Start date | Title | Topic | |
---|---|---|---|
05000313/FIN-2018002-01 | 30 June 2018 23:59:59 | Failure to Implement Procedural Guidance to Close Spent Fuel Pool Cooler Outlet Crosstie Valve | |
05000313/FIN-2017002-03 | 30 June 2017 23:59:59 | Failure to Comply with ECCS Technical Speci fications | |
05000313/FIN-2017001-01 | 31 March 2017 23:59:59 | Failure to Identify Damaged Lugs | Significance Determination Process |
05000313/FIN-2016004-01 | 31 December 2016 23:59:59 | Failure to Pre-plan Walkdown to Avoid Impacting Safety Bus | Significance Determination Process Fuel cladding |
05000368/FIN-2016001-04 | 31 March 2016 23:59:59 | Failure to Inject Service Water with Corrosion Inhibitors during Refueling Outages | Significance Determination Process |
05000313/FIN-2015004-02 | 31 December 2015 23:59:59 | Failure to Identify and Correct Rain Water Accumulation in the Emergency Diesel Generator System Exhausts | Condition Adverse to Quality |
05000368/FIN-2015003-01 | 30 September 2015 23:59:59 | Failure to Follow Procedure Results in Increased Reactor Coolant Activity | Significance Determination Process |
05000368/FIN-2014005-01 | 31 December 2014 23:59:59 | Failure to Develop Adequate Guidance for Extreme Damage Mitigation | Significance Determination Process B.5.b Mitigating Strategies |
05000313/FIN-2013003-02 | 30 June 2013 23:59:59 | Failure to Correctly Install Control Room Emergency Chiller Supply Breaker | Significance Determination Process |
05000313/FIN-2012005-05 | 31 December 2012 23:59:59 | Radiation Workers Failed to Follow High Radiation Area Procedure | High Radiation Area Significance Determination Process Substantial potential for overexposure |
05000313/FIN-2011003-01 | 30 June 2011 23:59:59 | Failure to Follow Compliance Work Order for Corrective Maintenance on Safety Related Equipment | |
05000313/FIN-2010004-04 | 30 September 2010 23:59:59 | Failure to Follow Station Work Control Procedure Results in Unavailable Equipment | |
05000313/FIN-2010004-01 | 30 September 2010 23:59:59 | Excessive Overlap of Unit 2 Written Examinations | Significance Determination Process |
05000313/FIN-2009002-03 | 31 March 2009 23:59:59 | Failure to Provide Complete and Accurate Information to the NRC Following a Plant Trip | |
05000313/FIN-2009002-04 | 31 March 2009 23:59:59 | Failure to Follow Procedure for Use of a Torque Amplifying Device on a Valve in the Generator Hydrogen System | Significance Determination Process |
05000313/FIN-2008005-05 | 31 December 2008 23:59:59 | Failure to Correct and Prevent Recurrence of a Significant Condition Adverse to Quality Associated with Fires | Condition Adverse to Quality Significance Determination Process |
05000313/FIN-2008004-03 | 30 September 2008 23:59:59 | Failure of Feedwater Heater High Level Drain Valve Due to Maintenance (Section 4OA3) | Significance Determination Process |
05000313/FIN-2008003-06 | 30 June 2008 23:59:59 | Failure to Follow Procedure When Exiting the RCA | Significance Determination Process Substantial potential for overexposure |