ML23326A039 | 24 January 2024 | Issuance of Amendment No. 281 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | |
ML24017A158 | 17 January 2024 | Submittal of Emergency Plan Revision 50 | |
IR 05000313/2023420 | 10 January 2024 | Security Baseline Inspection Report 05000313/2023420 and 05000368/2023420 | |
IR 05000313/2023402 | 2 January 2024 | Security Baseline Inspection Report 05000313/2023402 and 05000368/2023402 | |
ML23349A167 | 21 December 2023 | Request for Withholding Information from Public Disclosure | Affidavit |
ML23354A002 | 21 December 2023 | Request for Withholding Information from Public Disclosure | Exclusive Use Affidavit |
ML23348A357 | 14 December 2023 | Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting | Surveillance Frequency Control Program Affidavit |
ML23340A159 | 13 December 2023 | Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment | |
ML23352A029 | 13 December 2023 | Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection | |
IR 05000313/2023405 | 12 December 2023 | Security Baseline Inspection Report 05000313/2023405 and 05000368/2023405 | Affidavit |
ML23341A083 | 11 December 2023 | Material Control and Accounting Program Inspection Report 05000313/368/2023404- Cover Letter | Affidavit |
ML23305A092 | 7 December 2023 | Summary of Regulatory Audit Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b | Tornado Missile Internal Flooding Probabilistic Risk Assessment Emergency Lighting FLEX TORMIS Battery sizing |
ML23333A136 | 29 November 2023 | Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | |
ML23275A207 | 28 November 2023 | Issuance of Amendment No. 280 Removal of Technical Specification Condition Allowing Two Reactor Coolant Pump Operation | Anticipated operational occurrence Surveillance Frequency Control Program Safeguards Contingency Plan Nonconservative Technical Specifications Fuel cladding |
ML23325A141 | 21 November 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | |
IR 05000313/2023003 | 21 November 2023 | Revised - ANO Revised Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/ 2023001 | Boric Acid Stroke time Enforcement Discretion Functionality Assessment FLEX Significance Determination Process Job Performance Measure Operability Determination Spent Fuel Pool Instrumentation Fire Protection Program Downpower |
ML23243B045 | 13 November 2023 | Request for Withholding Information from Public Disclosure | Exclusive Use Affidavit |
ML23313A096 | 13 November 2023 | Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023001 | Boric Acid Stroke time Enforcement Discretion Functionality Assessment FLEX Operability Determination Fire Protection Program Downpower |
ML23311A208 | 9 November 2023 | Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV | |
IR 05000313/2023011 | 10 October 2023 | Commercial Grade Dedication Inspection Report 05000313/2023011 and 05000368/2023011 | Commercial Grade Dedication |
IR 05000313/2023005 | 21 August 2023 | Updated Inspection Plan for Arkansas Nuclear One, Units 1 and 2 (Report 05000313/2023005 and 05000368/2023005) - Mid Cycle | Fitness for Duty Commercial Grade Dedication Cyber Security |
IR 05000313/2024301 | 14 August 2023 | Notification of NRC Initial Operator Licensing Examination 05000313/2024301 | |
IR 05000313/2023002 | 11 August 2023 | Integrated Inspection Report 05000313/2023002 and 05000368/2023002 and Notice of Violation | Boric Acid High Radiation Area Non-Destructive Examination Grab sample Offsite Dose Calculation Manual Fire Barrier Enforcement Discretion Probabilistic Risk Assessment Met Tower Nondestructive Examination Temporary Modification VT-2 Functionality Assessment Condition Adverse to Quality FLEX Aging Management Significance Determination Process Annual Radioactive Effluent Release Report Design basis earthquake Operability Determination Unplanned internal exposure Liquid penetrant Fire Protection Program Scaffolding Substantial potential for overexposure Coast down Overexposure |
ML23209A602 | 9 August 2023 | Regulatory Audit Plan in Support of License Amendment Request to Revise Technical Specifications to Adopt Risk- Informed Completion Times | High winds Tornado Missile Internal Flooding Probabilistic Risk Assessment FLEX Tornado Generated Missile Tornado Missile Protection |
IR 05000416/2023002 | 8 August 2023 | Integrated Inspection Report 05000416/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200050/2023001 | Stroke time Temporary Modification Functionality Assessment Condition Adverse to Quality Significance Determination Process Scram Discharge Volume Operability Determination Fire Protection Program Power change Unidentified leakage |
ML23208A213 | 3 August 2023 | Regulatory Audit Summary Concerning Review of License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation | |
ML23208A211 | 27 July 2023 | Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions | Shutdown Margin Reactor Vessel Water Level Packing leak Water Inventory Control Surveillance Frequency Control Program Pressure Boundary Leakage |
ML23188A173 | 12 July 2023 | Request for Withholding Information from Public Disclosure | |
ML23142A202 | 29 June 2023 | Issuance of Amendment Nos. 279 and 332 Emergency Plan Staffing Requirements | Minimum staff |
IR 05000313/2023403 | 28 June 2023 | Security Baseline Inspection Report 05000313/2023403 and 05000368/2023403 | |
ML23178A089 | 26 June 2023 | August 2023 Emergency Preparedness Program Inspection-Request for Information | |
ML23166B090 | 21 June 2023 | Request for Relief ANO1 ISI 036 Regarding Volumetric Examination Requirements | Incorporated by reference |
ML23180A108 | 20 June 2023 | ANO Unit 1 SAR Amendment 31, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report | Cyber Security Aging Management Turbine Missile |
IR 05000313/2023401 | 13 June 2023 | Cyber Security Inspection Report 05000313/2023401 and 05000368/2023401 | Cyber Security Affidavit |
ML23130A297 | 17 May 2023 | Notification of Inspection (NRC Inspection Report 05000313/2023003) and Request for Information | |
ML23114A357 | 10 May 2023 | Regulatory Audit Summary Concerning Review of Request for Alternative ANO-CISI-002 Regarding Containment Inservice Inspection Frequency | |
ML23121A301 | 10 May 2023 | Regulatory Audit Plan in Support of License Amendment Request to Revise Technical Specifications to Adopt Risk - Informed Completion Times | Internal Flooding Probabilistic Risk Assessment FLEX |
ML23130A273 | 10 May 2023 | and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations | |
IR 05000313/2023001 | 9 May 2023 | Integrated Inspection Report 05000313/2023001 and 05000368/2023001 | Safe Shutdown Enforcement Discretion Probabilistic Risk Assessment Temporary Modification Functionality Assessment Significance Determination Process Surveillance Frequency Control Program Operability Determination Maintenance Rule Program Fire Protection Program Power change Coast down Unidentified leakage |
ML23118A320 | 8 May 2023 | Notification of Biennial Problem Identification and Resolution Inspection and Request for Information (05000313;05000368/2023010) | Operability Determination |
IR 05000368/2023301 | 1 May 2023 | NRC Examination Report 05000368/2023301 | |
ML23117A217 | 1 May 2023 | Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment | |
ML23108A136 | 24 April 2023 | Approval of Request for Half-Nozzle Repair of Reactor Vessel Closure Head Penetration No. 46 | Hydrostatic Nondestructive Examination |
ML23110A112 | 20 April 2023 | Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G |