IR 05000334/2023011 | 4 December 2023 | Age-Related Degradation Inspection Report 05000334/2023011 and 05000412/2023011 | Probabilistic Risk Assessment Aging Management Significance Determination Process License Renewal Maintenance Rule Program |
IR 05000334/2023301 | 27 November 2023 | Initial Operator Licensing Examination Report 05000334/2023301 | |
IR 05000334/2023003 | 6 November 2023 | Integrated Inspection Report 05000334/2023003 and 05000412/2023003 | Functionality Assessment FLEX Operability Determination Through Wall Leak Fire Protection Program Grace period Downpower |
IR 05000334/2023402 | 29 September 2023 | Security Baseline Inspection Report 05000334/2023402 and 05000412/2023402 (Cover Letter Only) | Affidavit |
IR 05000334/2023401 | 21 September 2023 | Cybersecurity Inspection Report 05000334/2023401 and 05000412/2023401 (Cover Letter Only) | Affidavit |
ML23243A927 | 19 September 2023 | Review of the Fall 2022 Steam Generator Tube Inspection Report | |
IR 05000334/2023005 | 31 August 2023 | Updated Inspection Plan for Beaver Valley Power Station Units 1 and 2 (Report 05000334/2023005 and 05000412/2023005) | Cyber Security License Renewal |
IR 05000334/2023002 | 9 August 2023 | Integrated Inspection Report 05000334/2023002 and 05000412/2023002 | Boric Acid High Radiation Area Past operability Nondestructive Examination Temporary Modification Functionality Assessment Locked High Radiation Area Operability Determination Liquid penetrant Fire Protection Program |
ML23157A107 | 7 June 2023 | Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000334/2023011 and 05000412/2023011 | Probabilistic Risk Assessment Aging Management Operability Determination |
IR 05000334/2023001 | 8 May 2023 | Integrated Inspection Report 05000334/2023001 and 05000412/2023001 | Boric Acid Past operability Enforcement Discretion Temporary Modification Functionality Assessment Condition Adverse to Quality Significance Determination Process Operability Determination Fire Protection Program Power change |
L-23-058, 180-Day Steam Generator Tube Inspection Report | 27 March 2023 | 180-Day Steam Generator Tube Inspection Report | Coatings Nondestructive Examination |
IR 05000334/2023010 | 8 March 2023 | Biennial Problem Identification and Resolution Inspection Report 05000334/2023010 05000412/2023010 | Stroke time |
IR 05000334/2022006 | 1 March 2023 | Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2022006 and 05000412/2022006) | Commercial Grade Dedication Cyber Security License Renewal Exemption Request COVID-19 |
IR 05000334/2022004 | 9 February 2023 | Integrated Inspection Report 05000334/2022004 and 05000412/2022004 | Boric Acid High Radiation Area Anchor Darling Nondestructive Examination Temporary Modification Functionality Assessment Locked High Radiation Area Operability Determination Liquid penetrant Fire Protection Program |
IR 05000334/2022401 | 9 January 2023 | Security Baseline Inspection Report 05000334/2022401 and 05000412/2022401 (Cover Letter Only) | Affidavit |
ML22314A268 | 16 December 2022 | Review of the Fall 2021 2R22 Steam Generator Tube Inspection 180 Day Report | |
IR 05000334/2022003 | 10 November 2022 | Integrated Inspection Report 05000334/2022003 and 05000412/2022003 and Independent Spent Fuel Storage Installation Inspection Report 07201043/2022001 | Mission time Internal Flooding Enforcement Discretion Temporary Modification Zebra Mussel Functionality Assessment FLEX Aging Management Significance Determination Process Tornado Missile Protection Operability Determination Control of Heavy Loads Continuous fire watch Fire Protection Program |
IR 05000334/2022005 | 31 August 2022 | Updated Inspection Plan for Beaver Valley Power Station, Units 1 and 2 (Report 05000334/2022005 and 05000412/2022005) | Fitness for Duty Commercial Grade Dedication Cyber Security Exemption Request Coronavirus |
IR 05000334/2022002 | 12 August 2022 | Integrated Inspection Report 05000334/2022002 and 05000412/2022002 | High Radiation Area Ultimate heat sink Stroke time Internal Flooding Temporary Modification Cyber Security Zebra Mussel Functionality Assessment FLEX Operability Determination Fire Protection Program |
IR 05000334/2022402 | 12 August 2022 | Cyber Security Problem Identification and Resolution Inspection Report 05000334/2022402 and 05000412/2022402 (Cover Letter Only) | Cyber Security Affidavit |
IR 05000334/2022011 | 29 June 2022 | Temporary Instruction 2515/194 Inspection Report 05000334/2022011 and 05000412/2022011 | Probabilistic Risk Assessment Operator Manual Action Open Phase Condition |
IR 05000334/2022501 | 29 June 2022 | Emergency Preparedness Biennial Exercise Inspection Report 05000334/2022501 and 05000412/2022501 | Fuel cladding |
IR 05000412/2022301 | 14 June 2022 | Initial Operator Licensing Examination Report 05000412/2022301 | |
IR 05000334/2022010 | 12 May 2022 | Design Basis Assurance Inspection (Programs) Inspection Report 05000334/2022010 and 05000412/2022010 | Cyber Security Maintenance Rule Program Power-Operated Valves Fire Protection Program |
IR 05000334/2022420 | 11 May 2022 | Security Baseline Inspection Report 05000334/2022420 and 05000412/2022420 - Cover Letter | Affidavit |
IR 05000334/2022001 | 10 May 2022 | Integrated Inspection Report 05000334/2022001 and 05000412/2022001 | Internal Flooding Enforcement Discretion VT-2 Functionality Assessment Significance Determination Process Surveillance Frequency Control Program Operability Determination Fire Protection Program Power change |
IR 05000334/2021006 | 2 March 2022 | Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2021006 and 05000412/2021006) | Fitness for Duty Cyber Security Open Phase Condition Exemption Request Power-Operated Valves Power Operated Valves COVID-19 |
IR 05000334/2021004 | 14 February 2022 | Integrated Inspection Report 05000334/2021004 and 05000412/2021004 | Boric Acid High Radiation Area Weld Overlay Internal Flooding Enforcement Discretion Nondestructive Examination Functionality Assessment FLEX Significance Determination Process Operability Determination Maintenance Rule Program Liquid penetrant Fire Protection Program Substantial potential for overexposure Substantial potential for an overexposure Coast down Overexposure |
L-22-054, Steam Generator Inspection Report- Fall 2021 Refueling Outage | 10 February 2022 | Steam Generator Inspection Report- Fall 2021 Refueling Outage | Nondestructive Examination |
IR 05000334/2021003 | 9 November 2021 | Integrated Inspection Report 05000334/2021003 and 05000412/2021003 | Boric Acid Packing leak High Radiation Area Internal Flooding Past operability Enforcement Discretion Anchor Darling Functionality Assessment Locked High Radiation Area Significance Determination Process Operability Determination Coronavirus COVID-19 Fire Protection Program Scaffolding Coast down |
IR 05000334/2021011 | 19 October 2021 | Temporary Instruction 2515/194 Inspection Report 05000334/2021011 and 05000412/2021011 | Probabilistic Risk Assessment Operator Manual Action Open Phase Condition Coronavirus |
IR 05000334/2021010 | 29 September 2021 | Triennial Fire Protection Inspection Report 05000334/2021010 and 05000412/2021010 | Safe Shutdown Fire Barrier Coronavirus Fire Protection Program Early Warning Fire Detection |
IR 05000334/2021005 | 1 September 2021 | Updated Inspection Plan for the Beaver Valley Power Station, Units 1 and 2 (Report 05000334/2021005 and 05000412/2021005) | Fitness for Duty Operator Manual Action Cyber Security Open Phase Condition Exemption Request Power-Operated Valves COVID-19 |
IR 05000334/2021402 | 18 August 2021 | Security Baseline Inspection Report 05000334/2021402 and 05000412/2021402 | Coronavirus COVID-19 |
IR 05000334/2021401 | 12 August 2021 | Material Control and Accounting Program Inspection Report 05000334/2021401 and 05000412/2021401 (Cover Letter Only) | Affidavit |
IR 05000334/2021002 | 11 August 2021 | Integrated Inspection Report 05000334/2021002 and 05000412/2021002 | Boric Acid High Radiation Area Internal Flooding Nondestructive Examination Temporary Modification Zebra Mussel Functionality Assessment Locked High Radiation Area FLEX Operability Determination Coronavirus COVID-19 Fire Protection Program Fire Watch Scaffolding Coast down Siren |
IR 05000334/2021001 | 13 May 2021 | Integrated Inspection Report 05000334/2021001 and 05000412/2021001 | Time of Discovery Enforcement Discretion Temporary Modification Cyber Security Functionality Assessment Significance Determination Process Foreign Material Exclusion Operability Determination Coronavirus COVID-19 Fuel cladding Fire Protection Program Power change Coast down |
IR 05000334/2021403 | 13 May 2021 | Cyber Security Problem Identification and Resolution Inspection Report 05000334/2021403 and 05000412/2021403 (Cover Letter Only) | Cyber Security Affidavit |
ML21097A114 | 19 April 2021 | Review of Steam Generator Tube Inspection Report for the Spring 2020 Refueling Outage | |
IR 05000334/2021301 | 1 April 2021 | Initial Operator Licensing Examination Report 05000334/2021301 | |
IR 05000334/2021012 | 24 March 2021 | Biennial Problem Identification and Resolution Inspection Report 05000334/2021012 and 05000412/2021012 | Boric Acid Offsite Dose Calculation Manual Temporary Modification Aging Management Coronavirus COVID-19 |
IR 05000334/2021013 | 4 March 2021 | Nuclear Regulatory Commission Investigation Report No. 1-2019-010 and Inspection Report 05000334/2021013 and 05000412/2021013 | |
IR 05000334/2020006 | 3 March 2021 | Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2020006 and 05000412/2020006) | Fitness for Duty Cyber Security Open Phase Condition Exemption Request Power-Operated Valves COVID-19 |
IR 05000334/2020004 | 12 February 2021 | Integrated Inspection Report 05000334/2020004 and 05000412/2020004 | Safe Shutdown Time of Discovery Mission time Offsite Dose Calculation Manual Fire Barrier Internal Flooding Past operability Enforcement Discretion Functionality Assessment Locked High Radiation Area Aging Management Significance Determination Process Large early release frequency Operability Determination Maintenance Rule Program Coronavirus COVID-19 Fire Protection Program Unidentified leak |
IR 05000334/2020501 | 23 November 2020 | Emergency Preparedness Biennial Exercise Inspection Report 05000334/2020501 and 05000412/2020501 | Pandemic Coronavirus COVID-19 |
IR 05000334/2020003 | 13 November 2020 | Integrated Inspection Report 05000334/2020003 and 05000412/2020003 | High Radiation Area Enforcement Discretion Met Tower Functionality Assessment FLEX Operability Determination Coronavirus COVID-19 Fire Protection Program Siren |
IR 05000334/2020011 | 26 October 2020 | Design Basis Assurance Inspection (Teams) Inspection Report 05000334/2020011 and 05000412/2020011 | Large early release frequency Time Critical Operator Action Coronavirus COVID-19 |
IR 05000334/2020401 | 5 October 2020 | Security Baseline Inspection Report 05000334/2020401 and 05000412/2020401 (Cover Letter Only) | Affidavit |
IR 05000334/2020005 | 31 August 2020 | Updated Inspection Plan (Inspection Report 05000334/2020005 and 05000412/2020005) | Operator Manual Action Open Phase Condition Exemption Request Power-Operated Valves COVID-19 |
IR 05000334/2020002 | 13 August 2020 | Integrated Inspection Report 05000334/2020002 and 05000412/2020002 | Boric Acid Weld Overlay Enforcement Discretion Nondestructive Examination Temporary Modification Functionality Assessment Condition Adverse to Quality Missed surveillance Operability Determination Maintenance Rule Program Coronavirus COVID-19 Fuel cladding Through Wall Leak Fire Protection Program Scaffolding |