Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
IR 05000333/20230047 February 2024Integrated Inspection Report 05000333/2023004 and Independent Spent Fuel Storage Installation Inspection Report 07200012/2023001Non-Destructive Examination
Internal Flooding
Hydrostatic
Enforcement Discretion
Functionality Assessment
Condition Adverse to Quality
Aging Management
Significance Determination Process
Double blade guide
Operability Determination
Through-Wall Leak
Fire Protection Program
Power change
Downpower
IR 05000333/20234018 December 2023Cybersecurity Inspection Report 05000333/2023401 (Cover Letter Only)Affidavit
IR 05000333/202300313 November 2023Integrated Inspection Report 05000333/2023003Commercial Grade Dedication
Enforcement Discretion
Probabilistic Risk Assessment
Functionality Assessment
Condition Adverse to Quality
Missed surveillance
Significance Determination Process
Operability Determination
Battery sizing
Maintenance Rule Program
Fire Protection Program
Power change
Unidentified leakage
IR 05000333/202301026 October 2023Biennial Problem Identification and Resolution Inspection Report 05000333/2023010Enforcement Discretion
FLEX
Significance Determination Process
Operability Determination
Turbine Missile
Through Wall Leak
IR 05000333/202330119 October 2023Initial Operator Licensing Examination Report 05000333/2023301
IR 05000333/202300531 August 2023Updated Inspection Plan for James A. FitzPatrick Nuclear Power Plant (Report 05000333/2023005)Fitness for Duty
Commercial Grade Dedication
Cyber Security
IR 05000333/20230027 August 2023Integrated Inspection Report 05000333/2023002Packing leak
Non-Destructive Examination
Hydrostatic
Enforcement Discretion
Probabilistic Risk Assessment
Temporary Modification
Functionality Assessment
FLEX
Significance Determination Process
Large early release frequency
Operability Determination
Earthquake
Fire Protection Program
Scaffolding
Downpower
IR 05000333/202340226 July 2023Security Baseline Inspection Report 05000333/2023402Affidavit
IR 05000333/202301125 July 2023Post-Approval Site Inspection for License Renewal - Phase 4 Inspection Report 05000333/2023011Non-Destructive Examination
Probabilistic Risk Assessment
Aging Management
Significance Determination Process
License Renewal
IR 05000333/202350120 July 2023Emergency Preparedness Biennial Exercise Inspection Report 05000333/2023501
IR 05000333/202342026 June 2023Security Baseline Inspection Report 05000333 2023420Safeguards Contingency Plan
IR 05000333/20230013 May 2023Integrated Inspection Report 05000333/2023001High Radiation Area
Enforcement Discretion
Probabilistic Risk Assessment
Temporary Modification
Functionality Assessment
FLEX
Missed surveillance
Significance Determination Process
Operability Determination
Maintenance Rule Program
Through-Wall Leak
Fire Protection Program
Power change
Downpower
IR 05000333/202301213 April 2023Quadrennial Fire Protection Inspection Report 05000333/2023012Safe Shutdown
Aging Management
Time Critical Operator Action
License Renewal
Fire Protection Program
IR 05000333/202200420 March 2023Integrated Inspection Report 05000333/2022004Ultimate heat sink
Weld Overlay
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Nondestructive Examination
Temporary Modification
Squib
Functionality Assessment
Incorporated by reference
Condition Adverse to Quality
FLEX
Significance Determination Process
Operability Determination
Spent Fuel Pool Instrumentation
Overtravel
Maintenance Rule Program
Very Low Safety Significance Issue Resolution
Through-Wall Leak
Fire Protection Program
Unidentified leak
IR 05000333/20220061 March 2023Annual Assessment Letter for James A. FitzPatrick Nuclear Power Plant (Report 05000333/2022006)Commercial Grade Dedication
Cyber Security
License Renewal
Exemption Request
COVID-19
IR 05000333/202200310 November 2022Integrated Inspection Report 05000333/2022003Safe Shutdown
High Radiation Area
Offsite Dose Calculation Manual
Past operability
Enforcement Discretion
Temporary Modification
Functionality Assessment
Aging Management
Significance Determination Process
Operability Determination
Fire Protection Program
Scaffolding
IR 05000333/202200531 August 2022Updated Inspection Plan for James A. Fitzpatrick Nuclear Power Plant (Report 05000333/2022005)Commercial Grade Dedication
Cyber Security
License Renewal
Exemption Request
COVID-19
COVID19
IR 05000333/202200210 August 2022Integrated Inspection Report 05000333/2022002Internal Flooding
Enforcement Discretion
Temporary Modification
Emergency Lighting
Functionality Assessment
Condition Adverse to Quality
Significance Determination Process
Operability Determination
Fire Protection Program
IR 05000333/202201027 June 2022Reissued Design Basis Assurance Inspection (Teams) Inspection Report 05000333/2022010FLEX
Significance Determination Process
Large early release frequency
ML22153A2612 June 2022Design Basis Assurance Inspection (Teams) Inspection Report 05000333/2022010FLEX
Significance Determination Process
Large early release frequency
IR 05000333/202101423 May 2022Problem Identification and Resolution Inspection Report 05000333/2021014Hot Short
Safe Shutdown
Unanalyzed Condition
Enforcement Discretion
Probabilistic Risk Assessment
Significance Determination Process
Large early release frequency
Fire Protection Program
IR 05000333/20220015 May 2022Integrated Inspection Report 05000333/2022001 and Independent Spent Fuel Storage Installation Inspection Report 07200012/2022001Safe Shutdown
Fire Barrier
Stroke time
Enforcement Discretion
Temporary Modification
Functionality Assessment
Operability Determination
Fire Protection Program
Power change
Downpower
Flow Induced Vibration
IR 05000333/20210062 March 2022Annual Assessment Letter for James A. Fitzpatrick Nuclear Power Plant (Report 05000333/2021006)Fitness for Duty
Cyber Security
License Renewal
Exemption Request
COVID-19
IR 05000333/202100427 January 2022Integrated Inspection Report 05000333/2021004Hot Short
High winds
Commercial Grade Dedication
Internal Flooding
Probabilistic Risk Assessment
Condition Adverse to Quality
FLEX
Significance Determination Process
Large early release frequency
License Renewal
Fire Protection Program
Scaffolding
Downpower
IR 05000333/20210408 November 202195001 Supplemental Inspection Report 05000333/2021040 and Assessment Follow-Up LetterEnforcement Discretion
Condition Adverse to Quality
Significance Determination Process
Preliminary White Finding
IR 05000333/20210038 November 2021Integrated Inspection Report 05000333/2021003Hot Short
Ultimate heat sink
Tornado Missile
Internal Flooding
Temporary Modification
Functionality Assessment
Locked High Radiation Area
FLEX
Significance Determination Process
Tornado Missile Protection
Operability Determination
License Renewal
Coronavirus
COVID-19
Fire Protection Program
Grace period
Operability Assessment
IR 05000333/20213015 October 2021Initial Operator Licensing Examination Report 05000333/2021301
IR 05000333/202150129 September 2021Emergency Preparedness Biennial Exercise Inspection Report 05000333/2021501Coronavirus
COVID-19
IR 05000333/20210051 September 2021Updated Inspection Plan for the James A. Fitzpatrick Nuclear Power Plant (Report 05000333/2021005)Fitness for Duty
Cyber Security
License Renewal
Exemption Request
COVID-19
IR 05000333/202101311 August 2021Biennial Problem Identification and Resolution Inspection Report 05000333/2021013Cyber Security
Condition Adverse to Quality
FLEX
Significance Determination Process
Foreign Material Exclusion
Coronavirus
COVID-19
Fuel cladding
IR 05000333/20210023 August 2021James A. Fitpatrick Nuclear Power Plant - Integrated Inspection Report 05000333/2021002High Radiation Area
Half scram
Enforcement Discretion
Functionality Assessment
B.5.b
Job Performance Measure
Operability Determination
Severe Accident Management Guideline
Coronavirus
COVID-19
Through-Wall Leakage
Fire Protection Program
ML21176A00525 June 2021Acknowledgement of Dispute of Violations Associated with White Finding - NRC Inspection Report 05000333/2021090
IR 05000333/202109025 June 2021Acknowledgement of Dispute of Violations Associated with White Finding - NRC Inspection Report 05000333/2021090
IR 05000333/20214029 June 2021Security Baseline Inspection Report 05000333/2021402Coronavirus
COVID-19
IR 05000333/20210113 June 2021Design Basis Assurance Inspection (Programs) Inspection Report 05000333/2021011Stroke time
Squib
Power-Operated Valves
Coronavirus
COVID-19
IR 05000333/20210015 May 2021Integrated Inspection Report 05000333/2021001Temporary Modification
Squib
Functionality Assessment
Significance Determination Process
Operability Determination
Earthquake
Maintenance Rule Program
Coronavirus
COVID-19
Fire Protection Program
Power change
IR 05000333/20210124 May 2021Temporary Instruction 2515/194 Inspection Report 05000333/2021012Probabilistic Risk Assessment
Reserve Station Service Transformer
Operator Manual Action
Open Phase Condition
Large early release frequency
IR 05000333/202140119 April 2021Material Control and Accounting Program Inspection Report 05000333/2021401 (Letter Only)Affidavit
IR 05000333/20210107 April 2021Triennial Fire Protection Inspection Report 05000333/2021010Safe Shutdown
Fire Barrier
Internal Flooding
Probabilistic Risk Assessment
Time Critical Operator Action
License Renewal
Continuous fire watch
Fire Protection Program
Fire Watch
Hourly Fire Watch
Early Warning Fire Detection
IR 05000333/20200063 March 2021Annual Assessment Letter for James A. FitzPatrick Nuclear Power Plant (Report 05000333/2020006)Fitness for Duty
Open Phase Condition
Exemption Request
Power-Operated Valves
Power Operated Valves
COVID-19
IR 05000333/202000411 February 2021Integrated Inspection Report 05000333/2020004High Radiation Area
Grab sample
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Temporary Modification
Functionality Assessment
FLEX
Significance Determination Process
Operability Determination
Maintenance Rule Program
Coronavirus
COVID-19
Fire Protection Program
Substantial potential for overexposure
Operability Assessment
Overexposure
IR 05000333/202001221 January 2021Problem Identification and Resolution Report 05000333/2020012 and Preliminary White Finding and Apparent ViolationHigh winds
Mission time
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
FLEX
Significance Determination Process
Large early release frequency
Coronavirus
COVID-19
Preliminary White Finding
IR 05000333/202042010 December 2020Security Inspection Report 05000333/2020420Safeguards Contingency Plan
IR 05000333/202000310 November 2020Integrated Inspection Report 05000333/2020003High Radiation Area
Weld Overlay
Anchor Darling
Nondestructive Examination
Temporary Modification
Functionality Assessment
Operability Determination
Coronavirus
COVID-19
Liquid penetrant
Through-Wall Leak
Through Wall Leak
Fire Protection Program
Dissimilar Metal Weld
IR 05000333/202040216 September 2020Security Baseline Inspection Report 05000333/2020402Coronavirus
COVID-19
IR 05000333/202000531 August 2020Updated Inspection Plan for James A. Fitzpatrick Nuclear Power Plant (Report 05000333/2020005)Fitness for Duty
Open Phase Condition
Exemption Request
Power-Operated Valves
Power Operated Valves
COVID-19
IR 05000333/202000210 August 2020Integrated Inspection Report 05000333/2020002Time of Discovery
Reactor Vessel Water Level
Enforcement Discretion
Temporary Modification
Functionality Assessment
FLEX
Significance Determination Process
Annual Radioactive Effluent Release Report
Operability Determination
Coronavirus
COVID-19
Fire Protection Program
Downpower
IR 05000333/202040128 July 2020Cyber Security Inspection Report 05000333/2020401 (Letter Only)Cyber Security
Affidavit
IR 05000333/202001130 April 2020Problem Identification and Resolution Annual Sample Inspection Report 05000333/2020011Hot Short
Safe Shutdown
Unanalyzed Condition
Enforcement Discretion
Probabilistic Risk Assessment
Significance Determination Process
Large early release frequency
IR 05000333/202000128 April 2020Integrated Inspection Report 05000333/2020001Unanalyzed Condition
Water Inventory Control
Internal Flooding
Enforcement Discretion
Anchor Darling
Temporary Modification
Functionality Assessment
Significance Determination Process
Foreign Material Exclusion
Operability Determination
Coronavirus
COVID-19
Fuel cladding
Fire Protection Program
Incremental Core Damage Probability Deficit
Power change
Downpower
Failure to Scram