IR 05000261/2023004 | 31 January 2024 | Integrated Inspection Report 05000261/2023004 | |
IR 05000261/2023420 | 30 November 2023 | Security Baseline Inspection Report 05000261/2023420 (Cover Letter with Report) | Safeguards Contingency Plan |
IR 05000261/2023010 | 28 November 2023 | Fire Protection Team Inspection Report 05000261/2023010 | Safe Shutdown Probabilistic Risk Assessment Temporary Modification Aging Management |
IR 05000261/2023003 | 7 November 2023 | Integrated Inspection Report 05000261 2023003 and 07200060 2023001 | Boric Acid High Radiation Area Internal Flooding Enforcement Discretion Functionality Assessment Significance Determination Process Operability Determination Overtravel Maintenance Rule Program Fire Protection Program Substantial potential for overexposure Power change Overexposure |
IR 05000261/2023005 | 21 August 2023 | Updated Inspection Plan for H.B. Robinson Steam Electric Plant (Report 05000261/2023005) | Commercial Grade Dedication |
IR 05000261/2023002 | 7 August 2023 | Integrated Inspection Report 05000261/2023002 | Enforcement Discretion Fire impairment Operating Basis Earthquake Temporary Modification Functionality Assessment Aging Management Operability Determination Earthquake Maintenance Rule Program Continuous fire watch Fire Protection Program Downpower |
IR 05000261/2023402 | 30 May 2023 | Cyber Security Inspection Report 05000261/2023402 | Cyber Security Affidavit |
IR 05000261/2023001 | 2 May 2023 | Integrated Inspection Report 05000261/2023001 | Temporary Modification Emergency Lighting Functionality Assessment FLEX Significance Determination Process Operability Determination Fire Protection Program Reverse polarity |
IR 05000261/2022006 | 1 March 2023 | Annual Assessment Letter for H.B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2022006) | Commercial Grade Dedication Cyber Security Exemption Request Coronavirus |
ML23041A227 | 13 February 2023 | 2022 Q4 Robinson_Workflow Final | Boric Acid High Radiation Area Stroke time Weld Overlay Internal Flooding Enforcement Discretion Nondestructive Examination Temporary Modification Functionality Assessment Locked High Radiation Area Aging Management Significance Determination Process Maintenance Rule Program Liquid penetrant Fire Protection Program |
IR 05000261/2022003 | 3 November 2022 | Integrated Inspection Report 05000261 2022003 | Internal Flooding Temporary Modification Functionality Assessment Operability Determination Earthquake Fire Protection Program Power change |
IR 05000261/2022402 | 19 October 2022 | Security Baseline Inspection Report 05000261/2022402 | |
IR 05000261/2022010 | 26 September 2022 | Design Basis Assurance Inspection (Teams) Inspection Report 05000261/2022010 | Ultimate heat sink FLEX Large early release frequency Battery sizing |
IR 05000261/2022301 | 23 September 2022 | 301 Operator License Exam Approval Letter (05000261/2022301) | |
IR 05000261/2022005 | 26 August 2022 | Updated Inspection Plan for the H.B Robinson Steam Electric Plant - Report 05000261/2022005-Final | Commercial Grade Dedication Cyber Security Exemption Request COVID-19 |
IR 05000261/2021404 | 10 August 2022 | Reissue - H.B. Robinson Steam Electric Plant Security Baseline Inspection Report 05000261/2021404 | |
IR 05000261/2022002 | 9 August 2022 | Integrated Inspection Report 05000261 2022002, 07200060 2022001 and Exercise of Enforcement Discretion | Unanalyzed Condition Tornado Missile Enforcement Discretion Temporary Modification Functionality Assessment FLEX Operability Determination Severe Accident Management Guideline Earthquake Continuous fire watch Fire Protection Program Fire Watch |
IR 05000261/2022011 | 19 July 2022 | Biennial Problem Identification and Resolution Inspection Report 05000261/2022011 | Boric Acid Internal Flooding Cyber Security Condition Adverse to Quality Significance Determination Process Operability Determination Power change Unidentified leakage |
IR 05000261/2022001 | 2 May 2022 | Integrated Inspection Report 05000261/2022001 | High winds Internal Flooding Temporary Modification Functionality Assessment Operability Determination Fire Protection Program |
IR 05000261/2022401 | 19 April 2022 | Security Baseline Inspection Report 05000261/2022401 | Fitness for Duty |
IR 05000261/2021006 | 2 March 2022 | Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 (Report No. 05000261/2021006) | Fitness for Duty Cyber Security Exemption Request Coronavirus |
IR 05000261/2021004 | 25 January 2022 | Integrated Inspection Report 050000261/2021004 | Boric Acid High Radiation Area Fire impairment Temporary Modification Functionality Assessment Locked High Radiation Area Operability Determination Fire Protection Program Fire Watch |
ML21342A212 | 8 December 2021 | Security Baseline Inspection Report 05000261/2021404 | |
IR 05000261/2021403 | 29 November 2021 | Material Control and Accounting Program Inspection Report 05000261/2021403 (OUO Removed) | Affidavit |
IR 05000261/2021301 | 19 November 2021 | NRC Operator License Examination Report 05000261/2021301 | |
IR 05000261/2021003 | 4 November 2021 | Integrated Inspection Report 05000261/2021003 | Ultimate heat sink Internal Flooding Temporary Modification Functionality Assessment Operability Determination License Renewal Coronavirus COVID-19 Fire Protection Program Power change |
IR 05000261/2021402 | 3 November 2021 | Security Baseline Inspection Report 05000261/2021402 | |
IR 05000261/2021005 | 25 August 2021 | Updated Inspection Plan for H. B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2021005) | Fitness for Duty Cyber Security Exemption Request COVID-19 |
IR 05000261/2021002 | 3 August 2021 | Integrated Inspection Report 05000261/2021002 | Mission time Probabilistic Risk Assessment Met Tower Operator Manual Action Temporary Modification Functionality Assessment Open Phase Condition Operability Determination Coronavirus COVID-19 Fire Protection Program |
IR 05000261/2021401 | 8 July 2021 | Cyber Security Inspection Report 05000261/2021401 (Public) | Cyber Security Affidavit |
IR 05000261/2021001 | 10 May 2021 | Integrated Inspection Report 05000261/2021001 | Internal Flooding Functionality Assessment FLEX Operability Determination Coronavirus COVID-19 Fire Protection Program |
IR 05000261/2021010 | 22 March 2021 | Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000261/2021010 | Cyber Security Coronavirus |
IR 05000261/2020006 | 3 March 2021 | Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 Report 05000261/2020006 | Fitness for Duty Operator Manual Action Cyber Security Open Phase Condition Exemption Request COVID-19 |
IR 05000261/2020004 | 9 February 2021 | Integration Inspection Report 05000261/2020004 and Independent Spent Fuel Storage Fuel Storage Installation Inspection (ISFSI) Report 0720060/2020002 | Boric Acid High Radiation Area Internal Flooding Nondestructive Examination VT-2 Functionality Assessment Locked High Radiation Area Operability Determination Moisture barrier Coronavirus COVID-19 Liquid penetrant Fire Protection Program Scaffolding |
IR 05000261/2020011 | 21 December 2020 | Design Basis Assurance Inspection (Programs) Inspection Report 05000261/2020011 | Hot Short Packing leak Mission time Power-Operated Valves Coronavirus COVID-19 Very Low Safety Significance Issue Resolution Weak link |
ML20351A268 | 15 December 2020 | Requalification Program Inspection Notification Letter W Materials List | |
IR 05000261/2020003 | 30 October 2020 | Integrated Inspection Report 05000261/2020003 | Functionality Assessment Operability Determination Coronavirus COVID-19 Fire Protection Program Power change |
IR 05000261/2020401 | 28 October 2020 | Security Baseline Inspection Report 05000261/2020401 | Coronavirus COVID-19 |
ML20289A636 | 21 October 2020 | Security Inspection Report 05000261/2020420 - Cover Letter | |
IR 05000261/2020420 | 14 October 2020 | Security Inspection Report 05000261/2020420 - IP 92707 | |
IR 05000261/2020012 | 30 September 2020 | Fire Protection Team Inspection Report 05000261/2020012 | Safe Shutdown Probabilistic Risk Assessment Temporary Modification Aging Management License Renewal Fire Protection Program Fire Watch |
IR 05000261/2020002 | 23 July 2020 | Integrated Inspection Report 05000261-2020002, and Independent Spent Fuel Storage Installation Inspection Isfi Report 0720060-2020001 | Commercial Grade Dedication Temporary Modification Functionality Assessment Operability Determination Coronavirus COVID-19 Fire Protection Program Downpower |
IR 05000261/2020001 | 15 April 2020 | Integrated Inspection Report 05000261/2020001 | Internal Flooding Enforcement Discretion Temporary Modification Functionality Assessment FLEX Operability Determination Coronavirus COVID-19 Fire Protection Program |
IR 05000261/2020010 | 18 March 2020 | Biennial Problem Identification and Resolution Inspection Report 05000261/2020010 | Fatigue Rule |
IR 05000261/2019006 | 3 March 2020 | Annual Assessment Letter for H. B. Robinson Steam Electric Plant Unit 2 NRC Report 05000261/2019006 | Operator Manual Action Cyber Security Open Phase Condition |
IR 05000261/2019004 | 13 February 2020 | Integrated Inspection Report 05000261/2019004, and Independent Spent Fuel Storage Installation Inspection (ISFSI) Report 0720060/2019002 | High Radiation Area Offsite Dose Calculation Manual Commercial Grade Dedication Internal Flooding Met Tower Temporary Modification Functionality Assessment Annual Radioactive Effluent Release Report Process Control Program Operability Determination Annual Radiological Effluent Release Report Fire Protection Program |
IR 05000261/2020402 | 23 January 2020 | Information Request for the Cyber-Security Baseline Security Inspection, Notification to Perform Inspection 05000261/2020402 | Cyber Security |
IR 05000261/2019301 | 19 November 2019 | NRC Operator License Examination Report 05000261/2019301 | |
IR 05000261/2019003 | 14 November 2019 | Integrated Inspection Report 05000261/2019003 | Boric Acid Time to boil Enforcement Discretion Functionality Assessment Operability Determination Power change |
IR 05000261/2019012 | 19 September 2019 | NRC Inspection Report 05000261/2019012, and Investigation Report 2-2018-004; and Apparent Violations | |