IR 05000259/2023010 | 11 December 2023 | Commercial Grade Dedication Inspection Report 05000259/2023010 and 05000260/2023010 and 05000296/2023010 | Commercial Grade Dedication |
IR 05000259/2023003 | 13 November 2023 | Integrated Inspection Report 05000259/2023003, 05000260/2023003 and 05000296/2023003 | Safe Shutdown High Radiation Area Stroke time Enforcement Discretion Coatings Temporary Modification Functionality Assessment FLEX Corrosion bonding Significance Determination Process Operability Determination Pressure Boundary Leakage Pressure boundary leak Through Wall Leak Fire Protection Program Fire Watch Hourly Fire Watch Substantial potential for overexposure Flow Induced Vibration Power Uprate Overexposure |
IR 05000259/2023040 | 2 November 2023 | Supplemental Inspection Supplemental Report 05000259 2023040 and Follow-Up Assessment Letter | Condition Adverse to Quality |
IR 05000259/2023005 | 29 August 2023 | Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2023005, 05000260/2023005 and 05000296/2023005 | Commercial Grade Dedication Cyber Security Aging Management License Renewal |
IR 05000259/2023002 | 10 August 2023 | Integrated Inspection Report 05000259/2023002, 05000260/2023002, 05000296/2023002 and 07200052/2023001 | Enforcement Discretion Temporary Modification Functionality Assessment Operability Determination Fire Protection Program Power change Operability Assessment |
IR 05000259/2023301 | 18 July 2023 | NRC Operator License Examination Report Nos. 05000259/2023301, 05000260/2023301, and 05000296/2023301 | |
IR 05000259/2023402 | 12 June 2023 | Material Control and Accounting Program Inspection Report 05000259 2023402, 05000260 2023402 and 05000296 2023402 | Affidavit |
IR 05000259/2023091 | 8 May 2023 | Final Significance Determination of a White Finding and Nov and Assessment Followup Letter; NRC Inspection Report 05000259/2023091 | Condition Adverse to Quality Significance Determination Process Preliminary White Finding |
IR 05000259/2023001 | 3 May 2023 | Integrated Inspection Report 05000259/2023001, 05000260/2023001 and 05000296/2023001 | High winds High Radiation Area Stroke time Enforcement Discretion Probabilistic Risk Assessment Nondestructive Examination Temporary Modification Functionality Assessment Corrosion bonding Annual Radioactive Effluent Release Report Operability Determination Pressure Boundary Leakage Fire Protection Program |
IR 05000259/2023440 | 23 March 2023 | Special Inspection Supplemental Report 05000259 2023440 and 05000260 2023440 and 05000296 2023440 Cover Letter | Affidavit |
IR 05000259/2023401 | 8 March 2023 | Security Baseline Inspection Report 05000259 2023401 and 05000260/2023401 and 05000296/2023401 | Fitness for Duty Fatigue Rule |
IR 05000259/2023090 | 2 March 2023 | NRC Inspection Report 05000259/2023090 and 05000260 2023090 and Preliminary White Finding and Apparent Violation | High winds Internal Flooding Past operability Condition Adverse to Quality FLEX Significance Determination Process Large early release frequency Preliminary White Finding |
IR 05000259/2022006 | 1 March 2023 | Annual Assessment Letter for Browns Ferry Nuclear Plant, Units 1, 2 and 3 Report 05000259/2022006, 05000260/2022006 and 05000296/2022006 | Commercial Grade Dedication Cyber Security Exemption Request Coronavirus |
IR 05000259/2022004 | 7 February 2023 | Integrated Inspection Report 05000259/2022004, 05000260/2022004 and 05000296/2022004 | Reactor Vessel Water Level Packing leak Non-Destructive Examination Enforcement Discretion Nondestructive Examination Temporary Modification Functionality Assessment FLEX Aging Management Operability Determination Severe Accident Management Guideline Moisture barrier License Renewal Fire Protection Program Power change |
IR 05000259/2022003 | 9 November 2022 | Browns Perry Nuclear Plant - Integrated Inspection Report 05000259/2022003, 05000260/2022003 and 05000296/2022003 | Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Functionality Assessment Job Performance Measure Operability Determination Fire Protection Program Downpower Coast down |
IR 05000259/2022012 | 20 September 2022 | Biennial Problem Identification and Resolution Inspection Report 05000259 2022012, 05000260 2022012 and 05000296 2022012 | Half scram Past operability Enforcement Discretion Temporary Modification Significance Determination Process Operability Determination Pressure Boundary Leakage Pressure boundary leak Through Wall Leak |
IR 05000259/2022011 | 16 September 2022 | Design Basis Assurance Inspection (Programs) Inspection Report 05000259/2022011 and 05000260/2022011 and 05000296/2022011 | Stroke time Squib Condition Adverse to Quality Significance Determination Process Scram Discharge Volume Operability Determination Power-Operated Valves Coast down Weak link |
IR 05000259/2022402 | 6 September 2022 | Security Baseline Inspection Report 05000259/2022402 and 05000260/2022402 and 05000296/2022402 Cover Letter | Affidavit |
IR 05000259/2022005 | 30 August 2022 | Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 Report 05000259/2022005, 05000260/2022005 and 05000296/2022005 | Fitness for Duty Commercial Grade Dedication License Renewal Exemption Request COVID-19 |
IR 05000259/2022002 | 8 August 2022 | Integrated Inspection Report 05000259/2022002, 05000260/2022002 and 05000296/2022002 | Safe Shutdown High winds Commercial Grade Dedication Internal Flooding Enforcement Discretion Functionality Assessment Foreign Material Exclusion Operability Determination License Renewal Fire Protection Program |
IR 05000259/2022420 | 19 July 2022 | Security Baseline Inspection Report 05000259/2022420, 05000260/2022420 and 05000296/2022420 | Affidavit |
ML22181A956 | 29 June 2022 | Bf Report 2022-401 Base Public Cover Letter | Cyber Security |
ML22173A162 | 21 June 2022 | Replacement Steam Dryer Visual Inspection Results (U3R20) | |
IR 05000259/2022001 | 12 May 2022 | Integrated Inspection Report 05000259/2022001, 05000260/2022001, 05000296/2022001 and Exercise of Enforcement Discretion | High winds High Radiation Area Internal Flooding Hydrostatic Past operability Enforcement Discretion Probabilistic Risk Assessment Nondestructive Examination Temporary Modification Functionality Assessment Locked High Radiation Area Operability Determination Control of Heavy Loads Liquid penetrant Fire Protection Program Downpower Coast down Unidentified leakage |
IR 05000259/2022010 | 30 March 2022 | Triennial Fire Protection Inspection Report 05000259/2022010 and 05000260/2022010 and 05000296/2022010 and Apparent Violation | Safe Shutdown Fire Barrier Significance Determination Process Time Critical Operator Action Fire Protection Program |
IR 05000259/2022401 | 8 March 2022 | Information Request for the Cyber-Security Baseline Inspection Notification to Perform Inspection 05000259/2022401; 05000260/2022401; 05000296/2022401 | Cyber Security |
IR 05000259/2021006 | 2 March 2022 | Annual Assessment Letter for Browns Ferry Nuclear Plant, Units 1, 2 and 3 (Report No. 05000259/2021006, 05000260/2021006 and 05000296/2021006 | Fitness for Duty Cyber Security License Renewal Exemption Request Power-Operated Valves COVID-19 |
IR 05000259/2021004 | 31 January 2022 | Integrated Inspection Report 05000259/2021004, 05000260/2021004 and 05000296/2021004 | Past operability Enforcement Discretion Coatings Temporary Modification Functionality Assessment FLEX Corrosion bonding Significance Determination Process Operability Determination Fire Protection Program Power change Downpower |
IR 05000259/2021403 | 19 January 2022 | NRC Inspection Report 05000259/2021403, 05000260/2021403 and 05000296/2021403 | Fitness for Duty |
IR 05000259/2021402 | 18 January 2022 | Brows Ferry Nuclear Plant - Security Baseline Inspection Report 05000259/2021402 and 05000260/2021402 and 05000296/2021402 | Cyber Security |
IR 05000259/2021003 | 9 November 2021 | Integrated Inspection Report 05000259/2021003, 05000260/2021003, 05000296/2021003 and 07200052/2021001 | Safe Shutdown Offsite Dose Calculation Manual Stroke time Internal Flooding Past operability Enforcement Discretion Probabilistic Risk Assessment Temporary Modification Functionality Assessment Aging Management Significance Determination Process Operability Determination Control of Heavy Loads Coronavirus COVID-19 Fire Protection Program Downpower Unidentified leakage |
IR 05000259/2021401 | 31 August 2021 | Security Baseline Inspection Report 05000259/2021401 and 05000260/2021401 and 05000296/2021401 | |
IR 05000259/2021011 | 24 August 2021 | Temporary Instruction 2515/TI-193 Inspection Report 05000259/2021011, 05000260/2021011, and 05000296/2021011 | FLEX Significance Determination Process Operability Determination Time Critical Operator Action Coronavirus COVID-19 |
IR 05000259/2021005 | 23 August 2021 | Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2, and 3- Report Nos. 05000259/2021005, 05000260/2021005 and 5000296/2021005 | Cyber Security License Renewal Exemption Request COVID-19 |
ML21217A283 | 5 August 2021 | Resident Integrated Inspection Report 2021-002 | High Radiation Area Commercial Grade Dedication Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Coatings Temporary Modification Functionality Assessment Missed surveillance Corrosion bonding Significance Determination Process Annual Radioactive Effluent Release Report Foreign Material Exclusion Coronavirus COVID-19 Fire Protection Program Downpower |
IR 05000259/2021301 | 28 July 2021 | NRC Operator License Examination Report Nos. 05000259/2021301, 05000260/2021301, 05000296/2021301 | |
IR 05000259/2021010 | 26 July 2021 | Design Basis Assurance Inspection (Teams) Inspection Report 05000259/2021010 and 05000260/2021010 and 05000296/2021010 | Safe Shutdown Large early release frequency Operability Determination Time Critical Operator Action Coronavirus COVID-19 |
IR 05000259/2020401 | 26 May 2021 | Security Baseline Inspection Report 05000259/2020401 and 05000260/2020401 and 05000296/2020401(U) | Affidavit |
IR 05000259/2021001 | 28 April 2021 | Integrated Inspection Report 05000259/2021001, 05000260/2021001 and 05000296/2021001 | High winds Mission time Enforcement Discretion Coatings Nondestructive Examination Temporary Modification Functionality Assessment Corrosion bonding Operability Determination License Renewal Coronavirus COVID-19 Fire Protection Program Downpower Coast down |
IR 05000259/2020006 | 3 March 2021 | Annual Assessment Letter for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2020006, 05000260/2020006 and 05000296/2020006 | Enforcement Discretion Exemption Request Power-Operated Valves COVID-19 |
IR 05000259/2020004 | 28 January 2021 | Integrated Inspection Report 05000259/2020004, 05000260/2020004, 05000296/2020004, 07200052/2020002 and Exercise of Enforcement Discretion | High Radiation Area Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Nondestructive Examination Temporary Modification Functionality Assessment FLEX Operability Determination Control of Heavy Loads Coronavirus COVID-19 Biofouling Fire Protection Program Power change Coast down |
IR 05000259/2020402 | 8 January 2021 | Material Control and Accounting Program Inspection Report 05000259/2020402, 05000260/2020402 and 05000296/2020402 | Affidavit |
IR 05000259/2020003 | 10 November 2020 | Integrated Inspection Report 05000259/2020003, 05000260/2020003 and 05000296/2020003 | Past operability Enforcement Discretion Probabilistic Risk Assessment Functionality Assessment Significance Determination Process Operability Determination Coronavirus COVID-19 Fuel cladding Biofouling Fire Protection Program |
IR 05000254/2020003 | 9 November 2020 | Integrated Inspection Report 05000254/2020003; 05000265/2020003 and 07200053/2020001 | Safe Shutdown Time of Discovery Anticipated operational occurrence Past operability Enforcement Discretion VT-2 Functionality Assessment FLEX Significance Determination Process Operability Determination Control of Heavy Loads Coronavirus COVID-19 Through-Wall Leak Fire Protection Program Incremental Core Damage Probability Deficit Downpower |
IR 05000259/2020011 | 26 October 2020 | Biennial Problem Identification and Resolution Inspection Report 05000259/2020011, 05000260/2020011 and 05000296/2020011 | Operability Determination Coronavirus COVID-19 Fatigue Rule |
IR 05000259/2020404 | 29 September 2020 | NRC Security Inspection Report 05000259/2020404 and 05000260/2020404 and 05000296/2020404 and Apparent Violation (U) | Fitness for Duty Inattentive Affidavit |
IR 05000259/2020005 | 18 August 2020 | Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2020005, 05000260/2020005, and 05000296/2020005 | Cyber Security Exemption Request COVID-19 Inattentive |
IR 05000259/2020002 | 6 August 2020 | Brown Ferry Nuclear Plant Integrated Inspection Report 05000259/2020002, 05000260/2020002, 05000296/2020002, and 07200052/2020001 | Temporary Modification Functionality Assessment Operability Determination Control of Heavy Loads Coronavirus COVID-19 Fire Protection Program Unidentified leakage |
IR 05000259/2020010 | 19 June 2020 | Triennial Inspection of Evaluation of Changes, Test and Experiments Baseline Inspection Report 0500259/2020010 and 05000260/2020010 and 05000296/2020010 | Weak link |
IR 05000259/2020001 | 7 May 2020 | Integrated Inspection Report 05000259/2020001, 05000260/2020001, and 05000296/2020001 | Unanalyzed Condition High Radiation Area Half scram Past operability Enforcement Discretion Nondestructive Examination Temporary Modification Functionality Assessment Operability Determination Coronavirus COVID-19 Fire Protection Program Coast down |