Start date | Title | Topic | |
---|---|---|---|
05000455/FIN-2018002-01 | 30 June 2018 23:59:59 | Overspeed Trip of 2B Auxiliary Feedwater Pump During Surveillance | |
05000455/FIN-2017004-01 | 31 December 2017 23:59:59 | Fire Barrier Impaired without Authorization | Fire Barrier Significance Determination Process Fire Protection Program |
05000454/FIN-2016003-01 | 30 September 2016 23:59:59 | DOST Flood Barrier Door Left Open | Significance Determination Process Large early release frequency |
05000455/FIN-2016003-02 | 30 September 2016 23:59:59 | Failure to Use Alteration Log Resulted in Fuel Oil Leak | Significance Determination Process |
05000454/FIN-2015004-01 | 31 December 2015 23:59:59 | Inaccurate Technical Basis for Operability Evaluation of Reactor Head Flange Damage | Time of Discovery Significance Determination Process |
05000454/FIN-2015007-01 | 30 September 2015 23:59:59 | Failure to Evaluate the Impact of a FLEX-Related Configuration Change on Available DG Fuel Oil Margin | Mission time FLEX |
05000454/FIN-2013007-02 | 30 September 2013 23:59:59 | Failure to Properly Assess Operability of the 2A EDG Following Post-Modification Testing | Significance Determination Process Maintenance Rule Program |
05000454/FIN-2013003-02 | 30 June 2013 23:59:59 | Failure to Establish a Procedure to Control the Spent Fuel Pool Cooling System | Fuel cladding |
05000454/FIN-2013002-02 | 31 March 2013 23:59:59 | Failure to Properly Scope All Pertinent External Flood Protection Features into Walkdown Lists in Accordance with Industry Guidance NEI 12-07 | |
05000454/FIN-2012003-02 | 30 June 2012 23:59:59 | Failure to Have Instructions Appropriate to the Circumstances | |
05000455/FIN-2011011-01 | 31 March 2011 23:59:59 | Self-Revealing Failure of the 2A Diesel Generator Upper Lube Oil Cooler | Significance Determination Process |
05000454/FIN-2008005-02 | 31 December 2008 23:59:59 | Failure to Evaluate Radiological Hazards for Airborne Radioactivitity |