Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
IR 05000220/20230041 February 2024Integrated Inspection Report 05000220/2023004 and 05000410/2023004Stroke time
Functionality Assessment
Missed surveillance
Operability Determination
Through Wall Leak
Fire Protection Program
Downpower
IR 05000410/202430114 December 2023Initial Operator Licensing Examination Report 05000410/2024301
IR 05000220/202340228 November 2023Security Baseline Inspection Report 05000220/2023402 and 05000410/2023402
IR 05000220/20234201 November 2023Security Baseline Inspection Report 05000220/2023420 and 05000410/2023420
IR 05000220/202300325 October 2023Integrated Inspection Report 05000220/2023003 and 05000410/2023003Internal Flooding
Functionality Assessment
FLEX
Aging Management
Operability Determination
Fire Protection Program
Power change
Downpower
IR 05000220/202350117 October 2023Emergency Preparedness Biennial Exercise Inspection Report 05000220/2023501 and 05000410/2023501
IR 05000220/202301116 October 2023Comprehensive Engineering Team Inspection Report 05000220/2023011 and 05000410/2023011Fire Barrier
Commercial Grade Dedication
Internal Flooding
Aging Management
IR 05000220/202330320 September 2023Retake Operator Licensing Examination Report 05000220/2023303
IR 05000220/202300531 August 2023Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2023005 and 05000410/2023005)Fitness for Duty
Cyber Security
IR 05000220/20234018 August 2023Cyber Security Inspection Report 05000220/2023401 and 05000410/2023401 (Cover Letter Only)Cyber Security
Affidavit
IR 05000220/20230021 August 2023Integrated Inspection Report 05000220/2023002 and 05000410/2023002Shutdown Margin
Packing leak
Stroke time
Commercial Grade Dedication
Temporary Modification
Functionality Assessment
Operability Determination
Fire Protection Program
Failure to Scram
IR 05000220/202301029 June 2023Biennial Problem Identification and Resolution Inspection Report 05000220/2023010 and 05000410/2023010Packing leak
Stroke time
Condition Adverse to Quality
IR 05000410/202330215 May 2023Initial Operator Licensing Examination Report 05000410/2023302
IR 05000220/20230015 May 2023Integrated Inspection Report 05000220/2023001 and 05000410/2023001High Radiation Area
Weld Overlay
Enforcement Discretion
Nondestructive Examination
Temporary Modification
Squib
Functionality Assessment
Operability Determination
Moisture barrier
Fire Protection Program
Dissimilar Metal Weld
DM weld
Power change
Downpower
IR 05000220/202330129 March 2023Initial Operator Licensing Examination Report 05000220/2023301
IR 05000220/20220061 March 2023Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2 (Reports 05000220/2022006 and 05000410/2022006)Commercial Grade Dedication
Cyber Security
Exemption Request
COVID-19
IR 05000220/202200423 January 2023Integrated Inspection Report 05000220/2022004 and 05000410/2022004Internal Flooding
Enforcement Discretion
Temporary Modification
Functionality Assessment
Operability Determination
Fire Protection Program
Downpower
IR 05000220/202201022 November 2022Design Basis Assurance Inspection (Programs) Inspection Report 05000220/2022010 and 05000410/2022010Missed surveillance
Power-Operated Valves
IR 05000220/20220034 November 2022Integrated Inspection Report 05000220/2022003 and 05000410/2022003Half scram
Commercial Grade Dedication
Enforcement Discretion
Functionality Assessment
FLEX
Operability Determination
Earthquake
Fire Protection Program
Scaffolding
Downpower
IR 05000220/202200531 August 2022Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Reports 05000220/2022005 and 05000410/2022005)Fitness for Duty
Commercial Grade Dedication
Cyber Security
Exemption Request
Power-Operated Valves
Power Operated Valves
COVID-19
COVID19
IR 05000220/202240130 August 2022Security Baseline Inspection Report 05000220/2022401 and 05000410/2022401Fitness for Duty
IR 05000220/20220028 August 2022Integrated Inspection Report 05000220/2022002 and 05000410/2022002 and Independent Spent Fuel Storage Installation Report 07201036/2022001Reactor Vessel Water Level
Ultimate heat sink
Stroke time
Internal Flooding
Enforcement Discretion
Functionality Assessment
Condition Adverse to Quality
Aging Management
Tornado Generated Missile
Significance Determination Process
Scram Discharge Volume
Operability Determination
License Renewal
Fire Protection Program
Downpower
Failure to Scram
IR 05000220/202100419 May 2022Reissued Integrated Inspection Report 05000220/2021004 and 05000410/2021004High winds
Reactor Vessel Water Level
Half scram
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Temporary Modification
Functionality Assessment
Condition Adverse to Quality
Missed surveillance
Significance Determination Process
Surveillance Frequency Control Program
Operability Determination
Fire Protection Program
Downpower
Failure to Scram
IR 05000220/202200129 April 2022Integrated Inspection Report 05000220/2022001 and 05000410/2022001Shutdown Margin
High Radiation Area
Stroke time
Internal Flooding
Nondestructive Examination
Temporary Modification
Functionality Assessment
Locked High Radiation Area
Operability Determination
Liquid penetrant
Fire Protection Program
Dissimilar Metal Weld
Power change
Downpower
IR 05000220/20210062 March 2022Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2 (Reports 05000220/2021006 and 05000410/2021006)Fitness for Duty
Cyber Security
Exemption Request
Power-Operated Valves
Power Operated Valves
COVID-19
ML22026A35026 January 2022Integrated Inspection Report 05000220/2021004 and 05000410/2021004High winds
Reactor Vessel Water Level
Half scram
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Temporary Modification
Functionality Assessment
Condition Adverse to Quality
Missed surveillance
Significance Determination Process
Surveillance Frequency Control Program
Fire Protection Program
Downpower
IR 05000220/202101210 January 2022Biennial Problem Identification and Resolution Inspection Report 05000220/2021012 and 05000410/2021012Finite Element Analysis
Condition Adverse to Quality
Significance Determination Process
Fire Protection Program
Scaffolding
IR 05000220/20210039 November 2021Integrated Inspection Report 05000220/2021003 and 05000410/2021003 and Independent Spent Fuel Storage Installation Report 07201036/2021001Commercial Grade Dedication
Internal Flooding
Temporary Modification
Functionality Assessment
FLEX
Operability Determination
Severe Accident Management Guideline
Coronavirus
COVID-19
Fire Protection Program
IR 05000220/202150114 October 2021Emergency Preparedness Biennial Exercise Inspection Report 05000220/2021501 and 05000410/2021501Coronavirus
COVID-19
Fuel cladding
IR 05000220/20210051 September 2021Updated Inspection Plan for the Nine Mile Point Nuclear Station, Units 1 and 2 (Reports 05000220/2021005 and 05000410/2021005)Fitness for Duty
Cyber Security
Exemption Request
Power-Operated Valves
Power Operated Valves
COVID-19
IR 05000220/20214011 September 2021Material Control and Accounting Program Inspection Report 05000220/2021401 and 05000410/2021401 (Letter Only)Affidavit
IR 05000220/202101024 August 2021Triennial Fire Protection Inspection Report 05000220/2021010 and 05000410/2021010Safe Shutdown
Fire Barrier
Probabilistic Risk Assessment
Coronavirus
Fire Protection Program
IR 05000220/202100210 August 2021Integrated Inspection Report 05000220/2021002 and 05000410/2021002 and Independent Spent Fuel Storage Installation Report 07201036/2021002Reactor Vessel Water Level
High Radiation Area
Nondestructive Examination
Temporary Modification
Squib
Functionality Assessment
Incorporated by reference
Locked High Radiation Area
Aging Management
Significance Determination Process
Process Control Program
Operability Determination
Exemption Request
Coronavirus
COVID-19
EVT-1
Fire Protection Program
Downpower
IR 05000220/202140222 June 2021Security Baseline Inspection Report 05000220/2021402 and 05000410/2021402Coronavirus
COVID-19
IR 05000410/202130212 May 2021Initial Operator Licensing Examination Report 05000410/2021302
IR 05000220/20210015 May 2021Integrated Inspection Report 05000220/2021001 and 05000410/2021001Safe Shutdown
Enforcement Discretion
Probabilistic Risk Assessment
Temporary Modification
Functionality Assessment
FLEX
B.5.b
Significance Determination Process
Large early release frequency
Operability Determination
Spent Fuel Pool Instrumentation
Coronavirus
COVID-19
Fire Protection Program
Fire Watch
Hourly Fire Watch
Power change
Downpower
Failure to Scram
IR 05000220/20210114 May 2021Temporary Instruction 2515/194 Inspection Report 05000220/2021011 and 05000410/2021011Probabilistic Risk Assessment
Reserve Station Service Transformer
Operator Manual Action
Open Phase Condition
Large early release frequency
IR 05000220/20200063 March 2021Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2020006 and 05000410/2020006)Fitness for Duty
Operator Manual Action
Open Phase Condition
Exemption Request
Power-Operated Valves
Power Operated Valves
COVID-19
IR 05000220/202000411 February 2021Integrated Inspection Report 05000220/2020004 and 05000410/2020004 and Independent Spent Fuel Storage Installation Report 07201036/202004High winds
High Radiation Area
Stroke time
Internal Flooding
Hydrostatic
Enforcement Discretion
Functionality Assessment
Locked High Radiation Area
Scram Discharge Volume
Operability Determination
Coronavirus
COVID-19
Fire Protection Program
Power change
Downpower
Failure to Scram
IR 05000220/202030125 January 2021Initial Operator Licensing Examination Report 05000220/2020301
IR 05000220/20204209 December 2020Security Inspection Report 05000220/2020420 and 05000410/2020420 2020 Report
ML20343A0119 December 2020Security Inspection Report Cover Letter 05000220/2020420 and 05000410/2020420
IR 05000220/202001024 November 2020Design Basis Assurance Inspection (Teams) Inspection Report 05000220/2020010 and 05000410/2020010Large early release frequency
Coronavirus
IR 05000220/202000310 November 2020Integrated Inspection Report 05000220/2020003 and 05000410/2020003Shutdown Margin
Non-Destructive Examination
Stroke time
Enforcement Discretion
Temporary Modification
Functionality Assessment
FLEX
Missed surveillance
Significance Determination Process
Foreign Material Exclusion
Scram Discharge Volume
Operability Determination
Coronavirus
COVID-19
Fuel cladding
Liquid penetrant
Fire Protection Program
IR 05000220/202000531 August 2020Updated Inspection Plan for the Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2020005 and 05000410/2020005)Operator Manual Action
Open Phase Condition
Exemption Request
COVID-19
IR 05000220/202040129 July 2020Security Baseline Inspection Report 05000220/2020401 and 05000410/2020401Coronavirus
COVID-19
ML20149K41229 May 2020Request for Information for a Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000220/2020010 and 05000410/2020010Commercial Grade Dedication
Probabilistic Risk Assessment
Temporary Modification
Aging Management
IR 05000220/20200014 May 2020Integrated Inspection Report 05000220/2020001 and 05000410/2020001 and Independent Spent Fuel Storage Installation Inspection Report 07201036/2020001High Radiation Area
Water Inventory Control
Enforcement Discretion
Nondestructive Examination
Temporary Modification
Functionality Assessment
Locked High Radiation Area
Condition Adverse to Quality
Significance Determination Process
Operability Determination
Coronavirus
COVID-19
Fire Protection Program
Dissimilar Metal Weld
Scaffolding
Power change
Failure to Scram
IR 05000220/20190063 March 2020Annual Assessment Letter for the Nine Mile Point Nuclear Station, Units 1 and 2 (Reports 05000220/2019006 and 05000410/2019006)Open Phase Condition
IR 05000410/201930111 February 2020Initial Operator Licensing Examination Report 05000410/2019301