IR 05000369/19990064 October 1999Insp Repts 50-369/99-06 & 50-370/99-06 on 990801-0911. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support
IR 05000369/199900526 August 1999Insp Repts 50-369/99-05 & 50-370/99-05 on 990620-0731.Two Violations Noted Being Treated as Ncv.Major Areas Inspected: Operations,Maint,Engineering & Plant SupportHydrostatic
Probabilistic Risk Assessment
Time Critical Operator Action
Fire Protection Program
IR 05000369/199900413 July 1999Insp Repts 50-369/99-04 & 50-370/99-04 on 990509-0619.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant SupportSafe Shutdown
Unanalyzed Condition
Fire Barrier
Past operability
Probabilistic Risk Assessment
Job Performance Measure
Fire Watch
Unidentified leakage
IR 05000369/199901016 June 1999Insp Repts 50-369/99-10 & 50-370/99-10 on 990322-26.No Violations Noted.Major Areas Inspected:Aspect of Licensee Health Physics Activities During Unit 2 Refueling OutageHigh Radiation Area
Locked High Radiation Area
IR 05000369/19990032 June 1999Insp Repts 50-369/99-03 & 50-370/99-03 on 990328-0508. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant SupportUnanalyzed Condition
Coatings
Foreign Material Exclusion
Operability Determination
Earthquake
Pressure Boundary Leakage
IR 05000369/199900223 April 1999Insp Repts 50-369/99-02 & 50-370/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant SupportHydrostatic
Enforcement Discretion
Probabilistic Risk Assessment
Nondestructive Examination
IR 05000369/199900110 March 1999Insp Repts 50-369/99-01 & 50-370/99-01 on 990103-0213.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant SupportSafe Shutdown
Fire Barrier
Rod Drop Event
Scaffolding
IR 05000369/199801018 December 1998Insp Repts 50-369/98-10 & 50-370/98-10 on 981004-1121.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant SupportSafe Shutdown
Grab sample
Fire Barrier
Past operability
Annual Radiological Environmental Operating Report
Severe Accident Management Guideline
Rod Drop Event
Maintenance Rule Program
Fire Watch
Siren
IR 05000369/199800930 October 1998Insp Repts 50-369/98-09 & 50-370/98-09 on 980823-1003.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant SupportSafe Shutdown
Boric Acid
Shutdown Margin
Non-Destructive Examination
Safe Shutdown Earthquake
Fire impairment
Job Performance Measure
IR 05000369/199800821 September 1998Insp Repts 50-369/98-08 & 50-370/98-08 on 980712-0822.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant SupportLoop seal
Stroke time
Past operability
Enforcement Discretion
Temporary Modification
Foreign Material Exclusion
Operability Determination
IR 05000369/199801127 August 1998Insp Repts 50-369/98-11 & 50-370/98-11 on 980601-26 & 0805-07.No Violations Noted.Major Areas Inspected:Maint & Engineering Programs.Rept Reviewed Maintenance,Surveillance & Matl Condition of Mcquire,Unit 1 Ice Condenser SystemUnanalyzed Condition
IR 05000369/19980077 August 1998Insp Rept 50-369/98-07 & 50-370/98-07 on 980531-0711. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant SupportSafe Shutdown
Boric Acid
High Radiation Area
Non-Destructive Examination
Fire Barrier
Nondestructive Examination
Temporary Modification
Emergency Lighting
Locked High Radiation Area
Finite Element Analysis
Foreign Material Exclusion
Earthquake
Liquid penetrant
Pressure Boundary Leakage
Fire Protection Program
Dissimilar Metal Weld
Unidentified leakage
IR 05000369/199800625 June 1998Insp Repts 50-369/98-06 & 50-370/98-06 on 980419-0530.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant SupportBoric Acid
Fitness for Duty
High Radiation Area
Probabilistic Risk Assessment
Coatings
IR 05000369/19980044 June 1998Insp Repts 50-369/98-04 & 50-370/98-04 on 980413-24. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant SupportSafe Shutdown
Rod Drop Event
Exemption Request
IR 05000369/199800318 May 1998Insp Repts 50-369/98-03 & 50-370/98-03 on 980308-0418.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant SupportUnanalyzed Condition
Safe Shutdown Earthquake
Post Accident Monitoring
Temporary Modification
Incorporated by reference
Operability Determination
Downpower
ML20216H6176 April 1998Insp Repts 50-369/98-02 & 50-370/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant SupportUnanalyzed Condition
Boric Acid
Stroke time
Past operability
Rod Drop Event
IR 05000369/199702023 February 1998Insp Repts 50-369/97-20 & 50-370/97-20 on 971214-980124. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support,Including Review of Radiological Protection Practices & Plant Physical SecurityHigh Radiation Area
Hydrostatic
Past operability
Enforcement Discretion
Temporary Modification
Locked High Radiation Area
Foreign Material Exclusion
IR 05000369/199800117 February 1998Partially Withheld Insp Repts 50-369/98-01 & 50-370/98-01 on 980114-15 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant & Vehicle Barrier SysSafe Shutdown
ML20198P37712 January 1998Insp Repts 50-369/97-18 & 50-370/97-18 on 971102-1213. Violations Noted.Major Areas Inspected:Integrated Insp Included Aspects of Licensee Operation,Maint,Engineering & Plant SupportStroke time
Nondestructive Examination
Temporary Modification
Liquid penetrant
Backfit
Flow Induced Vibration
ML20199B1645 January 1998Insp Repts 50-369/97-19 & 50-370/97-19 on 971205-06. Violations Noted.Major Areas Inspected:Licensee Response to 971202 Event Involving Seal Damage Event at Four Air Lock Doors of Unit 2 Containment Bldg
IR 05000369/19970171 December 1997Insp Repts 50-369/97-17 & 50-370/97-17 on 970921-1101.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant SupportSafe Shutdown
Boric Acid
Non-Destructive Examination
Temporary Modification
Foreign Material Exclusion
Code Reconciliation
Control of Heavy Loads
Liquid penetrant
Scaffolding
IR 05000369/199701520 October 1997Insp Repts 50-369/97-15 & 50-370/97-15 on 970810-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support
IR 05000369/199701222 September 1997Insp Repts 50-369/97-12 & 50-370/97-12 on 970804-08.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness ExerciseSiren
ML20211E79816 September 1997Insp Repts 50-369/97-16 & 50-370/97-16 on 970712-0827. Violations Being Considered for Escalated Eas.Major Areas Inspected:Review of Aspects of Problem Involving Inoperable Unit 2 Ice Condenser Lower Inlet DoorsGOTHIC
IR 05000369/19970108 September 1997Insp Repts 50-369/97-10 & 50-370/97-10 on 970629-0809.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant SupportPacking leak
High Radiation Area
Stroke time
Nondestructive Examination
Temporary Modification
Foreign Material Exclusion
IR 05000369/199701322 August 1997Insp Repts 50-369/97-13 & 50-370/97-13 on 970721-24.No Violations Noted.Major Areas Inspected:Licensees Program for Compensatory Measures for Degraded Security Equipment
ML20149L57528 July 1997Insp Repts 50-369/97-09 & 50-370/97-09 on 970518-0628. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant SupportNon-Destructive Examination
Fire Barrier
Hydrostatic
Probabilistic Risk Assessment
Power change
Downpower
ML20149G68816 June 1997Insp Repts 50-369/97-08 & 50-370/97-08 on 970406-0517. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant SupportLoop seal
Past operability
Foreign Material Exclusion
Fire Watch
Scaffolding
IR 05000369/19970072 June 1997Insp Rept 50-369/97-07 on 970406-0503.Violations Noted.Major Areas Inspected:Sg Replacement Project Activities in Areas of Maint & EngineeringNon-Destructive Examination
Dissimilar Metal Weld
Scaffolding
IR 05000369/19970045 May 1997Insp Repts 50-369/97-04 & 50-370/97-04 on 970223-0405. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant SupportUnanalyzed Condition
Time of Discovery
High Radiation Area
Past operability
Locked High Radiation Area
Foreign Material Exclusion
Operability Determination
Downpower
IR 05000369/199700528 April 1997Insp Rept 50-369/97-05 on 970309-0405.No Violations Noted. Major Areas Inspected:Maint,Engineering & Plant SupportHigh Radiation Area
Liquid penetrant
IR 05000369/19970031 April 1997Insp Rept 50-369/97-03 on 970125-0308.No Violations Noted. Major Areas Inspected:Sg Replacement Project Preoutage Activities in Areas of Maint,Engineering & Plant SupportNondestructive Examination
Control of Heavy Loads
ML20137V15324 March 1997Insp Repts 50-369/97-01 & 50-370/97-01 on 970112-0222. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant SupportExemption Request
Downpower
IR 05000369/19970025 March 1997Insp Repts 50-369/97-02 & 50-370/97-02 on 970203-06.No Violations Noted.Major Area Inspected:Licensee Plant Support
ML20134L14610 February 1997Insp Repts 50-369/96-11 & 50-370/96-11 on 961201-970111. No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant SupportPacking leak
High Radiation Area
Offsite Dose Calculation Manual
Stroke time
Commercial Grade Dedication
Hydrostatic
Probabilistic Risk Assessment
Nondestructive Examination
Temporary Modification
Fire Protection Program
Dissimilar Metal Weld
Downpower
IR 05000369/199601030 December 1996Insp Repts 50-369/96-10 & 50-370/96-10 on 961020-1130.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant SupportTime of Discovery
Loop seal
Anticipated operational occurrence
Temporary Modification
Missed surveillance
Downpower
IR 05000369/199600927 November 1996Insp Repts 50-369/96-09 & 50-370/96-09 on 961104-08.No Violations Noted.Major Areas Inspected:Safeguards Insp Included Aspects of Licensee Plant SupportSafeguards Contingency Plan
Fire Watch
IR 05000369/199600815 November 1996Insp Repts 50-369/96-08 & 50-370/96-08 on 960908-1019. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant SupportPost Accident Monitoring
Past operability
Job Performance Measure
ML20128H6952 October 1996Insp Repts 50-369/96-07 & 50-370/96-07 on 960728-0907. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering Maint & Plant SupportSafe Shutdown Earthquake
Post Accident Monitoring
Past operability
Temporary Modification
IR 05000369/199402928 December 1994Insp Repts 50-369/94-29 & 50-370/94-29 on 941205-09.No Violations Noted.Major Areas Inspected:Util Physical Security Program for Np Reactors Including Protection of Safeguards Info,Access Controls & Alarm Stations
IR 05000369/199302911 January 1994Insp Repts 50-369/93-29 & 50-370/93-29 on 931121-1218.No Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maintenance Observations & Cold Weather PreparationTemporary Modification
Liquid penetrant
Unidentified leakage
IR 05000369/19930307 January 1994Insp Repts 50-369/93-30 & 50-370/93-30 on 931213-17.No Violations Noted.Major Areas Inspected:Design Changes & Plant Mods,Engineering & Technical Support Activities & follow-up on Previously Identified Insp FindingsStroke time
Emergency Lighting
IR 05000269/19930326 January 1994Insp Repts 50-269/93-32,50-270/93-32,50-287/93-32, 50-369/93-31,50-370/93-31,50-413/93-35 & 50-414,respectively on 931213-17.Violations Noted.Major Areas Inpected:Licensee Safeguards Info Program to folow-up on Licensee ReptsFitness for Duty
IR 05000369/199302829 December 1993Partially Withheld Insp Repts 50-369/93-28 & 50-370/93-28 on 931129-1202 (Ref 10CFR73.21).Violation Not Subj to Enforcement Action.Major Areas Inspected:Physical Security Program
IR 05000369/199302416 December 1993Insp Repts 50-369/93-24 & 50-370/93-24 on 931017-1120. Violations Noted.Major Areas Inspected:Plant Operations, Engineered Safety Features Sys Walkdown,Surveillance Testing & MaintenanceHigh Radiation Area
Scaffolding
Unidentified leakage
Unidentified leak
IR 05000369/199302615 December 1993Insp Repts 50-369/93-26 & 50-370/93-26 on 931115-19.No Violations Noted.Major Areas Inspected:Engineering & Technical Support of Plant Modifications,Design Changes & Plant OperationsTemporary Modification
Operability Determination
IR 05000369/19930252 December 1993Partially Withheld Insp Repts 50-369/93-25 & 50-370/93-25 on 931101-04 (Ref 10CFR73.21).Noncited Violations Noted.Major Areas Inspected:Licensee Physical Security Program for Power Reactors
IR 05000369/199302110 November 1993Insp Repts 50-369/93-21 & 50-370/93-21 on 931018-21.No Violations Noted.Major Areas Inspected:Simulator Control Room,Tsc,Osc & EOF
IR 05000369/19930229 November 1993Insp Repts 50-369/93-22 & 50-370/93-22 on Stated Date. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maintenance Observations,Ler & Followup on Previous Insp FindingsHydrostatic
IR 05000369/199301819 October 1993Insp Repts 50-369/93-18 & 50-370/93-18 on 930822-0925. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maint Observations,Plant Mods & Emergency Preparedness Training ExercisePacking leak
Stroke time
Hydrostatic
Temporary Modification
Fire Watch
Unidentified leakage
Unidentified leak