IR 05000334/20230114 December 2023Age-Related Degradation Inspection Report 05000334/2023011 and 05000412/2023011Probabilistic Risk Assessment
Aging Management
Significance Determination Process
License Renewal
Maintenance Rule Program
IR 05000334/202330127 November 2023Initial Operator Licensing Examination Report 05000334/2023301
IR 05000334/20230036 November 2023Integrated Inspection Report 05000334/2023003 and 05000412/2023003Functionality Assessment
FLEX
Operability Determination
Through Wall Leak
Fire Protection Program
Grace period
Downpower
IR 05000334/202340229 September 2023Security Baseline Inspection Report 05000334/2023402 and 05000412/2023402 (Cover Letter Only)Affidavit
IR 05000334/202340121 September 2023Cybersecurity Inspection Report 05000334/2023401 and 05000412/2023401 (Cover Letter Only)Affidavit
ML23243A92719 September 2023Review of the Fall 2022 Steam Generator Tube Inspection Report
IR 05000334/202300531 August 2023Updated Inspection Plan for Beaver Valley Power Station Units 1 and 2 (Report 05000334/2023005 and 05000412/2023005)Cyber Security
License Renewal
IR 05000334/20230029 August 2023Integrated Inspection Report 05000334/2023002 and 05000412/2023002Boric Acid
High Radiation Area
Past operability
Nondestructive Examination
Temporary Modification
Functionality Assessment
Locked High Radiation Area
Operability Determination
Liquid penetrant
Fire Protection Program
ML23157A1077 June 2023Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000334/2023011 and 05000412/2023011Probabilistic Risk Assessment
Aging Management
Operability Determination
IR 05000334/20230018 May 2023Integrated Inspection Report 05000334/2023001 and 05000412/2023001Boric Acid
Past operability
Enforcement Discretion
Temporary Modification
Functionality Assessment
Condition Adverse to Quality
Significance Determination Process
Operability Determination
Fire Protection Program
Power change
L-23-058, 180-Day Steam Generator Tube Inspection Report27 March 2023180-Day Steam Generator Tube Inspection ReportCoatings
Nondestructive Examination
IR 05000334/20230108 March 2023Biennial Problem Identification and Resolution Inspection Report 05000334/2023010 05000412/2023010Stroke time
IR 05000334/20220061 March 2023Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2022006 and 05000412/2022006)Commercial Grade Dedication
Cyber Security
License Renewal
Exemption Request
COVID-19
IR 05000334/20220049 February 2023Integrated Inspection Report 05000334/2022004 and 05000412/2022004Boric Acid
High Radiation Area
Anchor Darling
Nondestructive Examination
Temporary Modification
Functionality Assessment
Locked High Radiation Area
Operability Determination
Liquid penetrant
Fire Protection Program
IR 05000334/20224019 January 2023Security Baseline Inspection Report 05000334/2022401 and 05000412/2022401 (Cover Letter Only)Affidavit
ML22314A26816 December 2022Review of the Fall 2021 2R22 Steam Generator Tube Inspection 180 Day Report
IR 05000334/202200310 November 2022Integrated Inspection Report 05000334/2022003 and 05000412/2022003 and Independent Spent Fuel Storage Installation Inspection Report 07201043/2022001Mission time
Internal Flooding
Enforcement Discretion
Temporary Modification
Zebra Mussel
Functionality Assessment
FLEX
Aging Management
Significance Determination Process
Tornado Missile Protection
Operability Determination
Control of Heavy Loads
Continuous fire watch
Fire Protection Program
IR 05000334/202200531 August 2022Updated Inspection Plan for Beaver Valley Power Station, Units 1 and 2 (Report 05000334/2022005 and 05000412/2022005)Fitness for Duty
Commercial Grade Dedication
Cyber Security
Exemption Request
Coronavirus
IR 05000334/202200212 August 2022Integrated Inspection Report 05000334/2022002 and 05000412/2022002High Radiation Area
Ultimate heat sink
Stroke time
Internal Flooding
Temporary Modification
Cyber Security
Zebra Mussel
Functionality Assessment
FLEX
Operability Determination
Fire Protection Program
IR 05000334/202240212 August 2022Cyber Security Problem Identification and Resolution Inspection Report 05000334/2022402 and 05000412/2022402 (Cover Letter Only)Cyber Security
Affidavit
IR 05000334/202201129 June 2022Temporary Instruction 2515/194 Inspection Report 05000334/2022011 and 05000412/2022011Probabilistic Risk Assessment
Operator Manual Action
Open Phase Condition
IR 05000334/202250129 June 2022Emergency Preparedness Biennial Exercise Inspection Report 05000334/2022501 and 05000412/2022501Fuel cladding
IR 05000412/202230114 June 2022Initial Operator Licensing Examination Report 05000412/2022301
IR 05000334/202201012 May 2022Design Basis Assurance Inspection (Programs) Inspection Report 05000334/2022010 and 05000412/2022010Cyber Security
Maintenance Rule Program
Power-Operated Valves
Fire Protection Program
IR 05000334/202242011 May 2022Security Baseline Inspection Report 05000334/2022420 and 05000412/2022420 - Cover LetterAffidavit
IR 05000334/202200110 May 2022Integrated Inspection Report 05000334/2022001 and 05000412/2022001Internal Flooding
Enforcement Discretion
VT-2
Functionality Assessment
Significance Determination Process
Surveillance Frequency Control Program
Operability Determination
Fire Protection Program
Power change
IR 05000334/20210062 March 2022Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2021006 and 05000412/2021006)Fitness for Duty
Cyber Security
Open Phase Condition
Exemption Request
Power-Operated Valves
Power Operated Valves
COVID-19
IR 05000334/202100414 February 2022Integrated Inspection Report 05000334/2021004 and 05000412/2021004Boric Acid
High Radiation Area
Weld Overlay
Internal Flooding
Enforcement Discretion
Nondestructive Examination
Functionality Assessment
FLEX
Significance Determination Process
Operability Determination
Maintenance Rule Program
Liquid penetrant
Fire Protection Program
Substantial potential for overexposure
Substantial potential for an overexposure
Coast down
Overexposure
L-22-054, Steam Generator Inspection Report- Fall 2021 Refueling Outage10 February 2022Steam Generator Inspection Report- Fall 2021 Refueling OutageNondestructive Examination
IR 05000334/20210039 November 2021Integrated Inspection Report 05000334/2021003 and 05000412/2021003Boric Acid
Packing leak
High Radiation Area
Internal Flooding
Past operability
Enforcement Discretion
Anchor Darling
Functionality Assessment
Locked High Radiation Area
Significance Determination Process
Operability Determination
Coronavirus
COVID-19
Fire Protection Program
Scaffolding
Coast down
IR 05000334/202101119 October 2021Temporary Instruction 2515/194 Inspection Report 05000334/2021011 and 05000412/2021011Probabilistic Risk Assessment
Operator Manual Action
Open Phase Condition
Coronavirus
IR 05000334/202101029 September 2021Triennial Fire Protection Inspection Report 05000334/2021010 and 05000412/2021010Safe Shutdown
Fire Barrier
Coronavirus
Fire Protection Program
Early Warning Fire Detection
IR 05000334/20210051 September 2021Updated Inspection Plan for the Beaver Valley Power Station, Units 1 and 2 (Report 05000334/2021005 and 05000412/2021005)Fitness for Duty
Operator Manual Action
Cyber Security
Open Phase Condition
Exemption Request
Power-Operated Valves
COVID-19
IR 05000334/202140218 August 2021Security Baseline Inspection Report 05000334/2021402 and 05000412/2021402Coronavirus
COVID-19
IR 05000334/202140112 August 2021Material Control and Accounting Program Inspection Report 05000334/2021401 and 05000412/2021401 (Cover Letter Only)Affidavit
IR 05000334/202100211 August 2021Integrated Inspection Report 05000334/2021002 and 05000412/2021002Boric Acid
High Radiation Area
Internal Flooding
Nondestructive Examination
Temporary Modification
Zebra Mussel
Functionality Assessment
Locked High Radiation Area
FLEX
Operability Determination
Coronavirus
COVID-19
Fire Protection Program
Fire Watch
Scaffolding
Coast down
Siren
IR 05000334/202100113 May 2021Integrated Inspection Report 05000334/2021001 and 05000412/2021001Time of Discovery
Enforcement Discretion
Temporary Modification
Cyber Security
Functionality Assessment
Significance Determination Process
Foreign Material Exclusion
Operability Determination
Coronavirus
COVID-19
Fuel cladding
Fire Protection Program
Power change
Coast down
IR 05000334/202140313 May 2021Cyber Security Problem Identification and Resolution Inspection Report 05000334/2021403 and 05000412/2021403 (Cover Letter Only)Cyber Security
Affidavit
ML21097A11419 April 2021Review of Steam Generator Tube Inspection Report for the Spring 2020 Refueling Outage
IR 05000334/20213011 April 2021Initial Operator Licensing Examination Report 05000334/2021301
IR 05000334/202101224 March 2021Biennial Problem Identification and Resolution Inspection Report 05000334/2021012 and 05000412/2021012Boric Acid
Offsite Dose Calculation Manual
Temporary Modification
Aging Management
Coronavirus
COVID-19
IR 05000334/20210134 March 2021Nuclear Regulatory Commission Investigation Report No. 1-2019-010 and Inspection Report 05000334/2021013 and 05000412/2021013
IR 05000334/20200063 March 2021Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2020006 and 05000412/2020006)Fitness for Duty
Cyber Security
Open Phase Condition
Exemption Request
Power-Operated Valves
COVID-19
IR 05000334/202000412 February 2021Integrated Inspection Report 05000334/2020004 and 05000412/2020004Safe Shutdown
Time of Discovery
Mission time
Offsite Dose Calculation Manual
Fire Barrier
Internal Flooding
Past operability
Enforcement Discretion
Functionality Assessment
Locked High Radiation Area
Aging Management
Significance Determination Process
Large early release frequency
Operability Determination
Maintenance Rule Program
Coronavirus
COVID-19
Fire Protection Program
Unidentified leak
IR 05000334/202050123 November 2020Emergency Preparedness Biennial Exercise Inspection Report 05000334/2020501 and 05000412/2020501Pandemic
Coronavirus
COVID-19
IR 05000334/202000313 November 2020Integrated Inspection Report 05000334/2020003 and 05000412/2020003High Radiation Area
Enforcement Discretion
Met Tower
Functionality Assessment
FLEX
Operability Determination
Coronavirus
COVID-19
Fire Protection Program
Siren
IR 05000334/202001126 October 2020Design Basis Assurance Inspection (Teams) Inspection Report 05000334/2020011 and 05000412/2020011Large early release frequency
Time Critical Operator Action
Coronavirus
COVID-19
IR 05000334/20204015 October 2020Security Baseline Inspection Report 05000334/2020401 and 05000412/2020401 (Cover Letter Only)Affidavit
IR 05000334/202000531 August 2020Updated Inspection Plan (Inspection Report 05000334/2020005 and 05000412/2020005)Operator Manual Action
Open Phase Condition
Exemption Request
Power-Operated Valves
COVID-19
IR 05000334/202000213 August 2020Integrated Inspection Report 05000334/2020002 and 05000412/2020002Boric Acid
Weld Overlay
Enforcement Discretion
Nondestructive Examination
Temporary Modification
Functionality Assessment
Condition Adverse to Quality
Missed surveillance
Operability Determination
Maintenance Rule Program
Coronavirus
COVID-19
Fuel cladding
Through Wall Leak
Fire Protection Program
Scaffolding