Semantic search

Jump to navigation Jump to search
 Start dateTitleTopic
05000390/FIN-2018003-0130 September 2018 23:59:59Configuration Control Error Results in Actual Auxiliary Building Internal Flooding EventInternal Flooding
05000390/FIN-2018003-0330 September 2018 23:59:59Failure to Collect Compensatory Samples for an Out-of-Service Effluent MonitorOffsite Dose Calculation Manual
05000390/FIN-2018410-0130 June 2018 23:59:59Security
05000390/FIN-2017002-0230 June 2017 23:59:59Failure to Implement Clearance on Containment Isolation Valve Results in TS 3.6.3 Violation
05000390/FIN-2016001-0431 March 2016 23:59:59Failure to Place the RHR System in ECCSStandby Mode Prior to Exceeding an RCS Temperature of 212 oF
05000390/FIN-2015004-0331 December 2015 23:59:59Failure to Comply with Source Range Neutron Flux Channel Technical Specification Requiprements
05000390/FIN-2015002-0230 June 2015 23:59:59Failure to Track ApplicableTechnical Specification Action Statement for Residual Heat Removal System
05000390/FIN-2013002-0131 March 2013 23:59:59Failure to Correctly Implement Procedure for Pressurizer Pressure Channel CalibrationSignificance Determination Process
05000390/FIN-2012002-0231 March 2012 23:59:59Failur to Comply with Technical Specification 3.4.12 by Allowing a Safety Injection Pump to Inject Into the RCS in Mode 5Significance Determination Process
05000390/FIN-2010003-0230 June 2010 23:59:59Lack of Procedure Implementation Results in 1B EDG being started with 15 Cylinder Plugs OpenSignificance Determination Process
05000390/FIN-2008005-0331 December 2008 23:59:59Performing Non-Authorized Activities on Exciter Field Breaker Results in Reactor TripSignificance Determination Process