Semantic search
Jump to navigation
Jump to search
Start date | Title | Topic | |
---|---|---|---|
05000461/FIN-2018050-02 | 30 June 2018 23:59:59 | Failure to Promptly Identifya Condition Adverse to Quality | Condition Adverse to Quality |
05000461/FIN-2017002-03 | 30 June 2017 23:59:59 | Unexpected Start of the Division 3 Emergency Diesel Generato | |
05000461/FIN-2017001-03 | 31 March 2017 23:59:59 | Failure to Develop and Review a Worker Tag Out | |
05000461/FIN-2016003-01 | 30 September 2016 23:59:59 | Failure to Scope Fuel Building Ventilation Pressure Control into Maintenance Rule | Significance Determination Process Maintenance Rule Program Fuel cladding |
05000461/FIN-2014004-01 | 30 September 2014 23:59:59 | Exceeded Technical Specification Allowed Outage Time for Electrical Power Systems Due to Auxiliary Equipment Out of Service | Significance Determination Process |
05000461/FIN-2013005-05 | 31 December 2013 23:59:59 | Failure to Assess and Manage Risk Associated with the Performance of Surveillance Testing on Average Power Range Monitors | Significance Determination Process Incremental Core Damage Probability Deficit |
05000461/FIN-2012004-02 | 30 September 2012 23:59:59 | Failure to Perform Adequate Past Operability Evaluations for Emergency Core Cooling System Relief Valves | Past operability |
05000461/FIN-2011005-05 | 31 December 2011 23:59:59 | Failure to Implement Appropriate Radiological Controls for the Removal of Insulation in a Posted High Contamination Area | Substantial potential for overexposure |
05000461/FIN-2011002-01 | 31 March 2011 23:59:59 | Failure to Control Transient Combustible Materials in Accordance with Fire Protection Program | Safe Shutdown Significance Determination Process Fire Protection Program |
05000461/FIN-2010005-01 | 31 December 2010 23:59:59 | Failure to Control Transient Combustible Materials in Accordance with Fire Protection Program | Safe Shutdown Significance Determination Process Fire Protection Program |