Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000315/2023004 | 31 January 2024 | Integrated Inspection Report 05000315/2023004 and 05000316/2023004 | |
ML24004A158 | 19 January 2024 | Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0039 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) | |
AEP-NRC-2024-01, Emergency Plan Revision 48 | 8 January 2024 | Emergency Plan Revision 48 | Boric Acid Fitness for Duty Health Physics Network High winds Offsite Dose Calculation Manual FLEX B.5.b Earthquake Minimum staff Fire Protection Program Integrated Public Alert and Warning System Siren |
AEP-NRC-2023-56, Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor | 20 December 2023 | Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor | Post Accident Monitoring |
ML23352A350 | 19 December 2023 | Dc. Cook Nuclear Power Plant, Units 1 Biennial Licensed Operator Requalification Program Inspection and Request for Information | Job Performance Measure |
ML23338A264 | 5 December 2023 | Confirmation of Initial License Examination | |
AEP-NRC-2023-45, Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation | 16 November 2023 | Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation | Time of Discovery Contraband Exemption Request |
IR 05000315/2023404 | 6 November 2023 | Cyber Security Inspection Report 05000315/2023404 and 05000316/2023404 | Cyber Security Affidavit |
ML23310A115 | 6 November 2023 | Notification of the NRC Baseline Inspection and Request for Information, Inspection Report 05000316/2024002 | Boric Acid Non-Destructive Examination Aging Management Foreign Material Exclusion Scaffolding |
IR 05000315/2023403 | 19 September 2023 | Security Baseline Inspection Report 05000315/2023403 and 05000316/2023403 | |
IR 05000315/2023011 | 31 August 2023 | Functional Engineering Inspection - Commercial Grade Dedication Report 05000315/2023011 and 05000316/2023011 | Commercial Grade Dedication Coatings |
ML23242A183 | 30 August 2023 | Notification of NRC Baseline Inspection and Request for Information; Inspection Report05000315/2023004 | Boric Acid Non-Destructive Examination Aging Management Foreign Material Exclusion Scaffolding |
AEP-NRC-2023-40, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes | 29 August 2023 | Annual Report of Loss-of-Coolant Accident Evaluation Model Changes | |
IR 05000315/2023402 | 11 August 2023 | Security Baseline Inspection Report 05000315/2023402 and 05000316/2023402 | Affidavit |
AEP-NRC-2023-34, Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation | 2 August 2023 | Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation | Boric Acid Shutdown Margin Post Accident Monitoring |
IR 05000315/2023002 | 24 July 2023 | Integrated Inspection Report 05000315/2023002 and 05000316/2023002 | Stroke time Internal Flooding Enforcement Discretion Temporary Modification Functionality Assessment FLEX Operability Determination Maintenance Rule Program Fire Protection Program |
ML23178A242 | 28 June 2023 | Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III | |
IR 05000315/2023012 | 22 June 2023 | Biennial Problem Identification and Resolution Inspection Report 05000315/2023012 and 05000316/2023012 | Commercial Grade Dedication Met Tower Condition Adverse to Quality Significance Determination Process Operability Determination |
IR 05000315/2023501 | 21 June 2023 | Emergency Preparedness Biennial Exercise Inspection Report 05000315/2023501 and 05000316/2023501 | Siren |
AEP-NRC-2023-29, Core Operating Limits Report | 19 June 2023 | Core Operating Limits Report | Shutdown Margin |
ML23159A019 | 13 June 2023 | Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant, Units 1 and 2 | |
AEP-NRC-2023-32, Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations | 6 June 2023 | Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations | |
AEP-NRC-2023-33, Renewable Operating Permit | 5 June 2023 | Renewable Operating Permit | Coatings |
AEP-NRC-2023-30, Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump | 1 June 2023 | Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump | |
AEP-NRC-2023-27, Annual Radiological Environmental Operating Report | 15 May 2023 | Annual Radiological Environmental Operating Report | Annual Radiological Environmental Operating Report |
ML23131A328 | 11 May 2023 | D.C. Cook Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000315/2023404 and 05000316/2023404 | Probabilistic Risk Assessment Cyber Security |
IR 05000315/2023001 | 3 May 2023 | Integrated Inspection Report 05000315/2023001 and 05000316/2023001 | High winds Fire Barrier Past operability Enforcement Discretion Temporary Modification Functionality Assessment Significance Determination Process Operability Determination Fire Protection Program Fire Watch Scaffolding Power change |
AEP-NRC-2023-19, Annual Radioactive Effluent Release Report | 30 April 2023 | Annual Radioactive Effluent Release Report | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Annual Radiological Effluent Release Report Downpower |
ML23117A006 | 27 April 2023 | Review of the Spring 2022 Steam Generator Tube Inspections Report | |
ML23114A114 | 25 April 2023 | Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection | |
AEP-NRC-2023-23, Annual Report of Individual Monitoring for 2022 | 24 April 2023 | Annual Report of Individual Monitoring for 2022 | |
AEP-NRC-2023-24, Notification of Ph Non-Compliance for Turbine Room Sump | 12 April 2023 | Notification of Ph Non-Compliance for Turbine Room Sump | Grab sample |
AEP-NRC-2023-20, Annual Report of Property Insurance | 3 April 2023 | Annual Report of Property Insurance | |
AEP-NRC-2023-15, Decommissioning Funding Status Report | 28 March 2023 | Decommissioning Funding Status Report | |
ML23076A021 | 20 March 2023 | Request for Information for NRC Commercial Grade Dedication Inspection; Inspection Report 05000315/2023011; 05000316/2023011 | Commercial Grade Dedication Large early release frequency |
IR 05000315/2023401 | 16 March 2023 | Security Baseline Inspection Report 05000315/2023401 and 05000316/2023401 | Fitness for Duty |
ML23066A188 | 7 March 2023 | Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Donald C. Cook Nuclear Plant | Temporary Modification Aging Management Maintenance Rule Program |
IR 05000315/2022006 | 1 March 2023 | Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2022006 and 05000316/2022006) | Commercial Grade Dedication Exemption Request Coronavirus |
IR 05000315/2022004 | 1 February 2023 | Integrated Inspection Report 05000315/2022004 and 05000316/2022004 and Exercise of Enforcement Discretion | Boric Acid Internal Flooding Enforcement Discretion Nondestructive Examination Temporary Modification Functionality Assessment FLEX Process Control Program Operability Determination Severe Accident Management Guideline Through-Wall Leak Fire Protection Program |
AEP-NRC-2023-11, Form OAR-1, Owner'S Activity Report | 31 January 2023 | Form OAR-1, Owner'S Activity Report | Boric Acid Through Wall Leak |
IR 05000315/2023010 | 31 January 2023 | Phase 4 Post-Approval License Renewal Inspection Report 05000315/2023010 and 05000316/2023010 | Aging Management License Renewal Fire Protection Program |
AEP-NRC-2023-02, Request for Approval of Change Regarding Neutron Flux Instrumentation | 26 January 2023 | Request for Approval of Change Regarding Neutron Flux Instrumentation | Safe Shutdown Boric Acid Shutdown Margin Post Accident Monitoring Time Critical Operator Action |
ML22363A562 | 4 January 2023 | Relief Request ISIR-5-06 Related to ASME Code Case N-729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles | |
AEP-NRC-2022-66, Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring | 15 December 2022 | Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring | Post Accident Monitoring |
AEP-NRC-2022-46, Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in | 12 December 2022 | Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in | Pandemic COVID-19 |
ML22340A139 | 30 November 2022 | Submittal of Revision 31 to Updated Final Safety Analysis Report and 10CFR50.71(e) Updated and Related Site Change Reports | Fire Protection Program |
IR 05000315/2022011 | 4 November 2022 | Design Basis Assurance Inspection (Teams) Inspection Report 05000315/2022011 and 05000316/2022011 | Safe Shutdown Ultimate heat sink Stroke time Incorporated by reference Condition Adverse to Quality FLEX Significance Determination Process Large early release frequency Battery sizing Earthquake Power-Operated Valves Weak link |
IR 05000315/2022003 | 28 October 2022 | Integrated Inspection Report 05000315/2022003 and 05000316/2022003 | Offsite Dose Calculation Manual Internal Flooding Functionality Assessment Significance Determination Process Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Operability Determination Fire Protection Program Scaffolding |
AEP-NRC-2022-58, U1C31 Steam Generator Tube Inspection Report | 24 October 2022 | U1C31 Steam Generator Tube Inspection Report | Nondestructive Examination |
AEP-NRC-2022-61, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-06 | 24 October 2022 | Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-06 | Boric Acid Nondestructive Examination Pressure Boundary Leakage Through Wall Leak Through-Wall Leakage |