Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000400/2023004 | 30 January 2024 | Integrated Inspection Report 05000400/2023004 | |
ML23317A346 | 14 November 2023 | Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 | Fire Protection Program |
IR 05000400/2023003 | 9 November 2023 | Integrated Inspection Report 05000400/2023003 | Enforcement Discretion Probabilistic Risk Assessment Met Tower Functionality Assessment FLEX Significance Determination Process Operability Determination Fire Protection Program |
ML23346A132 | 6 October 2023 | Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published | Pandemic COVID-19 Siren |
ML23234A170 | 3 October 2023 | Issuance of Amendment No. 199 Regarding Administrative Changes to the Renewed Facility Operating License and Technical Specifications | Incorporated by reference |
ML23256A088 | 25 September 2023 | Issuance of Alternative to Steam Generator Welds | Hydrostatic Probabilistic Risk Assessment Incorporated by reference Finite Element Analysis |
ML23195A078 | 29 August 2023 | Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Pressure Boundary Leakage Fire Protection Program Unidentified leakage |
IR 05000400/2023005 | 23 August 2023 | Updated Inspection Plan for Shearon Harris Nuclear Power Plant, Unit 1 (Report 05000400/2023005) | Cyber Security |
ML23234A254 | 22 August 2023 | RQ Inspection Notification Letter | |
IR 05000400/2023402 | 26 July 2023 | Security Baseline Inspection Report 05000400/2023402 | |
IR 05000400/2023002 | 24 July 2023 | Integrated Inspection Report 05000400/2023002 | High winds High Radiation Area Temporary Modification Functionality Assessment Locked High Radiation Area Operability Determination Fire Protection Program |
IR 05000400/2023440 | 17 July 2023 | Special Inspection Report 05000400/2023440 and Preliminary Greater than Green Finding and Apparent Violation Cover Letter | Significance Determination Process Affidavit |
IR 05000400/2024301 | 15 May 2023 | Notification of Licensed Operator Initial Examination 05000400/2024301 | |
IR 05000400/2023001 | 10 May 2023 | Integrated Inspection Report 05000400 2023001 | Internal Flooding Enforcement Discretion Temporary Modification Functionality Assessment FLEX Significance Determination Process Operability Determination Fuel cladding Fire Protection Program Power change |
IR 05000400/2023404 | 4 May 2023 | Cyber Security Inspection Report 05000400/2023404 | Cyber Security Affidavit |
ML23118A076 | 1 May 2023 | Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI | Incorporated by reference |
ML23118A139 | 28 April 2023 | Submittal of Updated Final Safety Analysis Report (Amendment 65), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Fire Barrier Anticipated operational occurrence Tornado Missile Internal Flooding Hydrostatic Past operability Fire impairment Nondestructive Examination Incorporated by reference Aging Management Missed surveillance Surveillance Frequency Control Program Operability Determination License Renewal Turbine Missile Fuel cladding Pressure Boundary Leakage Offsite Circuit Power change Unidentified leakage |
IR 05000400/2023403 | 5 April 2023 | Security Baseline Inspection Report 05000400/2023403 | |
IR 05000400/2023010 | 15 March 2023 | Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000400/2023010 | Hot Short Ultimate heat sink Aging Management Time Critical Operator Action Battery sizing Weak link |
ML22332A493 | 10 March 2023 | William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility | Health Physics Network High winds Minimum staff |
IR 05000400/2022006 | 1 March 2023 | Annual Assessment Letter for Shearon Harris Nuclear Power Plant - NRC Inspection Report 05000400/2022006 | Commercial Grade Dedication Cyber Security Exemption Request Coronavirus |
ML23033A527 | 8 February 2023 | Correction of Typographical Errors Incurred During Issuance of License Amendment No. 196 | Surveillance Frequency Control Program |
IR 05000400/2022004 | 7 February 2023 | Integrated Inspection Report 05000400/2022004 | Boric Acid High Radiation Area Internal Flooding Enforcement Discretion Nondestructive Examination Functionality Assessment Locked High Radiation Area Aging Management Significance Determination Process Operability Determination License Renewal Liquid penetrant Fire Protection Program |
ML23020A125 | 23 January 2023 | Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000400/2023403) | |
ML22096A003 | 18 November 2022 | McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations | Aging Management |
ML22256A253 | 14 November 2022 | Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 | Ultimate heat sink Water Inventory Control Surveillance Frequency Control Program Recently irradiated fuel Fire Protection Program |
IR 05000400/2022003 | 10 November 2022 | Integrated Inspection Report 05000400/2022003 | Hot Short Safe Shutdown Time of Discovery Ultimate heat sink Enforcement Discretion Temporary Modification Functionality Assessment FLEX Significance Determination Process Operability Determination Fire Protection Program |
IR 05000400/2022301 | 2 November 2022 | NRC Operator License Examination Report 05000400/2022301 | |
ML22271A620 | 29 September 2022 | Notification of Shearon Harris Nuclear Power Plant Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000400/2023010 | Commercial Grade Dedication Probabilistic Risk Assessment Functionality Assessment |
ML22258A126 | 14 September 2022 | NRC Operator Licensing Examination Approval 05000400/2022301 | |
ML22242A002 | 12 September 2022 | Issuance of Amendments to Adopt TSTF 569, Revision 2, Revise Response Time Testing Definition | Shutdown Margin Packing leak Anticipated operational occurrence Process Control Program Pressure Boundary Leakage Fire Protection Program |
ML22227A068 | 2 September 2022 | Alternative to Certain Inservice Testing Requirements in the American Society of Mechanical Engineers Code for Operation and Maintenance for Certain Target Rock Solenoid Valves | Stroke time Incorporated by reference |
IR 05000400/2022005 | 24 August 2022 | Updated Inspection Plan for Shearon Harris Nuclear Power Plant (Report 05000400/2022005) | Commercial Grade Dedication Operator Manual Action Cyber Security Open Phase Condition License Renewal Exemption Request COVID-19 |
IR 05000400/2022403 | 23 August 2022 | Security Baseline Inspection Report 05000400/2022403 | Contraband Enforcement Discretion |
ML22126A008 | 9 August 2022 | Issuance of Amendment No. 194 Revise Technical Specifications Related to Reactor Protection System Instrumentation P7 | Anticipated operational occurrence |
IR 05000400/2022002 | 5 August 2022 | Integrated Inspection Report 05000400/2022002 | Safe Shutdown Mission time Enforcement Discretion Probabilistic Risk Assessment Temporary Modification Functionality Assessment Significance Determination Process Operability Determination Maintenance Rule Program Through-Wall Leakage Continuous fire watch Fire Protection Program Fire Watch |
ML22161B033 | 28 July 2022 | Issuance of Amendment No. 193 Regarding Revision of Surveillance Requirements to Remove Shutdown Limitation | Surveillance Frequency Control Program |
IR 05000400/2022011 | 20 July 2022 | Biennial Problem Identification and Resolution Inspection Report 05000400 2022011 | Boric Acid Aging Management Operability Determination License Renewal Maintenance Rule Program |
IR 05000400/2022402 | 30 June 2022 | Material Control and Accounting Program Inspection Report 05000400/2022402 (OUO Removed) | Affidavit |
IR 05000400/2022010 | 13 June 2022 | Design Basis Assurance Inspection (Programs) Inspection Report 05000400/2022010 | Significance Determination Process Power-Operated Valves Weak link |
ML22138A401 | 26 May 2022 | Project Manager Reassignment | |
ML22101A282 | 6 May 2022 | Regulatory Audit Summary Related to the Review of License Amendment Regarding Revising the Flood Hazard Protection Scheme | |
IR 05000400/2022001 | 4 May 2022 | Integrated Inspection Report 05000400/2022001 | Commercial Grade Dedication Internal Flooding Functionality Assessment Aging Management Operability Determination Maintenance Rule Program Fire Protection Program Power change Downpower |
IR 05000400/2022401 | 24 March 2022 | Security Baseline Inspection Report 05000400/2022401 | Affidavit |
ML22020A007 | 10 March 2022 | Issuance of Amendment No. 192 Regarding Removal of Extraneous Content and Requirements from the Renewed Facility Operating License and Technical Specifications | Non-Destructive Examination Anticipated operational occurrence Surveillance Frequency Control Program |
ML22010A281 | 4 March 2022 | Issuance of Amendments to Adopt TSTF-577, Rev. 1 Revised Frequencies for Steam Generator Tube Inspections (EPID L-2021-LLA-0161 | Shutdown Margin Nondestructive Examination |
IR 05000400/2021006 | 2 March 2022 | Annual Assessment Letter for Shearon Harris Nuclear Power Plant (Report No. 05000400/2021006) | Cyber Security License Renewal Exemption Request Power-Operated Valves COVID-19 |
ML21351A472 | 10 February 2022 | Issuance of Amendment No. 190 Regarding Revision to Containment Spray Nozzle Test Frequency | Boric Acid Surveillance Frequency Control Program Foreign Material Exclusion |
IR 05000400/2021004 | 4 February 2022 | Integrated Inspection Report 05000400/2021004 | Shutdown Margin Internal Flooding Squib Functionality Assessment Job Performance Measure Operability Determination Severe Accident Management Guideline Maintenance Rule Program Fire Protection Program |
ML22034A535 | 2 February 2022 | Notification of Licensed Operator Initial Examination 05000400/2022301 |