Semantic search

Jump to navigation Jump to search
 Start dateTitleTopic
05000259/FIN-2018412-0130 June 2018 23:59:59Security
05000259/FIN-2017003-0230 September 2017 23:59:59Failure to Maintain Intake Building Flood Barrier
05000259/FIN-2017002-0130 June 2017 23:59:59Inadequate Fire Risk Evaluation for Postulated Fires Affecting EECW Strainers
05000259/FIN-2017001-0331 March 2017 23:59:59Failure to Perform Airborne Radioactivity Surveys
05000259/FIN-2017406-0131 March 2017 23:59:59Security
05000259/FIN-2013011-0430 June 2013 23:59:59Two BFN Assistant Unit Operators Closed and Danger Tagged the A1 RHRSW Pump Manual Discharge Valve Instead of the Required A2 RHRSW Pump Discharge Valve
05000260/FIN-2013002-0231 March 2013 23:59:59Failure to Follow Operating Procedure Guidance Resulted in Unit 2 Reactor Scram
05000259/FIN-2010002-0331 March 2010 23:59:59Operators Failed to Correctly Monitor and Assess RPV Beltline Temperatures During RPV Hydrostatic/In-service Leak TestHydrostatic
05000259/FIN-2009003-0330 June 2009 23:59:59Failure to Comply with the Requirements of an RWP by Entering a Posted High Radiation AreaHigh Radiation Area
Significance Determination Process
Substantial potential for overexposure