05000298/FIN-2016004-01 | 31 December 2016 23:59:59 | Failure to Maintain Reactor Vessel Assembly Procedure to Ensure Adequate Moisture Separator Shielding | Significance Determination Process Substantial potential for an overexposure |
05000298/FIN-2015003-05 | 30 September 2015 23:59:59 | Failure to Follow Primary Containment Atmosphere Sampling Procedure | Grab sample Post Accident Monitoring Significance Determination Process Maintenance Rule Program |
05000298/FIN-2015001-01 | 31 March 2015 23:59:59 | Inadequate Operations Procedure | Significance Determination Process Maintenance Rule Program |
05000298/FIN-2014004-01 | 30 September 2014 23:59:59 | Failure to Follow Operability Procedure | Tornado Missile Significance Determination Process Maintenance Rule Program |
05000298/FIN-2014002-04 | 31 March 2014 23:59:59 | Failure to Follow Tagout Procedure | Significance Determination Process Fuel cladding |
05000298/FIN-2013005-04 | 31 December 2013 23:59:59 | Failure to Implement a Radiation Protection Procedure | Significance Determination Process Substantial potential for overexposure |
05000298/FIN-2012002-03 | 31 March 2012 23:59:59 | Failure to Appropriately Manage Risk for Maintenance in the Stations Switchyard | Significance Determination Process |
05000298/FIN-2011005-03 | 31 December 2011 23:59:59 | Failure to Follow Procedures for Dose Rate Alarms Received by Two Individuals | Significance Determination Process Substantial potential for an overexposure |
05000298/FIN-2011004-05 | 30 September 2011 23:59:59 | Failure to Follow Procedure Results in Personnel Contamination | Significance Determination Process Substantial potential for overexposure |
05000298/FIN-2011003-05 | 30 June 2011 23:59:59 | Failure to Follow Radiation Work Permit Requirements | High Radiation Area Significance Determination Process Substantial potential for an overexposure |
05000298/FIN-2011003-08 | 30 June 2011 23:59:59 | Failure to Follow Procedure Results in Degraded Emergency Diesel Generator | |
05000298/FIN-2011008-03 | 30 June 2011 23:59:59 | Failure to Implement Human Performance Procedure | Significance Determination Process Substantial potential for an overexposure |
05000298/FIN-2011008-06 | 30 June 2011 23:59:59 | Failure to Follow Radiation Protection Job Coverage Procedures | Significance Determination Process Substantial potential for an overexposure |
05000298/FIN-2010003-03 | 30 June 2010 23:59:59 | Work Preparation Activities Cause Unplanned Increase in Reactor Power | Significance Determination Process |
05000298/FIN-2009005-07 | 31 December 2009 23:59:59 | Procedure Violation Results in Loss of Fuel Pool Cooling | Significance Determination Process Fuel cladding |
05000298/FIN-2009005-12 | 31 December 2009 23:59:59 | Failure to Follow Procedure For Control of Material | |
05000298/FIN-2009005-09 | 31 December 2009 23:59:59 | Failure to Follow Radiation Work Permit Requirements in Two Instances | Significance Determination Process |
05000298/FIN-2009005-06 | 31 December 2009 23:59:59 | Maintenance Error Results in Recirculation Pump Trip | Significance Determination Process |
05000298/FIN-2009005-01 | 31 December 2009 23:59:59 | Failure to Follow Surveillance Procedure Causes Near Toxic Gas Release | Fire Protection Program |
05000298/FIN-2009003-03 | 30 June 2009 23:59:59 | Inadequate Tagout Results in Draining of Turbine Equipment Cooling System | |
05000298/FIN-2009002-05 | 31 March 2009 23:59:59 | Control Room Envelope Door Left Open Results in Loss of Safety Function (Section 4OA3) | |
05000298/FIN-2008005-05 | 31 December 2008 23:59:59 | Procedure Violation Causes Augmented Off-gas System Isoloation | Significance Determination Process |
05000298/FIN-2008004-02 | 30 September 2008 23:59:59 | Operator Error Results in Uncontrolled Reactivity Addition | Significance Determination Process |
05000298/FIN-2008004-04 | 30 September 2008 23:59:59 | Failure to Restore Standby Gas System to Standby Lineup | |
05000298/FIN-2008003-05 | 30 June 2008 23:59:59 | Failure to Follow Work Control Program Procedures | Significance Determination Process |