IR 05000220/2023004 | 1 February 2024 | Integrated Inspection Report 05000220/2023004 and 05000410/2023004 | Stroke time Functionality Assessment Missed surveillance Operability Determination Through Wall Leak Fire Protection Program Downpower |
IR 05000410/2024301 | 14 December 2023 | Initial Operator Licensing Examination Report 05000410/2024301 | |
IR 05000220/2023402 | 28 November 2023 | Security Baseline Inspection Report 05000220/2023402 and 05000410/2023402 | |
IR 05000220/2023420 | 1 November 2023 | Security Baseline Inspection Report 05000220/2023420 and 05000410/2023420 | |
IR 05000220/2023003 | 25 October 2023 | Integrated Inspection Report 05000220/2023003 and 05000410/2023003 | Internal Flooding Functionality Assessment FLEX Aging Management Operability Determination Fire Protection Program Power change Downpower |
IR 05000220/2023501 | 17 October 2023 | Emergency Preparedness Biennial Exercise Inspection Report 05000220/2023501 and 05000410/2023501 | |
IR 05000220/2023011 | 16 October 2023 | Comprehensive Engineering Team Inspection Report 05000220/2023011 and 05000410/2023011 | Fire Barrier Commercial Grade Dedication Internal Flooding Aging Management |
IR 05000220/2023303 | 20 September 2023 | Retake Operator Licensing Examination Report 05000220/2023303 | |
IR 05000220/2023005 | 31 August 2023 | Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2023005 and 05000410/2023005) | Fitness for Duty Cyber Security |
IR 05000220/2023401 | 8 August 2023 | Cyber Security Inspection Report 05000220/2023401 and 05000410/2023401 (Cover Letter Only) | Cyber Security Affidavit |
IR 05000220/2023002 | 1 August 2023 | Integrated Inspection Report 05000220/2023002 and 05000410/2023002 | Shutdown Margin Packing leak Stroke time Commercial Grade Dedication Temporary Modification Functionality Assessment Operability Determination Fire Protection Program Failure to Scram |
IR 05000220/2023010 | 29 June 2023 | Biennial Problem Identification and Resolution Inspection Report 05000220/2023010 and 05000410/2023010 | Packing leak Stroke time Condition Adverse to Quality |
IR 05000410/2023302 | 15 May 2023 | Initial Operator Licensing Examination Report 05000410/2023302 | |
IR 05000220/2023001 | 5 May 2023 | Integrated Inspection Report 05000220/2023001 and 05000410/2023001 | High Radiation Area Weld Overlay Enforcement Discretion Nondestructive Examination Temporary Modification Squib Functionality Assessment Operability Determination Moisture barrier Fire Protection Program Dissimilar Metal Weld DM weld Power change Downpower |
IR 05000220/2023301 | 29 March 2023 | Initial Operator Licensing Examination Report 05000220/2023301 | |
IR 05000220/2022006 | 1 March 2023 | Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2 (Reports 05000220/2022006 and 05000410/2022006) | Commercial Grade Dedication Cyber Security Exemption Request COVID-19 |
IR 05000220/2022004 | 23 January 2023 | Integrated Inspection Report 05000220/2022004 and 05000410/2022004 | Internal Flooding Enforcement Discretion Temporary Modification Functionality Assessment Operability Determination Fire Protection Program Downpower |
IR 05000220/2022010 | 22 November 2022 | Design Basis Assurance Inspection (Programs) Inspection Report 05000220/2022010 and 05000410/2022010 | Missed surveillance Power-Operated Valves |
IR 05000220/2022003 | 4 November 2022 | Integrated Inspection Report 05000220/2022003 and 05000410/2022003 | Half scram Commercial Grade Dedication Enforcement Discretion Functionality Assessment FLEX Operability Determination Earthquake Fire Protection Program Scaffolding Downpower |
IR 05000220/2022005 | 31 August 2022 | Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Reports 05000220/2022005 and 05000410/2022005) | Fitness for Duty Commercial Grade Dedication Cyber Security Exemption Request Power-Operated Valves Power Operated Valves COVID-19 COVID19 |
IR 05000220/2022401 | 30 August 2022 | Security Baseline Inspection Report 05000220/2022401 and 05000410/2022401 | Fitness for Duty |
IR 05000220/2022002 | 8 August 2022 | Integrated Inspection Report 05000220/2022002 and 05000410/2022002 and Independent Spent Fuel Storage Installation Report 07201036/2022001 | Reactor Vessel Water Level Ultimate heat sink Stroke time Internal Flooding Enforcement Discretion Functionality Assessment Condition Adverse to Quality Aging Management Tornado Generated Missile Significance Determination Process Scram Discharge Volume Operability Determination License Renewal Fire Protection Program Downpower Failure to Scram |
IR 05000220/2021004 | 19 May 2022 | Reissued Integrated Inspection Report 05000220/2021004 and 05000410/2021004 | High winds Reactor Vessel Water Level Half scram Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Temporary Modification Functionality Assessment Condition Adverse to Quality Missed surveillance Significance Determination Process Surveillance Frequency Control Program Operability Determination Fire Protection Program Downpower Failure to Scram |
IR 05000220/2022001 | 29 April 2022 | Integrated Inspection Report 05000220/2022001 and 05000410/2022001 | Shutdown Margin High Radiation Area Stroke time Internal Flooding Nondestructive Examination Temporary Modification Functionality Assessment Locked High Radiation Area Operability Determination Liquid penetrant Fire Protection Program Dissimilar Metal Weld Power change Downpower |
IR 05000220/2021006 | 2 March 2022 | Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2 (Reports 05000220/2021006 and 05000410/2021006) | Fitness for Duty Cyber Security Exemption Request Power-Operated Valves Power Operated Valves COVID-19 |
ML22026A350 | 26 January 2022 | Integrated Inspection Report 05000220/2021004 and 05000410/2021004 | High winds Reactor Vessel Water Level Half scram Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Temporary Modification Functionality Assessment Condition Adverse to Quality Missed surveillance Significance Determination Process Surveillance Frequency Control Program Fire Protection Program Downpower |
IR 05000220/2021012 | 10 January 2022 | Biennial Problem Identification and Resolution Inspection Report 05000220/2021012 and 05000410/2021012 | Finite Element Analysis Condition Adverse to Quality Significance Determination Process Fire Protection Program Scaffolding |
IR 05000220/2021003 | 9 November 2021 | Integrated Inspection Report 05000220/2021003 and 05000410/2021003 and Independent Spent Fuel Storage Installation Report 07201036/2021001 | Commercial Grade Dedication Internal Flooding Temporary Modification Functionality Assessment FLEX Operability Determination Severe Accident Management Guideline Coronavirus COVID-19 Fire Protection Program |
IR 05000220/2021501 | 14 October 2021 | Emergency Preparedness Biennial Exercise Inspection Report 05000220/2021501 and 05000410/2021501 | Coronavirus COVID-19 Fuel cladding |
IR 05000220/2021005 | 1 September 2021 | Updated Inspection Plan for the Nine Mile Point Nuclear Station, Units 1 and 2 (Reports 05000220/2021005 and 05000410/2021005) | Fitness for Duty Cyber Security Exemption Request Power-Operated Valves Power Operated Valves COVID-19 |
IR 05000220/2021401 | 1 September 2021 | Material Control and Accounting Program Inspection Report 05000220/2021401 and 05000410/2021401 (Letter Only) | Affidavit |
IR 05000220/2021010 | 24 August 2021 | Triennial Fire Protection Inspection Report 05000220/2021010 and 05000410/2021010 | Safe Shutdown Fire Barrier Probabilistic Risk Assessment Coronavirus Fire Protection Program |
IR 05000220/2021002 | 10 August 2021 | Integrated Inspection Report 05000220/2021002 and 05000410/2021002 and Independent Spent Fuel Storage Installation Report 07201036/2021002 | Reactor Vessel Water Level High Radiation Area Nondestructive Examination Temporary Modification Squib Functionality Assessment Incorporated by reference Locked High Radiation Area Aging Management Significance Determination Process Process Control Program Operability Determination Exemption Request Coronavirus COVID-19 EVT-1 Fire Protection Program Downpower |
IR 05000220/2021402 | 22 June 2021 | Security Baseline Inspection Report 05000220/2021402 and 05000410/2021402 | Coronavirus COVID-19 |
IR 05000410/2021302 | 12 May 2021 | Initial Operator Licensing Examination Report 05000410/2021302 | |
IR 05000220/2021001 | 5 May 2021 | Integrated Inspection Report 05000220/2021001 and 05000410/2021001 | Safe Shutdown Enforcement Discretion Probabilistic Risk Assessment Temporary Modification Functionality Assessment FLEX B.5.b Significance Determination Process Large early release frequency Operability Determination Spent Fuel Pool Instrumentation Coronavirus COVID-19 Fire Protection Program Fire Watch Hourly Fire Watch Power change Downpower Failure to Scram |
IR 05000220/2021011 | 4 May 2021 | Temporary Instruction 2515/194 Inspection Report 05000220/2021011 and 05000410/2021011 | Probabilistic Risk Assessment Reserve Station Service Transformer Operator Manual Action Open Phase Condition Large early release frequency |
IR 05000220/2020006 | 3 March 2021 | Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2020006 and 05000410/2020006) | Fitness for Duty Operator Manual Action Open Phase Condition Exemption Request Power-Operated Valves Power Operated Valves COVID-19 |
IR 05000220/2020004 | 11 February 2021 | Integrated Inspection Report 05000220/2020004 and 05000410/2020004 and Independent Spent Fuel Storage Installation Report 07201036/202004 | High winds High Radiation Area Stroke time Internal Flooding Hydrostatic Enforcement Discretion Functionality Assessment Locked High Radiation Area Scram Discharge Volume Operability Determination Coronavirus COVID-19 Fire Protection Program Power change Downpower Failure to Scram |
IR 05000220/2020301 | 25 January 2021 | Initial Operator Licensing Examination Report 05000220/2020301 | |
IR 05000220/2020420 | 9 December 2020 | Security Inspection Report 05000220/2020420 and 05000410/2020420 2020 Report | |
ML20343A011 | 9 December 2020 | Security Inspection Report Cover Letter 05000220/2020420 and 05000410/2020420 | |
IR 05000220/2020010 | 24 November 2020 | Design Basis Assurance Inspection (Teams) Inspection Report 05000220/2020010 and 05000410/2020010 | Large early release frequency Coronavirus |
IR 05000220/2020003 | 10 November 2020 | Integrated Inspection Report 05000220/2020003 and 05000410/2020003 | Shutdown Margin Non-Destructive Examination Stroke time Enforcement Discretion Temporary Modification Functionality Assessment FLEX Missed surveillance Significance Determination Process Foreign Material Exclusion Scram Discharge Volume Operability Determination Coronavirus COVID-19 Fuel cladding Liquid penetrant Fire Protection Program |
IR 05000220/2020005 | 31 August 2020 | Updated Inspection Plan for the Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2020005 and 05000410/2020005) | Operator Manual Action Open Phase Condition Exemption Request COVID-19 |
IR 05000220/2020401 | 29 July 2020 | Security Baseline Inspection Report 05000220/2020401 and 05000410/2020401 | Coronavirus COVID-19 |
ML20149K412 | 29 May 2020 | Request for Information for a Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000220/2020010 and 05000410/2020010 | Commercial Grade Dedication Probabilistic Risk Assessment Temporary Modification Aging Management |
IR 05000220/2020001 | 4 May 2020 | Integrated Inspection Report 05000220/2020001 and 05000410/2020001 and Independent Spent Fuel Storage Installation Inspection Report 07201036/2020001 | High Radiation Area Water Inventory Control Enforcement Discretion Nondestructive Examination Temporary Modification Functionality Assessment Locked High Radiation Area Condition Adverse to Quality Significance Determination Process Operability Determination Coronavirus COVID-19 Fire Protection Program Dissimilar Metal Weld Scaffolding Power change Failure to Scram |
IR 05000220/2019006 | 3 March 2020 | Annual Assessment Letter for the Nine Mile Point Nuclear Station, Units 1 and 2 (Reports 05000220/2019006 and 05000410/2019006) | Open Phase Condition |
IR 05000410/2019301 | 11 February 2020 | Initial Operator Licensing Examination Report 05000410/2019301 | |