Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
IR 05000440/202300430 January 2024Integrated Inspection Report 05000440/2023004
IR 05000440/202340210 January 2024Cyber Security Inspection Report 05000440/2023402Cyber Security
Affidavit
IR 05000440/202301128 November 2023Biennial Problem Identification and Resolution Inspection Report 05000440/2023011Cyber Security
Maintenance Rule Program
Unidentified leakage
Unidentified leak
IR 05000440/202340327 November 2023Security Baseline Inspection Report 05000440/2023403
IR 05000440/202300311 October 2023Integrated Inspection Report 05000440/2023003Enforcement Discretion
Functionality Assessment
Significance Determination Process
Operability Determination
Annual Radiological Effluent Release Report
Severe Accident Management Guideline
Fuel cladding
Fire Protection Program
Siren
IR 05000440/202340128 August 2023Public - Perry Nuclear Power Plant Security Baseline Inspection Report 05000440/2023401Affidavit
IR 05000440/202300524 August 2023Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2023005)License Renewal
IR 05000440/20230022 August 2023Integrated Inspection Report 05000440/2023002Unanalyzed Condition
Time of Discovery
Packing leak
Offsite Dose Calculation Manual
Enforcement Discretion
Probabilistic Risk Assessment
Temporary Modification
Functionality Assessment
Significance Determination Process
Operability Determination
IR 05000440/202301029 June 2023Comprehensive Engineering Team Inspection Report 05000440/2023010Safe Shutdown
Unanalyzed Condition
Time of Discovery
Mission time
Past operability
Zebra Mussel
FLEX
Significance Determination Process
Operability Determination
Time Critical Operator Action
License Renewal
Power Uprate
IR 05000440/20230014 May 2023Integrated Inspection Report (05000440/2023001)High winds
High Radiation Area
Stroke time
Past operability
Enforcement Discretion
Probabilistic Risk Assessment
Nondestructive Examination
Temporary Modification
Functionality Assessment
FLEX
Significance Determination Process
Scram Discharge Volume
Operability Determination
Offsite Circuit
Fire Protection Program
Power change
IR 05000440/20220061 March 2023Annual Assessment Letter for Perry Nuclear Power Plant, Unit 1 (Report 05000440/2022006)Commercial Grade Dedication
Exemption Request
Coronavirus
IR 05000440/202240613 February 2023Material Control and Accounting Program Inspection Report 05000440/2022406Affidavit
IR 05000440/202200410 February 2023Integrated Inspection Report 05000440/2022004; and 07200069/2022001 and Exercise of Enforcement DiscretionUnanalyzed Condition
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Enforcement Discretion
Temporary Modification
Functionality Assessment
FLEX
Significance Determination Process
Operability Determination
Severe Accident Management Guideline
Time Critical Operator Action
Earthquake
Maintenance Rule Program
Fire Protection Program
Power change
Unidentified leakage
IR 05000440/202230124 January 202305000440/2022301Job Performance Measure
IR 05000440/202240520 December 2022Security Baseline Inspection Report 05000440/2022405 (Cover Letter Only)Affidavit
IR 05000440/20220038 November 2022Integrated Inspection Report 05000440/2022003Temporary Modification
Functionality Assessment
Operability Determination
Fire Protection Program
Power change
Unidentified leakage
IR 05000440/202250117 October 2022Emergency Preparedness Biennial Exercise Inspection Report 05000440/2022501
IR 05000440/202201029 September 2022Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000440/2022010Fire Barrier
Functionality Assessment
IR 05000440/202200526 August 2022Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2022005)Commercial Grade Dedication
Exemption Request
Coronavirus
IR 05000440/20220028 August 2022Integrated Inspection Report 05000440/2022002High winds
High Radiation Area
Ultimate heat sink
Offsite Dose Calculation Manual
Temporary Modification
Zebra Mussel
Functionality Assessment
Operability Determination
Fire Protection Program
Scaffolding
Substantial potential for an overexposure
Overexposure
IR 05000440/20224204 August 2022Security Baseline Inspection Report 05000440/2022420 - Cover LetterAffidavit
IR 05000440/202240221 July 2022Security Baseline Inspection Report 05000440/2022402
IR 05000440/20224049 June 2022Security Baseline Inspection Report 05000440/2022404
IR 05000440/202200112 May 2022Integrated Inspection Report 05000440/2022001Ultimate heat sink
Internal Flooding
Fire impairment
Functionality Assessment
Operability Determination
Fire Protection Program
Power change
IR 05000440/20210062 March 2022Annual Assessment Letter for Perry Nuclear Power Plant, Unit 1 (Report 05000440/2021006)Exemption Request
Coronavirus
IR 05000440/202240117 February 2022Security Baseline Inspection Report 05000440/2022401Fitness for Duty
Coronavirus
COVID-19
IR 05000440/202100411 February 2022Integrated Inspection Report 05000440/2021004Hydrostatic
Functionality Assessment
Operability Determination
Liquid penetrant
Siren
IR 05000440/20224039 February 2022Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000440/2022403Cyber Security
IR 05000440/202101310 January 2022Biennial Problem Identification and Resolution Inspection Report 05000440/2021013Past operability
Siren
IR 05000440/20210101 December 2021Triennial Fire Protection Inspection Report 05000440/2021010Hot Short
Safe Shutdown
Fire Barrier
Multiple Spurious Operation
Coronavirus
COVID-19
Fire Protection Program
IR 05000440/202100312 November 2021Integrated Inspection Report 05000440/2021003Mission time
Enforcement Discretion
Temporary Modification
Functionality Assessment
Operability Determination
Coronavirus
COVID-19
Fire Protection Program
Downpower
IR 05000440/202140227 October 2021Security Baseline Inspection Report 05000440/2021402Coronavirus
COVID-19
IR 05000440/202101230 September 2021Design Basis Assurance Inspection (Programs) Inspection Report 05000440/2021012Safe Shutdown
Stroke time
Probabilistic Risk Assessment
Anchor Darling
Missed surveillance
Significance Determination Process
Operability Determination
Maintenance Rule Program
Power-Operated Valves
Power Operated Valves
Coronavirus
COVID-19
IR 05000440/20210051 September 2021Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2021005)Operator Manual Action
Cyber Security
Open Phase Condition
Exemption Request
Coronavirus
IR 05000440/202100212 August 2021Integrated Inspection Report 05000440/2021002Half scram
Stroke time
Internal Flooding
Temporary Modification
Functionality Assessment
FLEX
Foreign Material Exclusion
Operability Determination
Control of Heavy Loads
Coronavirus
COVID-19
Fire Protection Program
Power change
IR 05000440/202100110 June 2021NRC Inspection of Temporary Instruction 2515/194, Inspection of the Licensee'S Implementation of Industry Initiative Associated with the OPC Design Vulnerabilities in Electric Power Systems (NRC Bulletin 2012-01)-Inspection Report 0Probabilistic Risk Assessment
Open Phase Condition
Large early release frequency
ML21132A09512 May 2021Integrated Inspection Report 05000440/2021001High Radiation Area
Enforcement Discretion
Nondestructive Examination
Temporary Modification
VT-2
Functionality Assessment
Locked High Radiation Area
FLEX
Aging Management
Significance Determination Process
Process Control Program
Coronavirus
Liquid penetrant
Fire Protection Program
Dissimilar Metal Weld
Power change
IR 05000440/20213018 April 2021NRC Initial License Examination Report 05000440/2021301Job Performance Measure
IR 05000440/20200064 March 2021Annual Assessment Letter Perry Nuclear Power Plant (Report 05000440/2020006)Open Phase Condition
Exemption Request
Coronavirus
IR 05000440/202000412 February 2021Integrated Inspection Report 05000440/2020004Stroke time
Internal Flooding
Enforcement Discretion
Met Tower
Temporary Modification
Functionality Assessment
FLEX
Significance Determination Process
Job Performance Measure
Operability Determination
Time Critical Operator Action
Coronavirus
COVID-19
Fire Protection Program
Power change
IR 05000440/20200103 December 2020Design Basis Assurance Inspection (Teams) Inspection Report 05000440/2020010Mission time
Large early release frequency
Time Critical Operator Action
Coronavirus
IR 05000440/20204031 December 2020Security Baseline Inspection Report 05000440/2020403Coronavirus
COVID-19
IR 05000440/202000312 November 2020Integrated Inspection Report 05000440/2020003 and 07200069/2020001Offsite Dose Calculation Manual
Hydrostatic
Past operability
Fire impairment
Functionality Assessment
Operability Determination
Coronavirus
COVID-19
Downpower
IR 05000440/202050116 October 2020Emergency Preparedness Biennial Exercise Inspection Report 05000440/2020501Operating Basis Earthquake
IR 05000440/202040223 September 2020Security Baseline Inspection Report 05000440/2020402Coronavirus
COVID-19
IR 05000440/20200051 September 2020Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2020005)Cyber Security
Open Phase Condition
Exemption Request
Power-Operated Valves
COVID-19
IR 05000440/202000214 August 2020Integrated Inspection Report 05000440/2020002Unanalyzed Condition
High winds
Enforcement Discretion
Nondestructive Examination
Temporary Modification
VT-2
Functionality Assessment
Design basis earthquake
Operability Determination
Coronavirus
COVID-19
Fire Protection Program
Scaffolding
Unidentified leakage
IR 05000440/202000114 May 2020Integrated Inspection Report 05000440/2020001Enforcement Discretion
Temporary Modification
Functionality Assessment
Operability Determination
Coronavirus
Turbine Missile
COVID-19
Fire Protection Program
Power change
Downpower
IR 05000440/20204019 April 2020Security Baseline Inspection Report 05000440/2020401Fitness for Duty
IR 05000440/20190063 March 2020Annual Assessment Letter Perry Nuclear Power Plant (Report 05000440/2019006)Open Phase Condition