05000390/FIN-2018003-01 | 30 September 2018 23:59:59 | Configuration Control Error Results in Actual Auxiliary Building Internal Flooding Event | Internal Flooding |
05000390/FIN-2018003-03 | 30 September 2018 23:59:59 | Failure to Collect Compensatory Samples for an Out-of-Service Effluent Monitor | Offsite Dose Calculation Manual |
05000390/FIN-2018410-01 | 30 June 2018 23:59:59 | Security | |
05000390/FIN-2017002-02 | 30 June 2017 23:59:59 | Failure to Implement Clearance on Containment Isolation Valve Results in TS 3.6.3 Violation | |
05000390/FIN-2016001-04 | 31 March 2016 23:59:59 | Failure to Place the RHR System in ECCSStandby Mode Prior to Exceeding an RCS Temperature of 212 oF | |
05000390/FIN-2015004-03 | 31 December 2015 23:59:59 | Failure to Comply with Source Range Neutron Flux Channel Technical Specification Requiprements | |
05000390/FIN-2015002-02 | 30 June 2015 23:59:59 | Failure to Track ApplicableTechnical Specification Action Statement for Residual Heat Removal System | |
05000390/FIN-2013002-01 | 31 March 2013 23:59:59 | Failure to Correctly Implement Procedure for Pressurizer Pressure Channel Calibration | Significance Determination Process |
05000390/FIN-2012002-02 | 31 March 2012 23:59:59 | Failur to Comply with Technical Specification 3.4.12 by Allowing a Safety Injection Pump to Inject Into the RCS in Mode 5 | Significance Determination Process |
05000390/FIN-2010003-02 | 30 June 2010 23:59:59 | Lack of Procedure Implementation Results in 1B EDG being started with 15 Cylinder Plugs Open | Significance Determination Process |
05000390/FIN-2008005-03 | 31 December 2008 23:59:59 | Performing Non-Authorized Activities on Exciter Field Breaker Results in Reactor Trip | Significance Determination Process |