Semantic search
Jump to navigation
Jump to search
Start date | Title | Topic | |
---|---|---|---|
05000321/FIN-2014004-03 | 30 September 2014 23:59:59 | Failure to Promptly Identify Malfunction of HPCI Exhaust Drain Pot Level Instrumentation | Significance Determination Process |
05000321/FIN-2014002-03 | 31 March 2014 23:59:59 | Failure to Operate the Unit 2 Master Feedwater Controller In Accordance With Procedures | Internal Flooding |
05000321/FIN-2012004-04 | 30 September 2012 23:59:59 | Failure to follow clearance procedures for returning the A main control room air conditioning unit to service following maintenance | Significance Determination Process |
05000321/FIN-2012403-01 | 31 March 2012 23:59:59 | Security | |
05000321/FIN-2009002-01 | 31 March 2009 23:59:59 | Improper Core Drill Location Results in Secondary Containment Inoperability | |
05000321/FIN-2008002-02 | 31 March 2008 23:59:59 | Failure to Follow Equipment Clearance Procedures Results in Control Room Ventilation Inoperability |