Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
IR 05000261/202300431 January 2024Integrated Inspection Report 05000261/2023004
IR 05000261/202342030 November 2023Security Baseline Inspection Report 05000261/2023420 (Cover Letter with Report)Safeguards Contingency Plan
IR 05000261/202301028 November 2023Fire Protection Team Inspection Report 05000261/2023010Safe Shutdown
Probabilistic Risk Assessment
Temporary Modification
Aging Management
IR 05000261/20230037 November 2023Integrated Inspection Report 05000261 2023003 and 07200060 2023001Boric Acid
High Radiation Area
Internal Flooding
Enforcement Discretion
Functionality Assessment
Significance Determination Process
Operability Determination
Overtravel
Maintenance Rule Program
Fire Protection Program
Substantial potential for overexposure
Power change
Overexposure
IR 05000261/202300521 August 2023Updated Inspection Plan for H.B. Robinson Steam Electric Plant (Report 05000261/2023005)Commercial Grade Dedication
IR 05000261/20230027 August 2023Integrated Inspection Report 05000261/2023002Enforcement Discretion
Fire impairment
Operating Basis Earthquake
Temporary Modification
Functionality Assessment
Aging Management
Operability Determination
Earthquake
Maintenance Rule Program
Continuous fire watch
Fire Protection Program
Downpower
IR 05000261/202340230 May 2023Cyber Security Inspection Report 05000261/2023402Cyber Security
Affidavit
IR 05000261/20230012 May 2023Integrated Inspection Report 05000261/2023001Temporary Modification
Emergency Lighting
Functionality Assessment
FLEX
Significance Determination Process
Operability Determination
Fire Protection Program
Reverse polarity
IR 05000261/20220061 March 2023Annual Assessment Letter for H.B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2022006)Commercial Grade Dedication
Cyber Security
Exemption Request
Coronavirus
ML23041A22713 February 20232022 Q4 Robinson_Workflow FinalBoric Acid
High Radiation Area
Stroke time
Weld Overlay
Internal Flooding
Enforcement Discretion
Nondestructive Examination
Temporary Modification
Functionality Assessment
Locked High Radiation Area
Aging Management
Significance Determination Process
Maintenance Rule Program
Liquid penetrant
Fire Protection Program
IR 05000261/20220033 November 2022Integrated Inspection Report 05000261 2022003Internal Flooding
Temporary Modification
Functionality Assessment
Operability Determination
Earthquake
Fire Protection Program
Power change
IR 05000261/202240219 October 2022Security Baseline Inspection Report 05000261/2022402
IR 05000261/202201026 September 2022Design Basis Assurance Inspection (Teams) Inspection Report 05000261/2022010Ultimate heat sink
FLEX
Large early release frequency
Battery sizing
IR 05000261/202230123 September 2022301 Operator License Exam Approval Letter (05000261/2022301)
IR 05000261/202200526 August 2022Updated Inspection Plan for the H.B Robinson Steam Electric Plant - Report 05000261/2022005-FinalCommercial Grade Dedication
Cyber Security
Exemption Request
COVID-19
IR 05000261/202140410 August 2022Reissue - H.B. Robinson Steam Electric Plant Security Baseline Inspection Report 05000261/2021404
IR 05000261/20220029 August 2022Integrated Inspection Report 05000261 2022002, 07200060 2022001 and Exercise of Enforcement DiscretionUnanalyzed Condition
Tornado Missile
Enforcement Discretion
Temporary Modification
Functionality Assessment
FLEX
Operability Determination
Severe Accident Management Guideline
Earthquake
Continuous fire watch
Fire Protection Program
Fire Watch
IR 05000261/202201119 July 2022Biennial Problem Identification and Resolution Inspection Report 05000261/2022011Boric Acid
Internal Flooding
Cyber Security
Condition Adverse to Quality
Significance Determination Process
Operability Determination
Power change
Unidentified leakage
IR 05000261/20220012 May 2022Integrated Inspection Report 05000261/2022001High winds
Internal Flooding
Temporary Modification
Functionality Assessment
Operability Determination
Fire Protection Program
IR 05000261/202240119 April 2022Security Baseline Inspection Report 05000261/2022401Fitness for Duty
IR 05000261/20210062 March 2022Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 (Report No. 05000261/2021006)Fitness for Duty
Cyber Security
Exemption Request
Coronavirus
IR 05000261/202100425 January 2022Integrated Inspection Report 050000261/2021004Boric Acid
High Radiation Area
Fire impairment
Temporary Modification
Functionality Assessment
Locked High Radiation Area
Operability Determination
Fire Protection Program
Fire Watch
ML21342A2128 December 2021Security Baseline Inspection Report 05000261/2021404
IR 05000261/202140329 November 2021Material Control and Accounting Program Inspection Report 05000261/2021403 (OUO Removed)Affidavit
IR 05000261/202130119 November 2021NRC Operator License Examination Report 05000261/2021301
IR 05000261/20210034 November 2021Integrated Inspection Report 05000261/2021003Ultimate heat sink
Internal Flooding
Temporary Modification
Functionality Assessment
Operability Determination
License Renewal
Coronavirus
COVID-19
Fire Protection Program
Power change
IR 05000261/20214023 November 2021Security Baseline Inspection Report 05000261/2021402
IR 05000261/202100525 August 2021Updated Inspection Plan for H. B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2021005)Fitness for Duty
Cyber Security
Exemption Request
COVID-19
IR 05000261/20210023 August 2021Integrated Inspection Report 05000261/2021002Mission time
Probabilistic Risk Assessment
Met Tower
Operator Manual Action
Temporary Modification
Functionality Assessment
Open Phase Condition
Operability Determination
Coronavirus
COVID-19
Fire Protection Program
IR 05000261/20214018 July 2021Cyber Security Inspection Report 05000261/2021401 (Public)Cyber Security
Affidavit
IR 05000261/202100110 May 2021Integrated Inspection Report 05000261/2021001Internal Flooding
Functionality Assessment
FLEX
Operability Determination
Coronavirus
COVID-19
Fire Protection Program
IR 05000261/202101022 March 2021Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000261/2021010Cyber Security
Coronavirus
IR 05000261/20200063 March 2021Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 Report 05000261/2020006Fitness for Duty
Operator Manual Action
Cyber Security
Open Phase Condition
Exemption Request
COVID-19
IR 05000261/20200049 February 2021Integration Inspection Report 05000261/2020004 and Independent Spent Fuel Storage Fuel Storage Installation Inspection (ISFSI) Report 0720060/2020002Boric Acid
High Radiation Area
Internal Flooding
Nondestructive Examination
VT-2
Functionality Assessment
Locked High Radiation Area
Operability Determination
Moisture barrier
Coronavirus
COVID-19
Liquid penetrant
Fire Protection Program
Scaffolding
IR 05000261/202001121 December 2020Design Basis Assurance Inspection (Programs) Inspection Report 05000261/2020011Hot Short
Packing leak
Mission time
Power-Operated Valves
Coronavirus
COVID-19
Very Low Safety Significance Issue Resolution
Weak link
ML20351A26815 December 2020Requalification Program Inspection Notification Letter W Materials List
IR 05000261/202000330 October 2020Integrated Inspection Report 05000261/2020003Functionality Assessment
Operability Determination
Coronavirus
COVID-19
Fire Protection Program
Power change
IR 05000261/202040128 October 2020Security Baseline Inspection Report 05000261/2020401Coronavirus
COVID-19
ML20289A63621 October 2020Security Inspection Report 05000261/2020420 - Cover Letter
IR 05000261/202042014 October 2020Security Inspection Report 05000261/2020420 - IP 92707
IR 05000261/202001230 September 2020Fire Protection Team Inspection Report 05000261/2020012Safe Shutdown
Probabilistic Risk Assessment
Temporary Modification
Aging Management
License Renewal
Fire Protection Program
Fire Watch
IR 05000261/202000223 July 2020Integrated Inspection Report 05000261-2020002, and Independent Spent Fuel Storage Installation Inspection Isfi Report 0720060-2020001Commercial Grade Dedication
Temporary Modification
Functionality Assessment
Operability Determination
Coronavirus
COVID-19
Fire Protection Program
Downpower
IR 05000261/202000115 April 2020Integrated Inspection Report 05000261/2020001Internal Flooding
Enforcement Discretion
Temporary Modification
Functionality Assessment
FLEX
Operability Determination
Coronavirus
COVID-19
Fire Protection Program
IR 05000261/202001018 March 2020Biennial Problem Identification and Resolution Inspection Report 05000261/2020010Fatigue Rule
IR 05000261/20190063 March 2020Annual Assessment Letter for H. B. Robinson Steam Electric Plant Unit 2 NRC Report 05000261/2019006Operator Manual Action
Cyber Security
Open Phase Condition
IR 05000261/201900413 February 2020Integrated Inspection Report 05000261/2019004, and Independent Spent Fuel Storage Installation Inspection (ISFSI) Report 0720060/2019002High Radiation Area
Offsite Dose Calculation Manual
Commercial Grade Dedication
Internal Flooding
Met Tower
Temporary Modification
Functionality Assessment
Annual Radioactive Effluent Release Report
Process Control Program
Operability Determination
Annual Radiological Effluent Release Report
Fire Protection Program
IR 05000261/202040223 January 2020Information Request for the Cyber-Security Baseline Security Inspection, Notification to Perform Inspection 05000261/2020402Cyber Security
IR 05000261/201930119 November 2019NRC Operator License Examination Report 05000261/2019301
IR 05000261/201900314 November 2019Integrated Inspection Report 05000261/2019003Boric Acid
Time to boil
Enforcement Discretion
Functionality Assessment
Operability Determination
Power change
IR 05000261/201901219 September 2019NRC Inspection Report 05000261/2019012, and Investigation Report 2-2018-004; and Apparent Violations