IR 05000456/2023004 | 2 February 2024 | Integrated Inspection Report 05000456/2023004 and 05000457/2023004 | |
ML24025C724 | 29 January 2024 | Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000456/2024002; 05000457/2024002 | Boric Acid Non-Destructive Examination Aging Management Foreign Material Exclusion Scaffolding |
IR 05000457/2023011 | 25 January 2024 | 2B Auxiliary Feedwater Pump Diesel Fuel Oil Dilution Report 05000457/2023011 and Preliminary Greater than Green Finding and Apparent Violation | |
IR 05000456/2020023 | 15 December 2023 | Baseline Security Inspection Document; 05000456/2023/402; 05000457/2023/402 | Safeguards Contingency Plan |
ML23313A155 | 1 December 2023 | Review of the Fall 2022 Steam Generator Tube Inspection Report | |
IR 05000456/2023010 | 18 October 2023 | Functional Engineering Inspection Commercial Grade Dedication Report 05000456/2023010 and 05000457/2023010 | Commercial Grade Dedication |
IR 05000456/2023401 | 18 October 2023 | Security Baseline Inspection Report 05000456/2023401 and 05000457/2023401 | Fitness for Duty Safeguards Contingency Plan |
IR 05000456/2023005 | 30 August 2023 | Updated Inspection Plan for Braidwood Station Report 05000456/2023005 and 05000457/2023005 | |
IR 05000456/2023002 | 3 August 2023 | Integrated Inspection Report 05000456/2023002 and 05000457/2023002 | Boric Acid High Radiation Area Enforcement Discretion Nondestructive Examination Temporary Modification VT-2 Functionality Assessment FLEX Significance Determination Process Operability Determination Liquid penetrant Pressure Boundary Leakage Fire Protection Program Coast down Siren |
IR 05000456/2023001 | 8 May 2023 | Integrated Inspection Report 05000456/2023001 and 05000457/2023001 | Mission time Enforcement Discretion Temporary Modification VT-2 Functionality Assessment FLEX Significance Determination Process Operability Determination Through Wall Leak Fire Protection Program Power change Coast down Unidentified leakage |
IR 05000457/2021420 | 22 March 2023 | Reissued - Braidwood Generating Station, Unit 1 and 2, Security Inspection Report Cover Letter 05000456 and 05000457-2021420 | Affidavit |
IR 05000456/2022006 | 1 March 2023 | Annual Assessment Letter for Braidwood Station, Units 1 and 2 (Report 05000456/2022006 and 05000457/2022006) | Commercial Grade Dedication Exemption Request Coronavirus |
IR 05000456/2022004 | 26 January 2023 | Integrated Inspection Report 05000456/2022004 and 05000457/2022004 | Boric Acid High Radiation Area Internal Flooding Enforcement Discretion Nondestructive Examination Temporary Modification VT-2 Functionality Assessment Operability Determination Liquid penetrant Fire Protection Program Coast down Unidentified leakage |
ML22269A499 | 8 November 2022 | Review of the Fall 2021 Steam Generator Tube Inspection Report | Pandemic Coronavirus |
IR 05000456/2022003 | 25 October 2022 | Integrated Inspection Report 05000456/2022003 and 05000457/2022003 and Exercise of Enforcement Discretion | Packing leak Internal Flooding Enforcement Discretion Temporary Modification Functionality Assessment Process Control Program Operability Determination Severe Accident Management Guideline Fire Protection Program Coast down Unidentified leakage |
IR 05000456/2022420 | 24 October 2022 | Cover Letter Braidwood Station Units 1 and 2 Security Baseline Inspection Report 05000456/2022420 and 05000457/2022420 | Affidavit |
IR 05000456/2022403 | 23 August 2022 | Material Control and Accounting Program Inspection Report 05000456/2022403 and 05000457/2022403 | Affidavit |
IR 05000456/2022005 | 22 August 2022 | Updated Inspection Plan for Braidwood Station Units 1 and 2 (Report 05000456/2022005; 05000457/2022005) | Commercial Grade Dedication Operator Manual Action Open Phase Condition Exemption Request Coronavirus |
IR 05000456/2022002 | 26 July 2022 | Integrated Inspection Report 05000456/2022002; 05000457/2022002; and 07200073/2022001 | Reactor Vessel Water Level Hydrostatic Temporary Modification Functionality Assessment FLEX Operability Determination Spent Fuel Pool Instrumentation |
IR 05000456/2022011 | 20 July 2022 | Biennial Problem Identification and Resolution Inspection Report 05000456/2022011 and 05000457/2022011 | Stroke time FLEX |
IR 05000456/2022401 | 13 July 2022 | Security Baseline Inspection Report 05000456/2022401 and 05000457/2022401 | |
IR 05000456/2022402 | 30 June 2022 | Cyber Security Inspection Report 05000456/2022402 and 05000457/2022402 | Cyber Security Affidavit |
IR 05000456/2022010 | 22 June 2022 | Design Basis Assurance Inspection (Teams) Inspection Report 05000456/2022010 and 05000457/2022010 | Safe Shutdown Incorporated by reference Significance Determination Process Large early release frequency Coronavirus COVID-19 Backfit Weak link |
IR 05000456/2022001 | 3 May 2022 | Integrated Inspection Report 05000456/2022001 and 05000457/2022001 | Boric Acid Packing leak Functionality Assessment Significance Determination Process Operability Determination Fire Protection Program Power change |
IR 05000456/2022301 | 6 April 2022 | NRC Initial License Examination Report 05000456/2022301 and 05000457/2022301 | Job Performance Measure |
IR 05000456/2022501 | 21 March 2022 | Emergency Preparedness Biennial Exercise Inspection Report 05000456/2022501 and 05000457/2022501 | Earthquake |
IR 05000456/2021006 | 2 March 2022 | Annual Assessment Letter for Braidwood Station, Units 1 and 2 (Report 05000456/2021006 and 05000457/2021006) | Commercial Grade Dedication Exemption Request Coronavirus |
IR 05000456/2021004 | 28 January 2022 | Integrated Inspection Report 05000456/2021004 and 05000457/2021004 | Safe Shutdown Boric Acid High Radiation Area Weld Overlay Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Nondestructive Examination Temporary Modification VT-2 Functionality Assessment FLEX Significance Determination Process Operability Determination Spent Fuel Pool Instrumentation Liquid penetrant Fire Protection Program Dissimilar Metal Weld Coast down |
IR 05000456/2021003 | 26 October 2021 | Integrated Inspection Report 05000456/2021003 and 05000457/2021003 | Safe Shutdown Boric Acid Internal Flooding Probabilistic Risk Assessment Functionality Assessment Operability Determination Coronavirus COVID-19 Fire Protection Program Coast down |
IR 05000456/2021402 | 16 September 2021 | Security Baseline Inspection Report 05000456/2021402 and 05000457/2021402 | Coronavirus COVID-19 |
IR 05000456/2021005 | 1 September 2021 | Updated Inspection Plan for Braidwood Station, Units 1 and 2 (Report 05000456/2021005 and 05000457/2021005) | Operator Manual Action Cyber Security Open Phase Condition Exemption Request Coronavirus |
IR 05000456/2021002 | 22 July 2021 | Integrated Inspection Report 05000456/2021002 and 05000457/2021002 | Boric Acid Packing leak Enforcement Discretion Nondestructive Examination Temporary Modification VT-2 Arc flash Functionality Assessment Operability Determination Coronavirus COVID-19 Liquid penetrant Fire Protection Program Coast down |
IR 05000456/2021010 | 19 July 2021 | Triennial Fire Protection Inspection Report 05000456/2021010 and 05000457/2021010 | Safe Shutdown Coronavirus COVID-19 Fire Protection Program |
IR 05000456/2021401 | 20 May 2021 | Security Baseline Inspection Report 05000456/2021401 and 05000457/2021401 | Coronavirus COVID-19 |
IR 05000456/2021001 | 16 April 2021 | Integrated Inspection Report 05000456/2021001 and 05000457/2021001 | Boric Acid Enforcement Discretion Probabilistic Risk Assessment Temporary Modification Functionality Assessment Significance Determination Process Operability Determination Coronavirus COVID-19 Fire Protection Program Power change Coast down Siren |
IR 05000456/2020006 | 4 March 2021 | Annual Assessment Letter for Braidwood Station (Report 05000456/2020006 and 05000457/2020006) | Operator Manual Action Open Phase Condition Exemption Request Coronavirus |
IR 05000456/2020004 | 26 January 2021 | Integrated Inspection Report 05000456/2020004; 05000457/2020004; and 07200073/2020001 | Ultimate heat sink Time to boil Enforcement Discretion Functionality Assessment FLEX Significance Determination Process Operability Determination Coronavirus COVID-19 Fire Protection Program |
IR 05000456/2020012 | 18 November 2020 | Design Basis Assurance Inspection (Programs) Inspection Report 05000456/2020012 and 05000457/2020012 | Power-Operated Valves Power Operated Valves Coronavirus COVID-19 |
IR 05000456/2020003 | 10 November 2020 | Integrated Inspection Report 05000456/2020003 and 05000457/2020003 | Ultimate heat sink Offsite Dose Calculation Manual Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Functionality Assessment Significance Determination Process Operability Determination Coronavirus COVID-19 Fire Protection Program |
IR 05000456/2020402 | 2 October 2020 | Security Baseline Inspection Report 05000456/2020402 and 05000457/2020402 | Coronavirus COVID-19 |
IR 05000456/2020005 | 1 September 2020 | Updated Inspection Plan for Braidwood Station Units 1 and 2 (Report 05000456/2020005 and 05000457/2020005) | Cyber Security Exemption Request Power-Operated Valves COVID-19 |
IR 05000456/2020301 | 27 August 2020 | NRC Initial License Examination Report 05000456/2020301 and 05000457/2020301 | Job Performance Measure |
ML20238B869 | 25 August 2020 | Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information; Inspection Report 05000456/2020004; 05000457/2020004 | Ultimate heat sink Temporary Modification Aging Management Flow Induced Vibration |
IR 05000456/2020002 | 28 July 2020 | Integrated Inspection Report 05000456/2020002 and 05000457/2020002 | Boric Acid Shutdown Margin Enforcement Discretion Nondestructive Examination Temporary Modification VT-2 Functionality Assessment Foreign Material Exclusion Operability Determination Coronavirus COVID-19 Fire Protection Program Backfit Coast down |
IR 05000456/2020001 | 21 April 2020 | Integrated Inspection Report 05000456/2020001 and 05000457/2020001 | Internal Flooding Enforcement Discretion Coatings VT-2 Functionality Assessment Operability Determination Code Reconciliation Coronavirus COVID-19 Fire Protection Program Power change |
IR 05000456/2020501 | 8 April 2020 | Emergency Preparedness Inspection Report 05000456/2020501 and 05000457/2020501 | |
IR 05000456/2020401 | 31 March 2020 | Security Baseline Inspection Report 05000456/2020401 and 05000457/2020401 | Fitness for Duty |
IR 05000456/2020010 | 25 March 2020 | Biennial Problem Identification and Resolution Inspection Report 05000456/2020010 and 05000457/2020010 | Ultimate heat sink Enforcement Discretion Aging Management Foreign Material Exclusion |
IR 05000456/2019006 | 3 March 2020 | Annual Assessment Letter for Braidwood Station, Units 1 and 2 (Report 05000456/2019006 and 05000457/2019006) | |
ML20056F297 | 25 February 2020 | Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000457/2020002 | Boric Acid Nondestructive Examination Aging Management Foreign Material Exclusion Scaffolding |