05000400/FIN-2018002-04 | 30 June 2018 23:59:59 | Failure to Implement Adequate Steam Generator Blowdown Demineralizer Control Procedures | |
05000400/FIN-2012003-02 | 30 June 2012 23:59:59 | Failure to Follow Fuel Handling Procedure | Time to boil Significance Determination Process Fuel cladding |
05000400/FIN-2011004-01 | 30 September 2011 23:59:59 | Inadvertent Actuation of Turbine Driven Auxiliary Feedwater Pump Caused by Inadequate Procedure | Significance Determination Process |
05000400/FIN-2010005-02 | 31 December 2010 23:59:59 | Failure to Follow Procedure Results in Emergency Safeguards Sequencer Actuation and Safety Injection Signal (SIS) while the Plant was in Mode 6 | Significance Determination Process |
05000400/FIN-2010005-05 | 31 December 2010 23:59:59 | Failure to Follow Procedure to Properly Align the MOC Switch Contacts Associated With Breaker 1A-6 Results in Actuation of the B MDAFW Pump | Significance Determination Process |
05000400/FIN-2010003-01 | 30 June 2010 23:59:59 | Failure to Follow Procedure to Install the Load Block 5 Auxiliary Relay | Significance Determination Process |