Issue date | Title | Topic | |
---|---|---|---|
IR 05000458/2023040 | 18 January 2024 | 95001 Supplemental Inspection Supplemental Report 05000458/2023040 and Follow-Up Assessment Letter | |
ML24012A196 | 12 January 2024 | Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and | |
RBG-48271, Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk | 12 January 2024 | Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk | |
ML24011A174 | 11 January 2024 | Security Baseline Inspection Report (Cover Letter) | Affidavit |
ML23349A167 | 21 December 2023 | Request for Withholding Information from Public Disclosure | Affidavit |
ML23348A357 | 14 December 2023 | Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting | Surveillance Frequency Control Program Affidavit |
ML23340A159 | 13 December 2023 | Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment | |
ML23352A029 | 13 December 2023 | Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection | |
IR 05000458/2023010 | 12 December 2023 | Biennial Problem Identification and Resolution Inspection Report 05000458/2023010 | Boric Acid Past operability Condition Adverse to Quality Significance Determination Process Operability Determination Through-Wall Leak Through Wall Leak |
RBG-48267, Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 | 7 December 2023 | Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 | Ultimate heat sink |
ML23333A136 | 29 November 2023 | Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | |
ML23325A143 | 21 November 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | |
ML23310A032 | 13 November 2023 | Integrated Inspection Report 05000458/2023003 | Time of Discovery Reactor Vessel Water Level Ultimate heat sink Mission time Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Temporary Modification Functionality Assessment Incorporated by reference Significance Determination Process Process Control Program Operability Determination Time Critical Operator Action Maintenance Rule Program Fire Protection Program Substantial potential for an overexposure Downpower Overexposure |
IR 05000458/2023003 | 13 November 2023 | Integrated Inspection Report 05000458/2023003 | Time of Discovery Reactor Vessel Water Level Ultimate heat sink Mission time Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Temporary Modification Functionality Assessment Incorporated by reference Condition Adverse to Quality Significance Determination Process Process Control Program Operability Determination Time Critical Operator Action Maintenance Rule Program Fire Protection Program Substantial potential for an overexposure Downpower Overexposure |
ML23311A208 | 9 November 2023 | Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV | |
ML23311A432 | 9 November 2023 | Notification of NRC Supplemental Inspection (95001) and Request for Information | |
RBG-48264, Core Operating Limits Report (COLR) - Cycle 23, Revision 1 | 6 November 2023 | Core Operating Limits Report (COLR) - Cycle 23, Revision 1 | |
RBG-48260, Notification of Readiness for Supplemental Inspection | 12 October 2023 | Notification of Readiness for Supplemental Inspection | |
ML23278A240 | 6 October 2023 | Regulatory Audit Plan in Support of License Amendment Requests to Revise TSs to Adopt Risk-Informed Completion Times and Implement the Provisions of 10 CFR 50.69 | Internal Flooding Probabilistic Risk Assessment FLEX |
RBG-48258, Notification of Readiness for Supplemental Inspection | 5 October 2023 | Notification of Readiness for Supplemental Inspection | |
RBG-48259, Revision to Reply to Notice of Violation; EA-23-055 | 3 October 2023 | Revision to Reply to Notice of Violation; EA-23-055 | |
ML23270B993 | 29 September 2023 | Request to Update ASME Boiler & Pressure Vessel Code Relief Request SE with NRC-Approved Revision of Bwrip Guidelines (GG-ISI-020 & RBS-ISI-019) (EPID L-2022-LLR-0090) - Non-Proprietary | |
ML23269A124 | 27 September 2023 | Request for Withholding Information from Public Disclosure | |
IR 05000458/2023401 | 26 September 2023 | Cyber Security Inspection Report 05000458/2023401 | Cyber Security Affidavit |
IR 05000458/2023001 | 21 September 2023 | NRC Inspection Report 05000458/2023001, Disputed Non-Cited Violation Rescinded | |
IR 05000458/2023403 | 21 September 2023 | NRC Security Inspection Report 05000458/2023403 (Cover Letter) | Affidavit |
RBG-48254, Report of Changes and Errors to 10CFR50.46 | 21 September 2023 | Report of Changes and Errors to 10CFR50.46 | |
RBG-48249, Reply to a Notice of Violation, EA-23-071 | 14 September 2023 | Reply to a Notice of Violation, EA-23-071 | |
RBG-48253, Submittal of Owner'S Activity Report Form for Cycle 22 | 12 September 2023 | Submittal of Owner'S Activity Report Form for Cycle 22 | |
IR 05000458/2023012 | 1 September 2023 | Comprehensive Engineering Team Inspection Report 05000458/2023012 | |
IR 05000458/2023005 | 21 August 2023 | Updated Inspection Plan for River Bend Station (Report 05000458/2023005) - Mid Cycle Letter | Fitness for Duty Commercial Grade Dedication Cyber Security License Renewal |
RBG-48247, Reply to Notice of Violation; EA-23-055 | 21 August 2023 | Reply to Notice of Violation; EA-23-055 | Temporary Modification |
IR 05000458/2023092 | 15 August 2023 | Final Significance Determination of a White Finding, Notice of Violation, and Follow-Up Assessment Letter; NRC Inspection Report 05000458/2023092 | Significance Determination Process Preliminary White Finding |
IR 05000458/2023002 | 9 August 2023 | Integrated Inspection Report 05000458/2023002 | High Radiation Area Ultimate heat sink Enforcement Discretion Functionality Assessment Operability Determination Time Critical Operator Action Fire Protection Program Substantial potential for overexposure Substantial potential for an overexposure Power Uprate Overexposure |
ML23208A211 | 27 July 2023 | Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions | Shutdown Margin Reactor Vessel Water Level Packing leak Water Inventory Control Surveillance Frequency Control Program Pressure Boundary Leakage |
ML23195A069 | 24 July 2023 | 2023 River Bend Station Notification of Biennial Problem Identification and Resolution Inspection and Request for Information | Temporary Modification Operability Determination |
IR 05000458/2023091 | 20 July 2023 | Final Significance Determination of a White Finding, Notice of Violation, and Follow-Up Assessment Letter; NRC Inspection Report 05000458/2023091 | Significance Determination Process Preliminary White Finding |
ML23207A076 | 14 July 2023 | EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 | |
ML23195A022 | 11 July 2023 | 4-2022-012 Letter - OI Closure to Licensee | |
IR 05000458/2023404 | 11 July 2023 | NRC Security Inspection Report 05000458/2023404 (Cover Letter Only) | Affidavit |
IR 05000458/2023090 | 26 June 2023 | NRC Inspection Report 05000458/2023090 and Preliminary White Finding | Mission time Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Temporary Modification FLEX Significance Determination Process Large early release frequency Earthquake Preliminary White Finding |
ML23159A230 | 8 June 2023 | Response to Request for Additional Information Concerning Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) | EVT-1 |
ML23159A005 | 5 June 2023 | 56557-EN 56557 - Paragon - Redlined | |
RBG-48226, Core Operating Limits Report (COLR) - Cycle 23, Revision 0 | 31 May 2023 | Core Operating Limits Report (COLR) - Cycle 23, Revision 0 | |
RBG-48237, Response to NRC Integrated Inspection Report 05000458/2023001 | 25 May 2023 | Response to NRC Integrated Inspection Report 05000458/2023001 | |
ML23130A273 | 10 May 2023 | and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations | |
ML23116A235 | 1 May 2023 | Integrated Inspection Report 05000458/2023001 | Safe Shutdown Fire Barrier Weld Overlay Enforcement Discretion Probabilistic Risk Assessment Nondestructive Examination Temporary Modification Functionality Assessment Significance Determination Process Operability Determination Liquid penetrant Fire Protection Program Power change |
ML23117A217 | 1 May 2023 | Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment | |
RBG-48220, Submittal of 2022 Annual Radioactive Effluent Release Report | 25 April 2023 | Submittal of 2022 Annual Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Tritium |