Semantic search
Jump to navigation
Jump to search
Start date | Title | Topic | |
---|---|---|---|
05000416/FIN-2018002-07 | 30 June 2018 23:59:59 | Loss of Shutdown Cooling | |
05000416/FIN-2018002-05 | 30 June 2018 23:59:59 | Failure to Follow Procedure Requirements Resulting in Unplanned Dose | |
05000416/FIN-2016007-05 | 31 December 2016 23:59:59 | Failure to Establish Adequate Procedures for Building Sandbag Barriers | Significance Determination Process |
05000416/FIN-2015007-11 | 31 December 2015 23:59:59 | Failure to Implement Equipment Control Procedures for Loose Items in Containment | Significance Determination Process Foreign Material Exclusion |
05000416/FIN-2015008-03 | 31 December 2015 23:59:59 | Failure to Declare Secondary Containment Inoperable Based on Failed Surveillance Testing | Significance Determination Process |
05000416/FIN-2015002-01 | 30 June 2015 23:59:59 | Failure to Have Appropriate Instructions Resulted in the Unplanned Unavailability of the Reactor Core Isolation Cooling System | Significance Determination Process Maintenance Rule Program |
05000416/FIN-2015002-02 | 30 June 2015 23:59:59 | Failure to Identify High Vibration on the Division 3 EDG Soak Back Oil Pump | Significance Determination Process Maintenance Rule Program |
05000416/FIN-2015001-02 | 31 March 2015 23:59:59 | Failure to Follow a Procedure Resulting in the Unplanned Inoperability of the Reactor Core Isolation Cooling System | Significance Determination Process |
05000416/FIN-2013005-03 | 31 December 2013 23:59:59 | Entry Into A High Radiation Area Without A Required Radiation Monitoring Device | High Radiation Area Significance Determination Process Substantial potential for an overexposure |
05000416/FIN-2012404-03 | 30 September 2012 23:59:59 | Security | |
05000416/FIN-2012003-06 | 30 June 2012 23:59:59 | Failure to Follow Procedure Results in Loss of Decay Heat Removal to the Spent Fuel Pool | |
05000416/FIN-2011003-08 | 30 June 2011 23:59:59 | Failure to Follow a Procedure Resulting in the Inoperability of the Reactor Core Isolation Cooling System Primary Containment Isolation Valve | |
05000416/FIN-2011003-07 | 30 June 2011 23:59:59 | Failure to Assure Configuration Control of Safety Related Systems | |
05000416/FIN-2010405-01 | 31 December 2010 23:59:59 | Security | |
05000416/FIN-2010003-02 | 30 June 2010 23:59:59 | Failure to Follow Procedure Results in Loss of Decay Heat Removal to the Spent Fuel Pool | Significance Determination Process |
05000416/FIN-2010002-04 | 31 March 2010 23:59:59 | Failure to Follow Procedures Results in Damage to Fuel Assembly and Fuel Handling Platform Mast | Significance Determination Process Fuel cladding |
05000416/FIN-2009003-05 | 30 June 2009 23:59:59 | Failure to Respond to Control Room Alarms in Accordance with Plant Procedures | |
05000416/FIN-2009002-03 | 31 March 2009 23:59:59 | Failure to Enter a Limiting Condition for Operation for Primary Containment Isolation Valves | Significance Determination Process |
05000416/FIN-2008005-08 | 31 December 2008 23:59:59 | Automatic Reactor Scram Caused by an Operator Inadvertently Closing the Steam Supply Valves to Reactor Feed Pump Turbine | Significance Determination Process |
05000416/FIN-2008004-01 | 30 September 2008 23:59:59 | Failure to Monitor Performance of Four Maintenance Rule Systems | Significance Determination Process Maintenance Rule Program |
05000416/FIN-2008003-02 | 30 June 2008 23:59:59 | Failure to Recognize the Division Iii Diesel Generator Being NON-FUNCTIONAL | Significance Determination Process |
05000416/FIN-2008002-02 | 31 March 2008 23:59:59 | Failure to Properly Implement a Compensatory Fire Watch Protection Procedures | Significance Determination Process Fire Protection Program Fire Watch |