Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
IR 05000341/20230045 February 2024Integrated Inspection Report 05000341/2023004
IR 05000341/20230108 December 2023Nbsp;Biennial Problem Identification and Resolution Inspection Report 05000341/2023010Safe Shutdown
Unanalyzed Condition
Fitness for Duty
Loop seal
Packing leak
Ultimate heat sink
Stroke time
Fire impairment
Locked High Radiation Area
Condition Adverse to Quality
Significance Determination Process
Foreign Material Exclusion
Operability Determination
License Renewal
Fire Protection Program
Fire Watch
Unidentified leakage
IR 05000016/20230011 December 2023NRC Inspection Report No. 050-00016/2023-001 (Drss) - Enrico Fermi Atomic Power Plant, Unit 1
IR 05000341/20230037 November 2023Integrated Inspection Report 05000341/2023003 and 07200071/2023001Safe Shutdown
Ultimate heat sink
Offsite Dose Calculation Manual
Enforcement Discretion
Temporary Modification
Functionality Assessment
Significance Determination Process
Pressure and Temperature Limits Report
Annual Radioactive Effluent Release Report
Foreign Material Exclusion
Annual Radiological Environmental Operating Report
Operability Determination
Earthquake
Liquid penetrant
Fire Protection Program
Unidentified leakage
IR 05000341/202300524 August 2023Updated Inspection Plan for Fermi Power Plant, Unit 2 (Report 05000341/2023005)License Renewal
IR 05000341/202330116 August 2023NRC Initial License Examination Report 05000341/2023301Job Performance Measure
IR 05000341/20230024 August 2023Integrated Inspection Report 05000341/2023002Safe Shutdown
Packing leak
Ultimate heat sink
Fire Barrier
Commercial Grade Dedication
Internal Flooding
Past operability
Enforcement Discretion
Functionality Assessment
Missed surveillance
Operability Determination
License Renewal
Fire Protection Program
Grace period
IR 05000341/202300128 June 2023Integrated Inspection Report 05000341/2023001High winds
High Radiation Area
Ultimate heat sink
Fire Barrier
Past operability
Temporary Modification
Cyber Security
Functionality Assessment
FLEX
Test box
Significance Determination Process
Operability Determination
License Renewal
Fire Protection Program
Grace period
Power change
IR 05000341/202200422 June 2023Non-Concurrence on Fermi Power Plant, Unit 2 - Integrated Inspection Report 05000341/2022004Safe Shutdown
Unanalyzed Condition
Tornado Generated Missile
Operability Determination
Non-Concurrence Process
Earthquake
IR 05000341/202201021 June 2023Reissue Fermi Power Plant, Unit 2, Design Basis Assurance Inspection (Teams) Inspection Report 05000341/2022010Safe Shutdown
Packing leak
Condition Adverse to Quality
Tornado Generated Missile
Significance Determination Process
Large early release frequency
Earthquake
IR 05000341/20234021 May 2023Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000341/2023402
IR 05000341/20230116 April 2023Triennial Fire Protection Inspection Report 05000341/2023011Safe Shutdown
Fire Barrier
Emergency Lighting
License Renewal
Fire Protection Program
Fire Watch
IR 05000341/202340117 March 2023Security Baseline Inspection Report 05000341/2023401Fitness for Duty
IR 05000341/20220061 March 2023Annual Assessment Letter for Fermi Power Plant, Unit 2 (Report 05000341/2022006)Commercial Grade Dedication
License Renewal
Exemption Request
COVID-19
ML23039A15514 February 2023Integrated Inspection Report 05000341/2022004Unanalyzed Condition
Boric Acid
Packing leak
Ultimate heat sink
Internal Flooding
Past operability
Enforcement Discretion
Functionality Assessment
FLEX
Significance Determination Process
Foreign Material Exclusion
Severe Accident Management Guideline
Fire Protection Program
IR 05000341/202240313 February 2023Security Baseline Inspection Report 05000341/2022403Affidavit
ML22313A1039 November 2022Design Basis Assurance Inspection (Teams) Inspection Report 05000341/2022010Safe Shutdown
Packing leak
Condition Adverse to Quality
Significance Determination Process
Large early release frequency
IR 05000341/20220038 November 2022Integrated Inspection Report 05000341/2022003Past operability
Nondestructive Examination
Temporary Modification
Functionality Assessment
Significance Determination Process
Process Control Program
Operability Determination
Fire Protection Program
Downpower
Operability Assessment
IR 05000016/20220018 November 2022NRC Inspection Report No. 05000016/2022001(DRSS) - Enrico Fermi Atomic Power Plant, Unit 1
IR 05000341/20224201 November 2022Security Baseline Inspection Report 05000341/2022420Affidavit
IR 05000341/202250117 October 2022Emergency Preparedness Biennial Exercise Inspection Report 05000341/2022501
IR 05000341/202200525 August 2022Updated Inspection Plan for Fermi Power Plant, Unit 2 (Report 05000341/2022005)Commercial Grade Dedication
Exemption Request
Coronavirus
IR 05000341/20220024 August 2022Integrated Inspection Report 05000341/2022002Safe Shutdown
Half scram
Hydrostatic
Past operability
Enforcement Discretion
Squib
Functionality Assessment
Significance Determination Process
Operability Determination
TORMIS
Fire Protection Program
Fire Watch
Downpower
Unidentified leakage
IR 05000341/20220019 May 2022Integrated Inspection Report 05000341/2022001Safe Shutdown
High winds
High Radiation Area
Stroke time
Water Inventory Control
Internal Flooding
Past operability
Enforcement Discretion
Nondestructive Examination
Temporary Modification
Functionality Assessment
Condition Adverse to Quality
Significance Determination Process
Operability Determination
Liquid penetrant
Fire Protection Program
Power change
IR 05000341/202240121 March 2022Security Baseline Inspection Report 05000341/2022401Coronavirus
COVID-19
IR 05000341/20210062 March 2022Annual Assessment Letter for Fermi Power Plant, Unit 2 (Report 05000341/2021006)Commercial Grade Dedication
Exemption Request
Coronavirus
IR 05000341/20210047 February 2022Integrated Inspection Report 05000341/2021004Time of Discovery
Packing leak
Offsite Dose Calculation Manual
Stroke time
Slow transfer
Internal Flooding
Past operability
Temporary Modification
Functionality Assessment
Significance Determination Process
Scram Discharge Volume
Operability Determination
Spent Fuel Pool Instrumentation
Frazil ice
Fire Protection Program
Scaffolding
Downpower
IR 05000341/202101317 December 2021Temporary Instruction 2515/194 Inspection Report 05000341/2021013Probabilistic Risk Assessment
Operator Manual Action
Open Phase Condition
Large early release frequency
Coronavirus
IR 05000016/202100113 December 2021Subject: NRC Inspection Report No. 050-00016/2021-001 (DNMS) - Enrico Fermi Atomic Power Plant, Unit 1
IR 05000341/20214029 December 2021Security Baseline Inspection Report 05000341/2021402Affidavit
IR 05000341/20210127 December 2021Biennial Problem Identification and Resolution Inspection Report 05000341/2021012Unanalyzed Condition
Packing leak
Ultimate heat sink
Temporary Modification
Operability Determination
Maintenance Rule Program
Fire Watch
IR 05000341/202100328 October 2021Integrated Inspection Report 05000341/2021003Safe Shutdown
Unanalyzed Condition
Packing leak
High Radiation Area
Internal Flooding
Hydrostatic
Temporary Modification
Functionality Assessment
Significance Determination Process
Foreign Material Exclusion
Operability Determination
Containment Hardened Vent
Coronavirus
COVID-19
Fire Protection Program
Scaffolding
Incremental Core Damage Probability Deficit
Siren
IR 05000341/202150121 October 2021Emergency Preparedness Biennial Exercise Inspection Report 05000341/2021501Coronavirus
COVID-19
IR 05000341/20214038 September 2021Material Control and Accounting Program Inspection Report 05000341/2021403Affidavit
IR 05000341/20210051 September 2021Updated Inspection Plan for Fermi Power Plant, Unit 2 (Report 05000341/2021005)Cyber Security
Exemption Request
Coronavirus
IR 05000341/202101125 August 2021Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000341/2021011Coatings
Finite Element Analysis
Aging Management
Significance Determination Process
Coronavirus
COVID-19
IR 05000341/20210026 August 2021Integrated Inspection Report 05000341/2021002Safe Shutdown
Unanalyzed Condition
Shutdown Margin
Reactor Vessel Water Level
Packing leak
Fire Barrier
Internal Flooding
Past operability
Fire impairment
Squib
Functionality Assessment
FLEX
Significance Determination Process
Operability Determination
Coronavirus
Hardened vent
COVID-19
Fire Protection Program
Fire Watch
Hourly Fire Watch
Downpower
IR 05000341/202130113 July 2021NRC Initial License Examination Report 05000341/2021301Job Performance Measure
IR 05000341/20214017 June 2021Security Baseline Inspection Report 05000341/2021401Cyber Security
Coronavirus
COVID-19
IR 05000341/20210014 May 2021Integrated Inspection Report 05000341/2021001Reactor Vessel Water Level
Enforcement Discretion
Temporary Modification
Functionality Assessment
Significance Determination Process
Operability Determination
Coronavirus
COVID-19
Fire Protection Program
Scaffolding
Power change
Downpower
IR 05000341/20210103 May 2021Design Basis Assurance Inspection (Programs) Inspection Report 05000341/2021010Stroke time
Squib
Power-Operated Valves
Coronavirus
COVID-19
Weak link
IR 05000341/202030218 March 2021NRC Initial License Examination Report 05000341/2020302Job Performance Measure
IR 05000341/20200064 March 2021Annual Assessment Letter for Fermi Power Plant, Unit 2 (Report 05000341/2020006)Open Phase Condition
Exemption Request
Coronavirus
IR 05000341/202000410 February 2021Integrated Inspection Report 05000341/2020004Offsite Dose Calculation Manual
Internal Flooding
Enforcement Discretion
Temporary Modification
Functionality Assessment
FLEX
Annual Radioactive Effluent Release Report
Operability Determination
License Renewal
Maintenance Rule Program
Coronavirus
COVID-19
Fire Protection Program
IR 05000016/202000112 January 2021Enrico Fermi Atomic Power Plant, Unit 1, NRC Inspection Report 05000016/2020001 (DNMS)
IR 05000341/202040212 November 2020Security Baseline Inspection Report 05000341/2020402Safeguards Contingency Plan
Coronavirus
COVID-19
IR 05000341/20200105 November 2020Confirmatory Action Letter Followup Inspection Report 05000341/2020010 and ClosureCoatings
Significance Determination Process
Coronavirus
COVID-19
IR 05000341/20200033 November 2020Integrated Inspection Report 05000341/2020003Fire Barrier
Water Inventory Control
Hydrostatic
Past operability
Enforcement Discretion
Coatings
VT-2
Functionality Assessment
Operability Determination
Earthquake
Coronavirus
COVID-19
Fire Protection Program
IR 05000341/202001219 October 2020Information Request to Support Upcoming Temporary Instruction 2515/194 Inspection; Inspection Report 05000341/2020012Open Phase Condition
IR 05000341/202040113 October 2020Security Baseline Inspection Report 05000341/2020401Fitness for Duty
Coronavirus
COVID-19