release Report
Large early release frequency
License Renewal
Subsequent License Renewal
Turbine Missile
Environmental Justice
L-23-171, CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency8 December 2023CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test FrequencyScaffolding
L-23-244, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation6 December 2023Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications ImplementationTime of Discovery
Fitness for Duty
Contraband
Condition Adverse to Quality
Safeguards Contingency Plan
Preemption Authority
Exemption Request
IR 05000440/202301128 November 2023Biennial Problem Identification and Resolution Inspection Report 05000440/2023011Cyber Security
Maintenance Rule Program
Unidentified leakage
Unidentified leak
IR 05000440/202340327 November 2023Security Baseline Inspection Report 05000440/2023403
ML23292A29717 November 2023Table of Contents LAR (L-2023-LLA-0111)
L-23-238, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 2010 November 2023Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 20
L-23-052, Submittal of the Updated Safety Analysis Report, Revision 2327 October 2023Submittal of the Updated Safety Analysis Report, Revision 23
ML23292A24819 October 2023Fws to NRC, Federal Agency Coordination Under ESA Section 7 for Perry Nuclear Plant, Unit 1, License Renewal, and Concurrence with Not Likely to Adversely Affect Determination for Northern Long-eared BatLicense Renewal
ML23292A24719 October 2023Fws to NRC, Perry Nuclear Plant, Unit 1, License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be AffectedLicense Renewal
IR 05000440/202300311 October 2023Integrated Inspection Report 05000440/2023003Enforcement Discretion
Functionality Assessment
Significance Determination Process
Operability Determination
Annual Radiological Effluent Release Report
Severe Accident Management Guideline
Fuel cladding
Fire Protection Program
Siren
ML23249A1033 October 2023Letter to Rod L. Penfield, Site Vice President-Perry Nuclear Power Plant, Unit 1-Notice of Intent to Conduct Scoping Process and Prepare an Environmental Impact StatementLicense Renewal
ML23237B42228 September 2023Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments
ML23269A12427 September 2023Request for Withholding Information from Public Disclosure
ML23261B01925 September 2023Aging Management Audit Plan Regarding the License Renewal Application ReviewAging Management
License Renewal
ML23261C36425 September 2023License Renewal Application Online Reference PortalLicense Renewal
ML23256A35922 September 2023Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing Regarding the Energy Harbor Nuclear Corp. Application for License RenewalLicense Renewal
L-23-206, Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD12 September 2023Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MDHigh winds
Grab sample
Grace period
L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments12 September 2023Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments
L-23-172, Quality Assurance Program Manual31 August 2023Quality Assurance Program ManualOffsite Dose Calculation Manual
Nondestructive Examination
Temporary Modification
Condition Adverse to Quality
Aging Management
Process Control Program
License Renewal
Pandemic
Grace period
IR 05000440/202340128 August 2023Public - Perry Nuclear Power Plant Security Baseline Inspection Report 05000440/2023401Affidavit
ML23129A17225 August 2023Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1
IR 05000440/202300524 August 2023Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2023005)License Renewal
ML23172A28523 August 2023Safety Evaluation Irradiated Fuel Management Plan and Preliminary Decommissioning Cost Estimate
ML23227A22015 August 2023Information Request to Support Upcoming Problem Identification and Resolution Inspection at Perry Nuclear Power PlantTemporary Modification
Aging Management
Operability Determination
Maintenance Rule Program
L-23-001, License Amendment Request to Remove the Table of Contents from the Technical Specifications7 August 2023License Amendment Request to Remove the Table of Contents from the Technical SpecificationsShutdown Margin
High Radiation Area
Water Inventory Control
Post Accident Monitoring
Hydrostatic
Scram Discharge Volume
L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments7 August 2023Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License AmendmentsCyber Security
Safeguards Contingency Plan
Fire Protection Program
IR 05000440/20230022 August 2023Integrated Inspection Report 05000440/2023002Unanalyzed Condition
Time of Discovery
Packing leak
Offsite Dose Calculation Manual
Enforcement Discretion
Probabilistic Risk Assessment
Temporary Modification
Functionality Assessment
Significance Determination Process
Operability Determination
L-23-174, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative19 July 202330-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative
ML23198A28417 July 2023Information Request for the Cyber-Security Baseline Inspection, Notification to Perform InspectionProbabilistic Risk Assessment
Cyber Security
L-23-146, License Renewal Application for the Perry Nuclear Power Plant3 July 2023License Renewal Application for the Perry Nuclear Power Plant
IR 05000440/202301029 June 2023Comprehensive Engineering Team Inspection Report 05000440/2023010Safe Shutdown
Unanalyzed Condition
Time of Discovery
Mission time
Past operability
Zebra Mussel
FLEX
Significance Determination Process
Operability Determination
Time Critical Operator Action
License Renewal
Power Uprate
ML23178A24228 June 2023Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III
L-23-051, Plan, Nineteenth Inservice Inspection Summary Report22 June 2023Plan, Nineteenth Inservice Inspection Summary Report
L-23-050, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models22 June 20232022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models
L-22-249, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener5 June 2023License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel GenerSurveillance Frequency Control Program
Offsite Circuit
ML23144A35625 May 2023Information Meeting with a Question and Answer Session to Discuss NRC 2022 End of Cycle Plant Performance Assessment of Perry Nuclear Power Plant, Unit 1
L-23-134, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations23 May 2023Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations
L-23-065, Annual Financial Report22 May 2023Annual Financial Report
ML23124A17417 May 2023Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1
ML23129A01116 May 2023Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter)
IR 05000440/20230014 May 2023Integrated Inspection Report (05000440/2023001)High winds
High Radiation Area
Stroke time
Past operability
Enforcement Discretion
Probabilistic Risk Assessment
Nondestructive Examination
Temporary Modification
Functionality Assessment
FLEX
Significance Determination Process
Scram Discharge Volume
Operability Determination
Offsite Circuit
Fire Protection Program
Power change
L-23-121, Annual Radiological Effluent Release Report26 April 2023Annual Radiological Effluent Release ReportOffsite Dose Calculation Manual
Hydrostatic
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Annual Radiological Effluent Release Report
Fuel cladding
L-23-122, Annual Radiological Environmental Operating Report26 April 2023Annual Radiological Environmental Operating ReportOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Grace period