Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
PLA-5120, Forwards Change J to SSES Security Training & Qualification Plan.Without Encl | 22 October 1999 | Forwards Change J to SSES Security Training & Qualification Plan.Without Encl | |
ML18040B295 | 8 September 1999 | Requests Info Re Any NRC or Susquehanna Documented Concerns with MSIV Reliability Prior to Plant Trip & Assurance to Public That NRC Able to Detect Mgt Problems Early | Safe Shutdown Anticipated operational occurrence Probabilistic Risk Assessment Annual Radiological Environmental Operating Report Weak link Operability Assessment |
PLA-5094, Forwards,For Review,Change 00 to SSES Physical Security Plan.Without Encl | 24 August 1999 | Forwards,For Review,Change 00 to SSES Physical Security Plan.Without Encl | |
ML18040A974 | 8 July 1999 | Forwards Rev 30 to SSES Emergency Plan, Adding EAL to Account for Potential Conditions Associated with Dry Cask Storage Sys Being Installed at Plant | |
PLA-5072, Forwards Change Nn to SSES Physical Security Plan.Util Determined That Changes Do Not Decrease Safeguards Effectiveness of Plan,Per 10CFR50.54(p).Encl Withheld from Public Disclosure,Per 10CFR73.21 | 4 June 1999 | Forwards Change Nn to SSES Physical Security Plan.Util Determined That Changes Do Not Decrease Safeguards Effectiveness of Plan,Per 10CFR50.54(p).Encl Withheld from Public Disclosure,Per 10CFR73.21 | |
ML18040A973 | 24 May 1999 | Submits Response to RAI Re Exemption from Biennial Exercise Schedule.Changing of Drill Date Will Not Reduce Level of Emergency Preparedness at Plant | |
ML20195B218 | 20 May 1999 | Forwards Proprietary Decommissioning Status Rept for 10% Interest in Sses,Units 1 & 2.Proprietary Info Withheld,Per 10CFR2.790 | |
ML18040B290 | 30 April 1999 | Forwards Summary Rept of Safety Evaluations Approved During Period from 961024-981029,per 10CFR50.59(b).Format of Rept, Listed | Hot Short Safe Shutdown Shutdown Margin Loop seal Packing leak High Radiation Area Ultimate heat sink Grab sample Offsite Dose Calculation Manual Fire Barrier Stroke time Anticipated operational occurrence Safe Shutdown Earthquake Internal Flooding Hydrostatic Enforcement Discretion Emergency Lighting Scram Discharge Volume Moisture barrier Earthquake Fuel cladding Offsite Circuit Fire Watch Scaffolding Grace period |
PLA-5041, Forwards Proprietary & Redacted Decommissioning Rept of Financial Assurance for Util 90% Interest in Sses,Units 1 & 2,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per 10CFR2.790 | 29 March 1999 | Forwards Proprietary & Redacted Decommissioning Rept of Financial Assurance for Util 90% Interest in Sses,Units 1 & 2,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per 10CFR2.790 | |
ML17164A989 | 12 March 1999 | Informs That Util 990312 Ltr (PLA-5040) Submitted to NRC, Missing Encl C.Requests to Replace Package in Entirety with Encl | |
ML18040A969 | 12 March 1999 | Forwards Revised Proposed Amend 227 to License NPF-14, Proposing Changes to ANFB-10 Critical Power Correlation & MCPR Safety Limits | |
ML18040A972 | 11 March 1999 | Requests That Date for full-participation SSES Exercise, Scheduled for Week of 991115,be Changed Due to FEMA Region III Scheduling Conflicts.Fema Requests That Exercise Date Be Changed to Week of 001031 | |
PLA-4852, Forwards non-redacted Version of Pp&L,Inc Corporate Auditing Rept 739459-2-98,dated 980210.Informs That Document Contains Info to Be Withheld IAW 10CFR2.790 | 18 February 1999 | Forwards non-redacted Version of Pp&L,Inc Corporate Auditing Rept 739459-2-98,dated 980210.Informs That Document Contains Info to Be Withheld IAW 10CFR2.790 | |
ML18040A968 | 29 January 1999 | Requests Exemption from Requirements of 10CFR50 App E,Items IVF.2.b & C,To Allowed to Reschedule Federally Observed Full Participation Emergency Exercise for SSES from Wk of 991115 to Wk of 001031 | Exemption Request |
ML18040A967 | 29 January 1999 | Notifies That Util Implemented Severe Accident Mgt Strategy in Accordance with Ltr Dtd 950327.Emegency Plan Revs Which Were Required to Implement Strategy Were Submitted by Ltr Dtd 981125 | Exemption Request |
ML18040A965 | 12 January 1999 | Submits Addl Info Re Proposed Amend 184 to License NPF-22 for ANFB-10 Critical Power Correlation & MCPR Safety Limits | |
ML18030A102 | 16 December 1998 | Forwards Tables as Requested During 981202 Telcon Re Proposed Amend 184,dtd 980804,re ANFB-10 Critical Power Correlation & MCPR Safety Limits.Tables Provide Roadmap Identifying Applicability of References to TSs | Shutdown Margin |
ML18030A433 | 25 November 1998 | Forwards Rev 29 to SSES Emergecny Plan.Changes Has Been Made Without Commission Approval as It Does Not Decrease Effectiveness of Plan & Plan as Changed Continues to Satisfy Applicable Requirements of App E to 10CFR50 | Severe Accident Management Guideline |
ML18026A294 | 19 October 1998 | Forwards SSES ISI Outage Summary Rept for Unit 1 Tenth Refueling & Insp Outage | Hydrostatic VT-2 FLEX Liquid penetrant |
ML18030A432 | 12 October 1998 | Forwards Rev 28 to SSES Emergency Plan, IAW Requirements of 10CFR50.54q.Change Is Summarized | |
ML18030A100 | 12 October 1998 | Forwards Rev 27 to SSES Emergency Plan. Changes Become Effective Upon Implementation of Improved Tech Specs | |
PLA-4993, Forwards Change Mm to SSES Physical Security Plan.Encl Withheld,Per 10CFR73.21 | 12 October 1998 | Forwards Change Mm to SSES Physical Security Plan.Encl Withheld,Per 10CFR73.21 | |
ML18030A431 | 29 September 1998 | Forwards Rev 27 & 28 to SSES Emergency Plan | |
ML18030A099 | 8 September 1998 | Provides Response to Violations Noted in Insp Repts 50-387/98-08 & 50-388/98-08.Corrective Actions:Current Administrative Controls on Fuel Level in EDG Day Tanks Will Remain in Effect Until TS Change Is Approved | |
IR 05000387/1998008 | 8 September 1998 | Provides Response to Violations Noted in Insp Repts 50-387/98-08 & 50-388/98-08.Corrective Actions:Current Administrative Controls on Fuel Level in EDG Day Tanks Will Remain in Effect Until TS Change is Approved | |
ML18026A496 | 31 August 1998 | Responds to NRC 980731 Ltr Re Violations Noted in Insp Repts 50-387/98-03 & 50-388/98-03.Corrective Actions:Procurement & Affected User Group Personnel Visited EDG Vendor Facilities to Appraise Vendor Work Practices & Discuss Expectations | Enforcement Discretion |
IR 05000387/1998003 | 31 August 1998 | Responds to NRC 980731 Ltr Re Violations Noted in Insp Repts 50-387/98-03 & 50-388/98-03.Corrective Actions:Procurement & Affected User Group Personnel Visited EDG Vendor Facilities to Appraise Vendor Work Practices & Discuss Expectations | |
ML18017A218 | 8 July 1998 | Forwards Final Version of SSES TS Implementing Improved Tech Specs of NUREG 1433.Implementation of Proposed Amend Is Predicated on NRC Issuance of Amends & Is Proposed to Not Exceed 90 Days from Date of Amend Issuance | Safe Shutdown Shutdown Margin Reactor Vessel Water Level High Radiation Area Ultimate heat sink Stroke time Anticipated operational occurrence Post Accident Monitoring Hydrostatic Squib Qualified Offsite Circuit Abnormal operational transient Scram Discharge Volume Feedwater Controller Failure Spiral reload Battery sizing Overtravel Power Operated Valves Fuel cladding Pressure Boundary Leakage Offsite Circuit Power change Coast down Unidentified leakage Power Uprate |
ML18030A429 | 8 July 1998 | Forwards Final Version of SSES TS Implementing Improved TS of NUREG-1433.Implementation of Proposed Amend Is Predicted on NRC Issuance of Amends & Proposed to Not Exceed 90 Days from Date of Amend Issue | |
ML18026A290 | 9 June 1998 | Forwards Rev 26 to Emergency Plan IAW 10CFR50.54q.Summary of Changes Listed | Safe Shutdown Health Physics Network Earthquake Siren |
ML18026A289 | 22 May 1998 | Submits Withdrawal of Expedited Review/Approval of Tech Specs/Bases 3/4.3.7.11 & 3/4.11.2.6 & Response to Request for Addl Info Re Offgas Sys Mods | Hydrostatic Earthquake |
ML18026A494 | 12 May 1998 | Responds to NRC Request to Resubmit Proposal to Change TS for Plant,Units 1 & 2,to Support Implementation of Improved TS & to Implement Provisions of GL 86-10 Re Relocation of Plant'S Fire Protection Program from TS to Another Document | Safe Shutdown Fire Barrier Fire Protection Program |
ML17159A234 | 30 March 1998 | Forwards LER 97-007-01,per 10CFR50.73(a)(2)(i)(B).Revised LER Submitted to Modify Previous Position W/Regards to Entry Into TS 3.0.3 for Event | |
PLA-4865, Forwards Listed non-redacted Pp&L,Inc Corporate Auditing Repts.Informs That Document Contains Info to Be Withheld IAW 10CFR2.790 | 11 March 1998 | Forwards Listed non-redacted Pp&L,Inc Corporate Auditing Repts.Informs That Document Contains Info to Be Withheld IAW 10CFR2.790 | |
PLA-4856, Forwards Proposed Amends to Licenses NPF-14 & NPF-22, Revising TS to Be Consistent w/NUREG-1433,rev 1, Std TS for GE Plants,Bwr 4. Proposed TS Consistent w/NUREG-1433,rev 1, Encl | 2 March 1998 | Forwards Proposed Amends to Licenses NPF-14 & NPF-22, Revising TS to Be Consistent w/NUREG-1433,rev 1, Std TS for GE Plants,Bwr 4. Proposed TS Consistent w/NUREG-1433,rev 1, Encl | |
ML17159A178 | 2 March 1998 | Forwards Proposed Amends 203 & 161 to License NPF-14 & NPF-22,revising Tech Specs to Be Consistent w/NUREG-1433,rev 1, Std Tech Specs for GE Plants,Bwr 4. | |
PLA-4854, Provides Summary of Investigations That PP&L Performed in Response to Concerns Identified by Former Nuclear Plant Operator.Summary Requested by Cj Anderson on 980213 | 27 February 1998 | Provides Summary of Investigations That PP&L Performed in Response to Concerns Identified by Former Nuclear Plant Operator.Summary Requested by Cj Anderson on 980213 | |
ML20216B703 | 22 February 1998 | Partially Deleted Ltr Requesting Copy of OI Rept on Plant, Unit 2,case 1-96-039 | |
PLA-4851, Provides Info That Was Requested by Cj Anderson on 980213 Re Former Util Employee Concern on Radwaste Control Room Offgas Panel Alarm Testing | 18 February 1998 | Provides Info That Was Requested by Cj Anderson on 980213 Re Former Util Employee Concern on Radwaste Control Room Offgas Panel Alarm Testing | Operability Determination |
ML20203M579 | 10 February 1998 | Enters Appeal Due to Lack of Response to FOIA Request 97-473 | |
ML18030A097 | 2 February 1998 | Forwards Proprietary Response to RAI Re Proposed License Amend 209 to TS Supporting Cycle 11 Reload.Proprietary Info Withheld,Per 10CFR2.790 | |
ML20203G607 | 26 January 1998 | Forwards Redacted Version of Pp&L,Inc Corporate Auditings Interim Rept 739459-97,dtd 971015 & Affidavit Pursuant to 10CFR2.790 Justifying That Redacted Portions Be Withheld from Public Disclosure.Without Rept | |
IR 05000387/1997003 | 6 January 1998 | Provides Updated Response to Violations Noted in Insp Repts 50-387/97-03 & 50-388/97-03.Corrective Actions:Util Currently Scheduling Issuance of All Procedural Revs by End of First Quarter 1998 | |
ML18017A293 | 6 January 1998 | Provides Responses to Improved TS Section 3.8 Per 970324 NRC Rai.Schedule 980628 for Improved TS Implementation. Submittal of Revised Specifications Is Planned for Jan 1998 | Safe Shutdown Unanalyzed Condition Qualified Offsite Circuit Battery sizing Maintenance Rule Program Offsite Circuit |
ML18030A407 | 6 January 1998 | Provides Updated Response to Violations Noted in Insp Repts 50-387/97-03 & 50-388/97-03.Corrective Actions:Util Currently Scheduling Issuance of All Procedural Revs by End of First Quarter 1998 | |
PLA-4828, Expresses Appreciation for Support Received by Former Project Manager C Poslusny | 29 December 1997 | Expresses Appreciation for Support Received by Former Project Manager C Poslusny | |
IR 05000387/1997004 | 22 December 1997 | Resolves Commitments Made in Response to NOV Issued As Part of NRC Insp Repts 50-387/97-04 & 50-388/97-04 Dtd 970805. Proposed FSAR QA Program Description Changes,Reason for Changes & Basis Included for Approval | |
ML18026A490 | 22 December 1997 | Resolves Commitments Made in Response to NOV Issued as Part of NRC Insp Repts 50-387/97-04 & 50-388/97-04 Dtd 970805. Proposed FSAR QA Program Description Changes,Reason for Changes & Basis Included for Approval | |
ML20203M574 | 5 December 1997 | FOIA Request for Copy of Latest OI Rept on Susquehanna Ses Including All Exhibits & for Any Other Communication Between NRC & Susquehanna Ses/Pp&L | |
PLA-4818, Forwards Redacted Version of Pp&L,Inc Corporate Auditings Rept 739459-1-97,dtd 971201 & Affidavit Pursuant to 10CFR2.790 Justifying That Redacted Portions Be Withheld from Public Disclosure.Without Rept | 4 December 1997 | Forwards Redacted Version of Pp&L,Inc Corporate Auditings Rept 739459-1-97,dtd 971201 & Affidavit Pursuant to 10CFR2.790 Justifying That Redacted Portions Be Withheld from Public Disclosure.Without Rept |