Site | Start date | Title | Topic | |
---|---|---|---|---|
05000369/FIN-2018012-01 | Mcguire McGuire | 30 September 2018 23:59:59 | Failure to Translate Seismic Mounting Requirements for 125 VDC Vital Batteries into Installation and Replacement Procedure | |
05000369/FIN-2018003-01 | Mcguire McGuire | 30 September 2018 23:59:59 | Failure to Adequately Document the Basis for a Change to the Emergency Plan | |
05000369/FIN-2018411-01 | Mcguire McGuire | 30 September 2018 23:59:59 | Security | |
05000400/FIN-2018003-01 | Harris | 30 September 2018 23:59:59 | Failure to Implement Adequate Periodic Exercising of Turbine Trip Solenoid Operated Valves | |
05000324/FIN-2018411-01 | Brunswick | 30 September 2018 23:59:59 | Security | |
05000400/FIN-2018002-07 | Harris | 30 June 2018 23:59:59 | Minor Violation | |
05000324/FIN-2018011-02 | Brunswick | 30 June 2018 23:59:59 | Failure to Evaluate Effects of MOV Space Heaters on Qualified Life | |
05000400/FIN-2018002-04 | Harris | 30 June 2018 23:59:59 | Failure to Implement Adequate Steam Generator Blowdown Demineralizer Control Procedures | |
05000324/FIN-2018011-03 | Brunswick | 30 June 2018 23:59:59 | Potential Unjustified Activation Energy for Rosemont Transmitters | |
05000400/FIN-2018002-01 | Harris | 30 June 2018 23:59:59 | Failure to Promptly Identify and Correct a Condition Adverse to Quality For a Through-Wall Leak in the ESW Screen Wash Piping | Condition Adverse to Quality Through-Wall Leak |
05000400/FIN-2018002-06 | Harris | 30 June 2018 23:59:59 | Failure to Implement Viable Compensatory Actions with Seismic Monitoring System Out of Service for Planned Preventive Maintenance | |
05000400/FIN-2018002-03 | Harris | 30 June 2018 23:59:59 | Failure to Adequately Document Changes to the Emergency Plan | |
05000400/FIN-2018002-05 | Harris | 30 June 2018 23:59:59 | Failure to Follow Secondary Water Chemistry Plan for Elevated Levels of Secondary Water Impurities | Power change |
05000400/FIN-2018002-02 | Harris | 30 June 2018 23:59:59 | Inadequate Fire Brigade Performance Assessment of Announced Fire Drill | |
05000324/FIN-2018002-02 | Brunswick | 30 June 2018 23:59:59 | Enforcement Action 18-080: Implementation of EGM 11-003, Revision 3, Enforcement Guidance Memorandum on Dispositioning Boiling Water Reactor Licensee Noncompliance with Technical Specification Containment Requirements during Operations with a Potential for Draining the Reactor Vessel (OPDRV) | Enforcement Discretion |
05000324/FIN-2018011-01 | Brunswick | 30 June 2018 23:59:59 | Failure to Justify Qualified Life Extension of ASCO Solenoid Operated Valves | |
05000369/FIN-2018410-02 | Mcguire McGuire | 30 June 2018 23:59:59 | Security | |
05000369/FIN-2018410-01 | Mcguire McGuire | 30 June 2018 23:59:59 | Security | |
05000369/FIN-2018011-01 | Mcguire McGuire | 30 June 2018 23:59:59 | Question about treatment of well-sealed, robustly secured cabinets in the Fire PRA | |
05000369/FIN-2018002-01 | McGuire | 30 June 2018 23:59:59 | Licensee-Identified Violation | |
05000325/FIN-2018002-01 | Brunswick | 30 June 2018 23:59:59 | Automatic Reactor Trip due to Perceived Loss of Stator Cooling Water | |
05000324/FIN-2018001-01 | Brunswick | 31 March 2018 23:59:59 | Inadequate Instruction to Perform Inspections on Emergency Ventilation Dampers | |
05000369/FIN-2018001-01 | McGuire | 31 March 2018 23:59:59 | Non-conservative Change to Core Exit Thermocouple (CET) Acceptance Criteria in Procedure PT/1/A/4600/003 D, Monthly Surveillance Items | |
05000400/FIN-2018001-01 | Harris | 31 March 2018 23:59:59 | Adequacy of Fire Brigade Response During Fire Dril | |
05000369/FIN-2018010-02 | Mcguire McGuire | 31 March 2018 23:59:59 | Failure to Update the FSAR With Pertinent Design Information | |
05000369/FIN-2018010-01 | Mcguire McGuire | 31 March 2018 23:59:59 | Failure to Update Offsite Circuit Operability Limit for Single Busline Alignment | Offsite Circuit |
05000369/FIN-2018001-02 | McGuire | 31 March 2018 23:59:59 | Failure to Adequately Implement the Solid State Protection System(SSPS)Test Procedure Resulted in a Unit 1 Reactor Trip | |
05000400/FIN-2018410-01 | Harris | 31 March 2018 23:59:59 | Security | |
05000324/FIN-2017004-01 | Brunswick | 31 December 2017 23:59:59 | Loss of Emergency 4160V Bus Due to Failure to Implement Procedure | |
05000324/FIN-2017004-02 | Brunswick | 31 December 2017 23:59:59 | Licensee-Identified Violation | Safe Shutdown Significance Determination Process Fire Protection Program Fire Watch Grace period |
05000369/FIN-2017003-01 | Mcguire McGuire | 30 September 2017 23:59:59 | Technical Specification (TS) Required Shutdown Due to Reactor Coolant System (RCS) Leakage | Enforcement Discretion Probabilistic Risk Assessment Pressure Boundary Leakage Pressure boundary leak |
05000400/FIN-2017003-03 | Harris | 30 September 2017 23:59:59 | Licensee-Identified Violation | Significance Determination Process |
05000400/FIN-2017003-02 | Harris | 30 September 2017 23:59:59 | Review of Removal of the Technical Support Center (TSC) Temporary Diesel Generator | Significance Determination Process |
05000400/FIN-2017003-01 | Harris | 30 September 2017 23:59:59 | Incomplete and Inaccurate Emergency Action Level Submittals | Significance Determination Process |
05000324/FIN-2017003-01 | Brunswick | 30 September 2017 23:59:59 | Licensee-Identified Violation | |
05000324/FIN-2017002-02 | Brunswick | 30 June 2017 23:59:59 | Licensee-Identified Violation | Significance Determination Process |
05000324/FIN-2017002-01 | Brunswick | 30 June 2017 23:59:59 | Implementation of EGM 11- 003, Revision 3, Enforcement Guidance Memorandum on Dispositioning Boiling Water Reactor Licensee Noncompliance with Technical Specification Containment Requirements During Operations with a Potential for Draining the Reactor Vessel | Enforcement Discretion |
05000400/FIN-2017002-02 | Harris | 30 June 2017 23:59:59 | B ESCW Chiller Failure to Start | |
05000400/FIN-2017002-01 | Harris | 30 June 2017 23:59:59 | Evaluate Fire Protection Discrepancies in RHR/CS Pump Rooms | |
05000369/FIN-2017002-01 | Mcguire McGuire | 30 June 2017 23:59:59 | Inadequate Survey Results in Unposted HRA | High Radiation Area Significance Determination Process Substantial potential for overexposure |
05000324/FIN-2017404-01 | Brunswick | 30 June 2017 23:59:59 | Security | |
05000325/FIN-2017009-01 | Brunswick | 30 June 2017 23:59:59 | Inoperability of EDG1 due to Cyclic Fatigue Failure of Hydraulic Fuel Rack Control | Condition Adverse to Quality |
05000324/FIN-2017001-03 | Brunswick | 31 March 2017 23:59:59 | Failure to Install Flood Barrier Seals Around the EDG 2 Four -Day Fuel Oil Tank Vents | |
05000324/FIN-2017007-01 | Brunswick | 31 March 2017 23:59:59 | Failure to Correct a Nonfunctional Fire Door | Fire Barrier Significance Determination Process |
05000400/FIN-2017001-01 | Harris | 31 March 2017 23:59:59 | Licensee-Identified Violation | Internal Flooding Significance Determination Process |
05000324/FIN-2017001-01 | Brunswick | 31 March 2017 23:59:59 | Nonfunctional Sprinklers in the Service Water Building Without Compensatory Measures | Safe Shutdown Significance Determination Process Fire Protection Program Hourly Fire Watch Scaffolding |
05000369/FIN-2017001-01 | McGuire | 31 March 2017 23:59:59 | Failure to Adequately Control Transient Combustibles Using a Receptacle with a Self-Closing Lid | Safe Shutdown Fire Protection Program |
05000324/FIN-2017001-02 | Brunswick | 31 March 2017 23:59:59 | Failure to Control a Temporary Fire Ignition Source Near the Unit 2 Standby Liquid Control Pump Motor and Cables | Continuous fire watch |
05000369/FIN-2017007-01 | Mcguire McGuire | 31 March 2017 23:59:59 | Failure to Translate Required Gasket Replacement Requirements into Limit Switch Maintenance Manual | Significance Determination Process |
05000324/FIN-2017001-05 | Brunswick | 31 March 2017 23:59:59 | Licensee-Identified Violation |