ML20217F433 | 15 October 1999 | Forwards Rev 39 to Security Plan.Changes Do Not Decrease Effectiveness of Security Plan.Rev Withheld,Per 10CFR73.21 | |
ML20212G717 | 24 September 1999 | Submits Semiannual Status Update on Project Plans for USAR Review Project & Conversion to Its.Conversion Package Submittal Continues to Be Targeted for Aug of 2000 | Enforcement Discretion |
ML20212F512 | 20 September 1999 | Forwards Response to NRC , Preparation & Scheduling of Operator Licensing Examinations | |
ML20211N863 | 7 September 1999 | Withdraws 970814 Request for Exemption from 10CFR50,App R, Section III.G.2, Fire Protection of Safe Shutdown Capabilities | Safe Shutdown Fire Barrier Exemption Request |
ML20211K591 | 1 September 1999 | Informs That Util Reviewed Rvid Data Base,As Requested in NRC .Summary of Proposed Changes & Observed Differences Are Included in Encl Tables | Pressure and Temperature Limits Report |
ML20211L021 | 1 September 1999 | Provides Notification That License Amends 141 & 132 & Associated License Conditions 6 & 7 Have Been Fully Implemented | |
ML20211Q604 | 31 August 1999 | Forwards Rev 19 to USAR for Pingp,Per 10CFR50.71(e).Rev Brings USAR up-to-date as of 990228,though Some Info Is More Recent.Attachment 1 Contains Descriptions & Summaries of SE for Changes,Tests & Experiments,Per 10CFR50.59 | Shutdown Margin |
ML20211K593 | 31 August 1999 | Forwards License Amend Request for License SNM-2506, Proposing Change to License Conditions 6,7 & 8 & TSs App a of License by Permitting Inclusion of Bpras & Thimble Plug Devices in Sf Assemblies Stored in TN-40 Casks | |
ML20211K259 | 27 August 1999 | Forwards NSP Co Fitness for Duty Program Performance Data for Six Month Period Ending 990630 | Fitness for Duty |
ML20211C231 | 19 August 1999 | Forwards Unit 1 ISI Summary Rept,Interval 3,Period 2 Refueling Outage Dates 990425-0526,Cycle 19 971212-990526. Rept Identifies Components Examined,Exam Methods Used,Exam Number & Summarizes Results | |
ML20211B831 | 19 August 1999 | Forwards Request for Relief 8 Re Limited Exams Associated with Unit 1 Third ten-year Interval Inservice Insp Program. Licensee Requests Relief Due to Impractibility of Obtaining 100% Exam Coverage for Affected Items | Nondestructive Examination |
ML20211B571 | 19 August 1999 | Forwards Second 90-day Rept for Implementation of Voltage Based Repair Criteria at Prairie Island Unit 1.Rept Fulfills Requirements of Section 6.b of Attachment 1 to GL 95-05 | |
ML20211B056 | 18 August 1999 | Provides Addl Info on Proposed Rev to Main Steam Line Break Methodology ,in Response to NRC Staff Request Made in 990416 Telcon.Nuclear Svcs Corp Rept PIO-01-06, Analysis Rept Structural Analyses of Main Steam Check... Encl | |
ML20210G506 | 30 July 1999 | Responds to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates | |
05000282/LER-1999-007, Forwards LER 99-007-00,re Loss of CR Special Ventilation Function.One New Commitment Was Made in Rept as Indicated in Corrective Action Section Statement in Bold Italics | 23 July 1999 | Forwards LER 99-007-00,re Loss of CR Special Ventilation Function.One New Commitment Was Made in Rept as Indicated in Corrective Action Section Statement in Bold Italics | |
ML20210J499 | 22 July 1999 | Forwards Rev 18 to USAR for Pingp,Bringing USAR up-to-date as of 990228,though Some Info More Recent.Safety Evaluation Summaries Also Encl | Boric Acid Turbine Missile |
ML20209H805 | 14 July 1999 | Forwards Summary of non-modification Safety Evaluation Number 515 Re Storage of Fuel Inserts,Per Insp Rept 72-0010/99-201 | |
ML20209D418 | 7 July 1999 | Informs That Util Has Changed Listed TS Bases Pages Attached for NRC Use.Util Made No New Commitments in Ltr | Design basis earthquake Earthquake |
ML20209C395 | 1 July 1999 | Forwards Supplemental Response to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves | |
ML20209B754 | 1 July 1999 | Final Response to GL 98-01,Suppl 1 Re Y2K Readiness of Computer Sys.Sys Remediated as Required for Plant Operation. Contingency Plans Developed to Mitigate Impact of Y2K-induced Events at Key Rollover Dates | |
ML20196J894 | 30 June 1999 | Transmits Util Comments on Draft Regulatory Guide DG-1074, Steam Generator Tube Integrity. Licensee Recommends That NRC Focus on Several Important Listed Areas Considered Principal Concerns & Contentions | Backfit |
ML20209C301 | 29 June 1999 | Forwards Annual Rept of Corrections to NSP ECCS Evaluation Models,Iaw 10CFR50.46.Since All Analyses Remain in Compliance,No Reanalysis Is Required or Planned | |
ML20209B575 | 24 June 1999 | Submits Revised Relief Request for Limited Examinations Associated with Third 10-yr ISI Examination Plan.Attached Is Unit 1 Relief Request 7,rev 1 Which Addresses Limited Examinations | Hydrostatic |
ML20196F387 | 23 June 1999 | Forwards Revised Pages 71,72 & 298 of Rev 7 to NSPNAD-8102, Prairie Island Nuclear Power Plant Reload Safety Evaluation Methods for Application to PI Units, Per Discussions with Nrc.Approved Version of Rept Will Be Issued | Shutdown Margin |
05000282/LER-1999-006, Forwards LER 99-006-00 Re Discovery That Manual SI Actuation Switch Had Not Been Tested on Staggered Basis During Integrated SI Test.Two New Commitments Are Indicated in Corrective Action Section Statement in Bold Italics | 18 June 1999 | Forwards LER 99-006-00 Re Discovery That Manual SI Actuation Switch Had Not Been Tested on Staggered Basis During Integrated SI Test.Two New Commitments Are Indicated in Corrective Action Section Statement in Bold Italics | |
ML20195G428 | 9 June 1999 | Notifies That Amsac/Dss Mods Completed & TS 138/129 Has Been Fully Implemented | |
05000282/LER-1999-005, Forwards LER 99-005-00 Re Containment Inservice Purge Sys Not Isolated During Heavy Load Movement Over Fuel.Event Has Indicated That Level of Performance Expected by Mgt Has Not Yet Been Achieved | 7 June 1999 | Forwards LER 99-005-00 Re Containment Inservice Purge Sys Not Isolated During Heavy Load Movement Over Fuel.Event Has Indicated That Level of Performance Expected by Mgt Has Not Yet Been Achieved | |
ML20207F430 | 1 June 1999 | Forwards 1999 Unit 1 SG Insp Results,Per TS 4.12.E.1. Following Insp 84 Tubes Were Plugged for First Time | Boric Acid Flow Induced Vibration |
ML20196L246 | 21 May 1999 | Forwards Rev 0 to COLR for Pingp,Unit 1 Cycle 20, IAW TS Section 6.7.A.6 | |
ML20195C686 | 21 May 1999 | Forwards Rev 17 to USAR for Prairie Island Nuclear Generating Plant.Attachment 1 Contains Descriptions & Summaries of SEs for Changes,Tests & Experiments Made Under Provisions of 10CFR50.59 During Period Since Last Update | Safe Shutdown Shutdown Margin Turbine Missile |
ML20206U678 | 17 May 1999 | Forwards Revised Emergency Response Plan Implementing Procedures,Including Rev 15 to F3-3,rev 15 to F3-16,rev 14 to F3-22 & Table of Contents | |
ML20206U713 | 17 May 1999 | Forwards Revised EOF Emergency Plan Implementing Procedures, Including Table of Contents & Rev 2 to F8-10, Record Keeping in Eof. with Updating Instructions | |
ML20206T246 | 17 May 1999 | Forwards Off-Site Radiation Dose Assessment for Jan-Dec 1998, Rev 0 to Annual Radiactive Effluent Rept for 980105- 990103 & Effluent & Waste Disposal Annual Rept Solid Waste & Irradiated Fuel Shipments,Jan-Dec 1998 | |
ML20206R040 | 13 May 1999 | Forwards Application for Amends to Licenses DPR-42 & DPR-60, Removing Plant Organization Requirement,Imposed in Amend 141/132 That Plant Manager,Who Has Responsibility for Overall Safe Operation of Plant,Report to Corporate Officer | |
ML20206Q087 | 13 May 1999 | Forwards Result of Evaluation Re Ultrasonic Exams of SG Number 22 Performed in Accordance with ASME Boiler & Pressure Vessel Code Section Xi.Procedure Used for Evaluation Contained in WCAP-14166,submitted for Review | Nondestructive Examination |
ML20206F938 | 3 May 1999 | Forwards Response to NRC 990304 RAI Re GL 96-05 Program at Pingp.Licensee Commitments Are Identified in Encl as Statements in Italics | Weak link |
ML20206J385 | 3 May 1999 | Forwards 1998 Annual Radiological Environmental Monitoring Rept | |
05000282/LER-1999-004, Forwards LER 99-004-00 Re Discovery of Inadequate Sp That Demonstrates Operability of SFP Special Ventilation Sys.Two New NRC Commitments Are Contained in Corrective Action Section of Rept in Bold Italics | 3 May 1999 | Forwards LER 99-004-00 Re Discovery of Inadequate Sp That Demonstrates Operability of SFP Special Ventilation Sys.Two New NRC Commitments Are Contained in Corrective Action Section of Rept in Bold Italics | |
ML20206E176 | 28 April 1999 | Forwards Revised TS Pages for Amends 144 & 135 to Licenses DPR-42 & DPR-60,respectively,to Update Controlled Manual or File | Boric Acid Operating Basis Earthquake Pressure and Temperature Limits Report |
ML20205S322 | 20 April 1999 | Forwards Application for Amends to Licenses DPR-42 & DPR-60, Changing Implementation Date for Relocation from TS to UFSAR of Requirements in TS 3.1.E & Flooding Shutdown Requirements of TS 5.1 | |
ML20205P989 | 12 April 1999 | Requests Approval for Proposed Alternatives to Liquid Penetrant Requirements of N-518.4 of 1968 ASME Boiler & Pressure Vessel Code.Results of Analysis & Summary of Tests Performed & Tests Results Are Encl | High Radiation Area VT-2 Liquid penetrant |
ML20205Q019 | 12 April 1999 | Forwards Application for Amend to License DPR-42 & DPR-60, Relocating Shutdown Margin Requirements from TS to COLR | Shutdown Margin |
05000282/LER-1998-010, Forwards LER 98-010-01 Re Discovery That 32 App R Related MOVs Are Susceptible to Physical Damage by Fire Induced Hot Shorts.Rept Provides Addl Details on Current Plans for Completing C/As Committed to in Original LER | 8 April 1999 | Forwards LER 98-010-01 Re Discovery That 32 App R Related MOVs Are Susceptible to Physical Damage by Fire Induced Hot Shorts.Rept Provides Addl Details on Current Plans for Completing C/As Committed to in Original LER | Hot Short |
ML20205P922 | 1 April 1999 | Submits Relief Request 8,rev 0 Which Addresses Limited Exams Associated with Unit 2 Third ten-year Interval Inservice Insp Program.Util Requests Relief Per 10CFR50.55a(q)(5)(iii) Due to Impracticality of Obtaining 100% Exam Coverage | Hydrostatic Nondestructive Examination Dissimilar Metal Weld |
ML20205E837 | 31 March 1999 | Submits Four Copies of Rev 38 to Prairie Island Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Security Plan.Encl Withheld,Per 10CFR73.21 | |
ML20196K783 | 31 March 1999 | Forwards Decommissioning Funding Status Rept for Monticello & Prairie Island Nuclear Generating Plants,Per Requirements of 10CFR50.75(f)(1) | |
ML20205Q505 | 30 March 1999 | Forwards Inservice Insp Summary Rept Interval 3,Period 1 & 2 Refueling Outage Dates 981109-1229 Cycle 19,970327- 981229. Rept Identifies Components Examined,Exam Methods Used,Exam Number & Summarized Results | |
ML20205H573 | 29 March 1999 | Submits Required 1998 Actual & 1999 Projected Cash Flow Statements for Monticello Nuclear Generating Plant & PINGP, Units 1 & 2.Encl Contains Proprietary Info.Proprietary Info Withheld,Per 10CFR2.790(b)(1) | |
ML20205C656 | 26 March 1999 | Submits Semiannual Update on Project Plans for USAR Review Project & Conversion to ITS | Missed surveillance |
ML20204H337 | 19 March 1999 | Forwards Application for Amend to Licenses DPR-42 & DPR-60, Removing Dates of Two NRC SERs & Correcting Date of One SER Listed in Section 2.C.4, Fire Protection | Fire Protection Program |