IR 05000341/2023004 | 5 February 2024 | Integrated Inspection Report 05000341/2023004 | |
IR 05000341/2023010 | 8 December 2023 | Nbsp;Biennial Problem Identification and Resolution Inspection Report 05000341/2023010 | Safe Shutdown Unanalyzed Condition Fitness for Duty Loop seal Packing leak Ultimate heat sink Stroke time Fire impairment Locked High Radiation Area Condition Adverse to Quality Significance Determination Process Foreign Material Exclusion Operability Determination License Renewal Fire Protection Program Fire Watch Unidentified leakage |
IR 05000016/2023001 | 1 December 2023 | NRC Inspection Report No. 050-00016/2023-001 (Drss) - Enrico Fermi Atomic Power Plant, Unit 1 | |
IR 05000341/2023003 | 7 November 2023 | Integrated Inspection Report 05000341/2023003 and 07200071/2023001 | Safe Shutdown Ultimate heat sink Offsite Dose Calculation Manual Enforcement Discretion Temporary Modification Functionality Assessment Significance Determination Process Pressure and Temperature Limits Report Annual Radioactive Effluent Release Report Foreign Material Exclusion Annual Radiological Environmental Operating Report Operability Determination Earthquake Liquid penetrant Fire Protection Program Unidentified leakage |
IR 05000341/2023005 | 24 August 2023 | Updated Inspection Plan for Fermi Power Plant, Unit 2 (Report 05000341/2023005) | License Renewal |
IR 05000341/2023301 | 16 August 2023 | NRC Initial License Examination Report 05000341/2023301 | Job Performance Measure |
IR 05000341/2023002 | 4 August 2023 | Integrated Inspection Report 05000341/2023002 | Safe Shutdown Packing leak Ultimate heat sink Fire Barrier Commercial Grade Dedication Internal Flooding Past operability Enforcement Discretion Functionality Assessment Missed surveillance Operability Determination License Renewal Fire Protection Program Grace period |
IR 05000341/2023001 | 28 June 2023 | Integrated Inspection Report 05000341/2023001 | High winds High Radiation Area Ultimate heat sink Fire Barrier Past operability Temporary Modification Cyber Security Functionality Assessment FLEX Test box Significance Determination Process Operability Determination License Renewal Fire Protection Program Grace period Power change |
IR 05000341/2022004 | 22 June 2023 | Non-Concurrence on Fermi Power Plant, Unit 2 - Integrated Inspection Report 05000341/2022004 | Safe Shutdown Unanalyzed Condition Tornado Generated Missile Operability Determination Non-Concurrence Process Earthquake |
IR 05000341/2022010 | 21 June 2023 | Reissue Fermi Power Plant, Unit 2, Design Basis Assurance Inspection (Teams) Inspection Report 05000341/2022010 | Safe Shutdown Packing leak Condition Adverse to Quality Tornado Generated Missile Significance Determination Process Large early release frequency Earthquake |
IR 05000341/2023402 | 1 May 2023 | Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000341/2023402 | |
IR 05000341/2023011 | 6 April 2023 | Triennial Fire Protection Inspection Report 05000341/2023011 | Safe Shutdown Fire Barrier Emergency Lighting License Renewal Fire Protection Program Fire Watch |
IR 05000341/2023401 | 17 March 2023 | Security Baseline Inspection Report 05000341/2023401 | Fitness for Duty |
IR 05000341/2022006 | 1 March 2023 | Annual Assessment Letter for Fermi Power Plant, Unit 2 (Report 05000341/2022006) | Commercial Grade Dedication License Renewal Exemption Request COVID-19 |
ML23039A155 | 14 February 2023 | Integrated Inspection Report 05000341/2022004 | Unanalyzed Condition Boric Acid Packing leak Ultimate heat sink Internal Flooding Past operability Enforcement Discretion Functionality Assessment FLEX Significance Determination Process Foreign Material Exclusion Severe Accident Management Guideline Fire Protection Program |
IR 05000341/2022403 | 13 February 2023 | Security Baseline Inspection Report 05000341/2022403 | Affidavit |
ML22313A103 | 9 November 2022 | Design Basis Assurance Inspection (Teams) Inspection Report 05000341/2022010 | Safe Shutdown Packing leak Condition Adverse to Quality Significance Determination Process Large early release frequency |
IR 05000341/2022003 | 8 November 2022 | Integrated Inspection Report 05000341/2022003 | Past operability Nondestructive Examination Temporary Modification Functionality Assessment Significance Determination Process Process Control Program Operability Determination Fire Protection Program Downpower Operability Assessment |
IR 05000016/2022001 | 8 November 2022 | NRC Inspection Report No. 05000016/2022001(DRSS) - Enrico Fermi Atomic Power Plant, Unit 1 | |
IR 05000341/2022420 | 1 November 2022 | Security Baseline Inspection Report 05000341/2022420 | Affidavit |
IR 05000341/2022501 | 17 October 2022 | Emergency Preparedness Biennial Exercise Inspection Report 05000341/2022501 | |
IR 05000341/2022005 | 25 August 2022 | Updated Inspection Plan for Fermi Power Plant, Unit 2 (Report 05000341/2022005) | Commercial Grade Dedication Exemption Request Coronavirus |
IR 05000341/2022002 | 4 August 2022 | Integrated Inspection Report 05000341/2022002 | Safe Shutdown Half scram Hydrostatic Past operability Enforcement Discretion Squib Functionality Assessment Significance Determination Process Operability Determination TORMIS Fire Protection Program Fire Watch Downpower Unidentified leakage |
IR 05000341/2022001 | 9 May 2022 | Integrated Inspection Report 05000341/2022001 | Safe Shutdown High winds High Radiation Area Stroke time Water Inventory Control Internal Flooding Past operability Enforcement Discretion Nondestructive Examination Temporary Modification Functionality Assessment Condition Adverse to Quality Significance Determination Process Operability Determination Liquid penetrant Fire Protection Program Power change |
IR 05000341/2022401 | 21 March 2022 | Security Baseline Inspection Report 05000341/2022401 | Coronavirus COVID-19 |
IR 05000341/2021006 | 2 March 2022 | Annual Assessment Letter for Fermi Power Plant, Unit 2 (Report 05000341/2021006) | Commercial Grade Dedication Exemption Request Coronavirus |
IR 05000341/2021004 | 7 February 2022 | Integrated Inspection Report 05000341/2021004 | Time of Discovery Packing leak Offsite Dose Calculation Manual Stroke time Slow transfer Internal Flooding Past operability Temporary Modification Functionality Assessment Significance Determination Process Scram Discharge Volume Operability Determination Spent Fuel Pool Instrumentation Frazil ice Fire Protection Program Scaffolding Downpower |
IR 05000341/2021013 | 17 December 2021 | Temporary Instruction 2515/194 Inspection Report 05000341/2021013 | Probabilistic Risk Assessment Operator Manual Action Open Phase Condition Large early release frequency Coronavirus |
IR 05000016/2021001 | 13 December 2021 | Subject: NRC Inspection Report No. 050-00016/2021-001 (DNMS) - Enrico Fermi Atomic Power Plant, Unit 1 | |
IR 05000341/2021402 | 9 December 2021 | Security Baseline Inspection Report 05000341/2021402 | Affidavit |
IR 05000341/2021012 | 7 December 2021 | Biennial Problem Identification and Resolution Inspection Report 05000341/2021012 | Unanalyzed Condition Packing leak Ultimate heat sink Temporary Modification Operability Determination Maintenance Rule Program Fire Watch |
IR 05000341/2021003 | 28 October 2021 | Integrated Inspection Report 05000341/2021003 | Safe Shutdown Unanalyzed Condition Packing leak High Radiation Area Internal Flooding Hydrostatic Temporary Modification Functionality Assessment Significance Determination Process Foreign Material Exclusion Operability Determination Containment Hardened Vent Coronavirus COVID-19 Fire Protection Program Scaffolding Incremental Core Damage Probability Deficit Siren |
IR 05000341/2021501 | 21 October 2021 | Emergency Preparedness Biennial Exercise Inspection Report 05000341/2021501 | Coronavirus COVID-19 |
IR 05000341/2021403 | 8 September 2021 | Material Control and Accounting Program Inspection Report 05000341/2021403 | Affidavit |
IR 05000341/2021005 | 1 September 2021 | Updated Inspection Plan for Fermi Power Plant, Unit 2 (Report 05000341/2021005) | Cyber Security Exemption Request Coronavirus |
IR 05000341/2021011 | 25 August 2021 | Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000341/2021011 | Coatings Finite Element Analysis Aging Management Significance Determination Process Coronavirus COVID-19 |
IR 05000341/2021002 | 6 August 2021 | Integrated Inspection Report 05000341/2021002 | Safe Shutdown Unanalyzed Condition Shutdown Margin Reactor Vessel Water Level Packing leak Fire Barrier Internal Flooding Past operability Fire impairment Squib Functionality Assessment FLEX Significance Determination Process Operability Determination Coronavirus Hardened vent COVID-19 Fire Protection Program Fire Watch Hourly Fire Watch Downpower |
IR 05000341/2021301 | 13 July 2021 | NRC Initial License Examination Report 05000341/2021301 | Job Performance Measure |
IR 05000341/2021401 | 7 June 2021 | Security Baseline Inspection Report 05000341/2021401 | Cyber Security Coronavirus COVID-19 |
IR 05000341/2021001 | 4 May 2021 | Integrated Inspection Report 05000341/2021001 | Reactor Vessel Water Level Enforcement Discretion Temporary Modification Functionality Assessment Significance Determination Process Operability Determination Coronavirus COVID-19 Fire Protection Program Scaffolding Power change Downpower |
IR 05000341/2021010 | 3 May 2021 | Design Basis Assurance Inspection (Programs) Inspection Report 05000341/2021010 | Stroke time Squib Power-Operated Valves Coronavirus COVID-19 Weak link |
IR 05000341/2020302 | 18 March 2021 | NRC Initial License Examination Report 05000341/2020302 | Job Performance Measure |
IR 05000341/2020006 | 4 March 2021 | Annual Assessment Letter for Fermi Power Plant, Unit 2 (Report 05000341/2020006) | Open Phase Condition Exemption Request Coronavirus |
IR 05000341/2020004 | 10 February 2021 | Integrated Inspection Report 05000341/2020004 | Offsite Dose Calculation Manual Internal Flooding Enforcement Discretion Temporary Modification Functionality Assessment FLEX Annual Radioactive Effluent Release Report Operability Determination License Renewal Maintenance Rule Program Coronavirus COVID-19 Fire Protection Program |
IR 05000016/2020001 | 12 January 2021 | Enrico Fermi Atomic Power Plant, Unit 1, NRC Inspection Report 05000016/2020001 (DNMS) | |
IR 05000341/2020402 | 12 November 2020 | Security Baseline Inspection Report 05000341/2020402 | Safeguards Contingency Plan Coronavirus COVID-19 |
IR 05000341/2020010 | 5 November 2020 | Confirmatory Action Letter Followup Inspection Report 05000341/2020010 and Closure | Coatings Significance Determination Process Coronavirus COVID-19 |
IR 05000341/2020003 | 3 November 2020 | Integrated Inspection Report 05000341/2020003 | Fire Barrier Water Inventory Control Hydrostatic Past operability Enforcement Discretion Coatings VT-2 Functionality Assessment Operability Determination Earthquake Coronavirus COVID-19 Fire Protection Program |
IR 05000341/2020012 | 19 October 2020 | Information Request to Support Upcoming Temporary Instruction 2515/194 Inspection; Inspection Report 05000341/2020012 | Open Phase Condition |
IR 05000341/2020401 | 13 October 2020 | Security Baseline Inspection Report 05000341/2020401 | Fitness for Duty Coronavirus COVID-19 |