Semantic search

Jump to: navigation, search
Search

Edit query Show embed code

The query [[Category:Letter]] [[Site::Arkansas Nuclear]] was answered by the SMWSQLStore3 in 0.3514 seconds.


Results 1 – 50    (Previous 50 | Next 50)   (20 | 50 | 100 | 250 | 500)   (JSON | CSV | RSS | RDF)
 Issue dateTitleTopic
IR 05000313/20190021 August 2019Integrated Inspection Report No. 05000313/2019002 and 05000368/2019002
ML19184A55415 July 2019Request for Relief ANO1-ISI-032 from the ASME Code Section XI Visual Examination Requirements for the Fourth 10-Year Inservice Inspection Interval
IR 05000313/201901326 June 2019Temporary Instruction 2515/194 Report 05000313/2019013 and 05000368/2019013
IR 05000368/201930113 June 2019NRC Examination Report 05000368/2019301
ML19156A40011 June 2019Request for Alternative ANO2-ISI-021 to Permit Continued Application of the 2007 Edition Through the 2008 Addenda of ASME CodeIncorporated by reference
IR 05000313/20190126 June 2019NRC Post Column 4 Inspection Report 05000313/2019012 and 05000368/2019012
ML19098A95522 May 2019Issuance of Amendment No. 264 Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-425, Revision 3Surveillance Frequency Control Program
Cyber Security
Shutdown Margin
Probabilistic Risk Assessment
Internal Flooding
High winds
ML19135A66415 May 2019Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations
ML19127A29915 May 2019Correction to Amendment No. 315 Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-425, Revision 3Surveillance Frequency Control Program
ML14224A3563 May 2019Letter to All Holders of Licenses for Operating Power Reactors - Rescission of Certain Power Reactor Security Orders Applicable to Nuclear Power Plants
IR 05000313/201900130 April 2019NRC Integrated Inspection Report 05000313/2019001 and 05000368/2019001
ML19063B94823 April 2019Issuance of Amendment No. 315 Adoption of Technical Specification Task Force Traveler TSTF-425, Revision 3Surveillance Frequency Control Program
Shutdown Margin
Boric Acid
Probabilistic Risk Assessment
NFPA 805
Internal Flooding
High winds
Hydrostatic
ML19106A26915 April 2019NRC Initial Operator Licensing Examination Approval 05000368/2019301
ML19101A1959 April 2019Units 1 and 2, Annual Occupational Radiation Exposure Report
ML19074A0285 April 2019Review of License Renewal Commitment Submittal Regarding Environmentally-Assisted FatigueAging Management
IR 05000313/20190144 April 2019NRC Confirmatory Order (EA 17 132 and EA 17-153) Follow-Up Inspection Report 05000416/2019012; Arkansas Nuclear One, Units 1 and 2-Nrc Confirmatory Order (EA 17 132 and Ea-17-153) Follow-Up Inspection Report 05000313/2019014
ML19094B0783 April 2019Entergy - Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G
IR 05000313/201901026 March 2019NRC Fire Protection Baseline Inspection Report (NRC Inspection Report 05000313/2019010 and 05000368/2019010)
ML19080A03721 March 2019Notification of Inspection (NRC Inspection Report 05000313/2019003 and Request for Information
IR 05000313/20180064 March 2019Annual Assessment Letter for Arkansas Nuclear One, Units 1 and 2 (Report 05000313/2018006 and 05000368/2018006)Aging Management
NFPA 805
Open Phase Condition
ML19045A67514 February 2019Entergy - 10 CFR 140.15 Proof of Financial Protection
ML19036A9444 February 2019Indemnity Agreements for Arkansas Nuclear One Units 1 and 2, and Grand Gulf Nuclear Station, Unit 1
IR 05000268/201820129 January 2019NRC Inspection Report 05000313/2018201 and 05000268/2018201
ML19025A07823 January 2019Inservice Inspection Summary Report for the Twenty-Sixth Refueling Outage
IR 05000313/201800423 January 2019NRC Integrated Inspection Report 05000313/2018004 and 05000368/2018004
ML18337A24717 January 2019Issuance of Amendment Nos. 263 and 314 Revision to Emergency Action Level SchemeSpent Fuel Pool Instrumentation
Water Inventory Control
Ultimate heat sink
Operating Basis Earthquake
High winds
ML19016A16611 January 2019Entergy - 2019 Nuclear Energy Liability Evidence of Financial Protection
ML19015A0229 January 2019Revision 19 of the ANO Security Plan
ML18346A3147 January 2019Relief Nos. ANO1-ISI-027, -028, -029, -030, and -031 from ASME Code, Section XI, Examination Requirements for Fourth 10-Year Inservice Inspection Interval (EPID L-2018-LLR-0063, -0064, -0065, -0066, -0067)Incorporated by reference
VT-2
ML19002A20421 December 2018to Engine Systems, Inc., Part 21 Report Re Emd Fuel and Soakback Pumps - Potentially Undertorqued Cover Bolts
ML18317A38219 December 2018Issuance of Amendment No. 313, Revise Technical Specification 3.3.3.6, Post-Accident InstrumentationAnnual Radiological Environmental Operating Report
Offsite Dose Calculation Manual
Process Control Program
Post Accident Monitoring
Probabilistic Risk Assessment
Severe Accident Management Guideline
1CAN121804, (ANO-1) - Core Operating Limits Report (COLR) Cycle 28 COLR, Revision 219 December 2018Arkansas Nuclear One, Unit 1 (ANO-1) - Core Operating Limits Report (Colr) Cycle 28 Colr, Revision 2Shutdown Margin
ML18347A44213 December 2018Entergy - 2018 Certification of Foreign Ownership Control or Influence
ML18337A0346 December 2018Entergy Arkansas Nuclear One Reminder - Information on Additional Protocol Forms to Licensees and Manufacturers to Assist in Meeting the International Atomic Energy Agency Treaty Obligations
ML18306A51330 November 2018Issuance of Conforming Amendment Nos. 262, 312 and 215 Transfers of Renewed Facility Operating Licenses
ML18298A01227 November 2018Issuance of Amendment No. 311 Updating the Reactor Coolant System Pressure Temperature LimitsHydrostatic
ML18324A80519 November 2018Notification of an NRC Triennial Fire Protection Baseline Inspection Report 05000313/2019010 and 05000368/2019010) and Request for Information
ML18320A22216 November 2018Supplemental to the Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)Probabilistic Risk Assessment
Internal Flooding
Surveillance Frequency Control Program
IR 05000313/201840316 November 2018NRC Inspection Report 05000313/2018403 and 05000368/2018403
ML18319A34715 November 2018ISFSI, River Bend, Unit 1 & ISFSI, Waterford, Unit 3, & ISFSI, Grand Gulf, & ISFSI, Transfer of Control of License - Order Response
IR 05000313/201800313 November 2018NRC Integrated Inspection Report 05000313/2018003 and 05000368/2018003
ML18327A04113 November 2018Radiological Preparedness Final Report for the Arkansas Nuclear One (Ano), Medical Services and Reception Center Drills Evaluated on September 27, 2018
ML18260A33924 October 2018Issuance of Amendment No. 261 Revision to Technical Specification Bases Related to Emergency Feedwater Turbine-Driven Pump Steam Supply ValvesStroke time
ML18295A38222 October 2018NRC Design Bases Assurance Inspection (Teams) Inspection Report (05000313/20180011 and 05000368/20180011)
ML18297A0575 October 2018After Action Report/Improvement Plan for the Arkansas Nuclear One Exercise by FEMA Region 6 for Exercise Conducted on July 7, 2018
ML18262A0974 October 2018Acknowledgement of License Renewal Regulatory Commitment Changes
IR 05000313/201800531 August 2018Updated Inspection Plan for Arkansas Nuclear One (Report 05000313/2018005 and 05000368/2018005)Cyber Security
NFPA 805
Open Phase Condition
ML18240A13228 August 2018Letter from the Secretary to the Petitioners Regarding Director'S Decision DD-18-03
NRC-2017-0188, Letter from the Secretary to the Petitioners Regarding Director'S Decision DD-18-0328 August 2018Letter from the Secretary to the Petitioners Regarding Director'S Decision DD-18-03
ML18241A08827 August 2018Inservice Testing Plan for the Fifth 10-Year IntervalCold shutdown justification
Incorporated by reference
Stroke time
NFPA 805
Boric Acid
B.5.b
FLEX
Ultimate heat sink