 Issue dateTitleTopic
IR 05000354/20230041 February 2024Integrated Inspection Report 05000354/2023004Shutdown Margin
High Radiation Area
Internal Flooding
Enforcement Discretion
Operating Basis Earthquake
Functionality Assessment
Locked High Radiation Area
Missed surveillance
Significance Determination Process
Operability Determination
Fire Protection Program
ML24030A8751 February 2024Operator Licensing Examination Approval
ML24009A10226 January 2024Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting))
IR 05000354/202340122 January 2024Material Control and Accounting Program Inspection Report 05000354/2023401
ML23341A13716 January 2024Issuance of Amendment No. 235 Revise Trip and Standby Auto-Start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning
ML23335A11215 December 2023Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers
ML23307A15315 December 2023NRC Investigation Report No. 1-2023-001Significance Determination Process
Inattentive
ML23270C00729 November 2023Notice of Proposed Amendment to Decommissioning Trust Agreement
ML23324A30717 November 2023Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications ImplementationTime of Discovery
Contraband
Exemption Request
IR 05000354/20230037 November 2023Integrated Inspection Report 05000354/2023003Enforcement Discretion
Probabilistic Risk Assessment
Temporary Modification
Functionality Assessment
Condition Adverse to Quality
Significance Determination Process
Scram Discharge Volume
Operability Determination
Fire Protection Program
Downpower
IR 05000272/202340212 October 2023and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only)Affidavit
LR-N23-0065, Submittal of 2023 Annual 10 CFR 50.46 Report2 October 2023Submittal of 2023 Annual 10 CFR 50.46 Report
LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement8 September 2023and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement
ML23249A2616 September 2023License Amendment Request to Modify the Salem and Hope Creek Exclusion Area BoundaryDeep Dose Equivalent
IR 05000354/202300531 August 2023Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2023005)Fitness for Duty
Cyber Security
License Renewal
ML23192A82114 August 2023and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower LocationFire Protection Program
IR 05000354/20230023 August 2023Integrated Inspection Report 05000354/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200048/2023001Shutdown Margin
Packing leak
Temporary Modification
Functionality Assessment
FLEX
Significance Determination Process
Operability Determination
COVID-19
Fire Protection Program
IR 05000354/20230103 August 2023Biennial Problem Identification and Resolution Inspection Report 05000354/2023010Safe Shutdown
Safe Shutdown Earthquake
Functionality Assessment
Operability Determination
LR-N23-0052, Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers Per Technical Specification 4.6.2.131 July 2023Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers Per Technical Specification 4.6.2.1
LR-N23-0042, Spent Fuel Cask Registration12 July 2023Spent Fuel Cask Registration
LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 202310 July 2023Emergency Plan Document Revisions Implemented June 28, 2023Deep Dose Equivalent
Power change
IR 05000354/20230111 May 2023Commercial Grade Dedication Report 05000354/2023011Commercial Grade Dedication
ML23121A1411 May 2023Senior Reactor and Reactor Operator Initial License Examinations
LR-N23-0034, 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station27 April 20232022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating StationOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Annual Radiological Effluent Release Report
Tritium
LR-N23-0035, 2022 Annual Radioactive Effluent Release Report (ARERR)27 April 20232022 Annual Radioactive Effluent Release Report (ARERR)Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Annual Radiological Effluent Release Report
IR 05000354/202300126 April 2023Integrated Inspection Report 05000354/2023001Safe Shutdown Earthquake
Enforcement Discretion
Probabilistic Risk Assessment
Functionality Assessment
Condition Adverse to Quality
Significance Determination Process
Scram Discharge Volume
Operability Determination
Fire Protection Program
Power change
Downpower
LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location21 April 2023License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower LocationOffsite Dose Calculation Manual
LR-N23-0009, License Amendment Request (LAR) to Revise the Hope Creek Trip and Standby Auto-start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning (HVAC) Trains18 April 2023License Amendment Request (LAR) to Revise the Hope Creek Trip and Standby Auto-start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning (HVAC) TrainsUltimate heat sink
Anticipated operational occurrence
GOTHIC
ML23087A14917 April 2023NRC to PSEG Salem, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek
ML23089A09417 April 2023NRC to PSEG Hope Creek, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek
ML23103A32313 April 2023Submittal of Updated Final Safety Analysis Report, Rev. 26, Summary of Revised Regulatory Commitments for Hope Creek, Summary of Changes to PSEG Nuclear LLC, Quality Assurance Topical Report, NO-AA-10, Rev. 89Safe Shutdown
Non-Destructive Examination
Commercial Grade Dedication
Aging Management
Surveillance Frequency Control Program
Open Phase Condition
Open Phase Initiative
ML23095A36812 April 2023and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Threshold Determination for Proposed Transfer of Land Ownership
LR-N23-0024, Submittal of Hope Creek Generating Station Technical Specification Bases Changes29 March 2023Submittal of Hope Creek Generating Station Technical Specification Bases ChangesSafe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
High Radiation Area
Fire Barrier
Anticipated operational occurrence
Tornado Missile
Water Inventory Control
Internal Flooding
Hydrostatic
Missed surveillance
Abnormal operational transient
Surveillance Frequency Control Program
Scram Discharge Volume
Feedwater Controller Failure
Excess Flow Check Valve
Fast acting solenoid valve
Spiral reload
Overtravel
Control of Heavy Loads
Power Operated Valves
Turbine Missile
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
Scaffolding
Power change
Unidentified leakage
Failure to Scram
LR-N23-0006, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations24 March 2023Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage InstallationsDecommissioning Funding Plan
Authorized possession limits
ML23086A09124 March 2023NMFS to NRC, Transmittal of Biological Opinion for Continued Operations of Salem and Hope Creek Nuclear Generating Stations
LR-N23-0019, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums21 March 2023and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums
ML23037A9719 March 2023and Salem Nuclear, Unit Nos. 1 and 2 Issuance of Amendment Nos. 233, 344, and 325 Relocate Technical Specification Staff Qualification Requirements to the PSEG Quality Assurance Topical ReportFire Protection Program
IR 05000354/20220061 March 2023Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2022006)Fitness for Duty
Commercial Grade Dedication
Cyber Security
License Renewal
Exemption Request
COVID-19
LR-N23-0016, and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments28 February 2023and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and ExperimentsTemporary Modification
LR-N23-0018, Technical Specification 6.9.1.5.b - 2022 Annual Report of SRV Challenges27 February 2023Technical Specification 6.9.1.5.b - 2022 Annual Report of SRV Challenges
LR-N23-0012, Annual Property Insurance Status Report24 February 2023Annual Property Insurance Status Report
LR-N23-0014, Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.71723 February 2023Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.717Fitness for Duty
IR 05000354/202200424 January 2023Integrated Inspection Report 05000354/2022004High Radiation Area
Nondestructive Examination
Temporary Modification
Functionality Assessment
Locked High Radiation Area
FLEX
Operability Determination
Fire Protection Program
LR-N23-0011, In-Service Inspection Activities - 90 Day Report: Twenty-Fourth Refueling Outage19 January 2023In-Service Inspection Activities - 90 Day Report: Twenty-Fourth Refueling Outage
LR-N22-0096, and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination5 January 2023and Salem Generating Station, Units 1 and 2 - Request for Threshold DeterminationOffsite Dose Calculation Manual
LR-N22-0094, Emergency Plan Document Revisions Implemented November 21, 202214 December 2022Emergency Plan Document Revisions Implemented November 21, 2022Fire Watch
LR-N22-0091, Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments2 December 2022Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments
ML22335A0411 December 2022Notification of Commercial Grade Dedication Inspection (05000354/2023011) and Request for InformationCommercial Grade Dedication
IR 05000354/20220033 November 2022Integrated Inspection Report 05000354/2022003Internal Flooding
Temporary Modification
Functionality Assessment
Scram Discharge Volume
Operability Determination
Fire Protection Program
Downpower
Coast down