05000369/FIN-2018012-01Mcguire
McGuire
30 September 2018 23:59:59Failure to Translate Seismic Mounting Requirements for 125 VDC Vital Batteries into Installation and Replacement Procedure
05000369/FIN-2018003-01Mcguire
McGuire
30 September 2018 23:59:59Failure to Adequately Document the Basis for a Change to the Emergency Plan
05000369/FIN-2018411-01Mcguire
McGuire
30 September 2018 23:59:59Security
05000400/FIN-2018003-01Harris30 September 2018 23:59:59Failure to Implement Adequate Periodic Exercising of Turbine Trip Solenoid Operated Valves
05000324/FIN-2018411-01Brunswick30 September 2018 23:59:59Security
05000400/FIN-2018002-07Harris30 June 2018 23:59:59Minor Violation
05000324/FIN-2018011-02Brunswick30 June 2018 23:59:59Failure to Evaluate Effects of MOV Space Heaters on Qualified Life
05000400/FIN-2018002-04Harris30 June 2018 23:59:59Failure to Implement Adequate Steam Generator Blowdown Demineralizer Control Procedures
05000324/FIN-2018011-03Brunswick30 June 2018 23:59:59Potential Unjustified Activation Energy for Rosemont Transmitters
05000400/FIN-2018002-01Harris30 June 2018 23:59:59Failure to Promptly Identify and Correct a Condition Adverse to Quality For a Through-Wall Leak in the ESW Screen Wash PipingCondition Adverse to Quality
Through-Wall Leak
05000400/FIN-2018002-06Harris30 June 2018 23:59:59Failure to Implement Viable Compensatory Actions with Seismic Monitoring System Out of Service for Planned Preventive Maintenance
05000400/FIN-2018002-03Harris30 June 2018 23:59:59Failure to Adequately Document Changes to the Emergency Plan
05000400/FIN-2018002-05Harris30 June 2018 23:59:59Failure to Follow Secondary Water Chemistry Plan for Elevated Levels of Secondary Water ImpuritiesPower change
05000400/FIN-2018002-02Harris30 June 2018 23:59:59Inadequate Fire Brigade Performance Assessment of Announced Fire Drill
05000324/FIN-2018002-02Brunswick30 June 2018 23:59:59Enforcement Action 18-080: Implementation of EGM 11-003, Revision 3, Enforcement Guidance Memorandum on Dispositioning Boiling Water Reactor Licensee Noncompliance with Technical Specification Containment Requirements during Operations with a Potential for Draining the Reactor Vessel (OPDRV)Enforcement Discretion
05000324/FIN-2018011-01Brunswick30 June 2018 23:59:59Failure to Justify Qualified Life Extension of ASCO Solenoid Operated Valves
05000369/FIN-2018410-02Mcguire
McGuire
30 June 2018 23:59:59Security
05000369/FIN-2018410-01Mcguire
McGuire
30 June 2018 23:59:59Security
05000369/FIN-2018011-01Mcguire
McGuire
30 June 2018 23:59:59Question about treatment of well-sealed, robustly secured cabinets in the Fire PRA
05000369/FIN-2018002-01McGuire30 June 2018 23:59:59Licensee-Identified Violation
05000325/FIN-2018002-01Brunswick30 June 2018 23:59:59Automatic Reactor Trip due to Perceived Loss of Stator Cooling Water
05000324/FIN-2018001-01Brunswick31 March 2018 23:59:59Inadequate Instruction to Perform Inspections on Emergency Ventilation Dampers
05000369/FIN-2018001-01McGuire31 March 2018 23:59:59Non-conservative Change to Core Exit Thermocouple (CET) Acceptance Criteria in Procedure PT/1/A/4600/003 D, Monthly Surveillance Items
05000400/FIN-2018001-01Harris31 March 2018 23:59:59Adequacy of Fire Brigade Response During Fire Dril
05000369/FIN-2018010-02Mcguire
McGuire
31 March 2018 23:59:59Failure to Update the FSAR With Pertinent Design Information
05000369/FIN-2018010-01Mcguire
McGuire
31 March 2018 23:59:59Failure to Update Offsite Circuit Operability Limit for Single Busline AlignmentOffsite Circuit
05000369/FIN-2018001-02McGuire31 March 2018 23:59:59Failure to Adequately Implement the Solid State Protection System(SSPS)Test Procedure Resulted in a Unit 1 Reactor Trip
05000400/FIN-2018410-01Harris31 March 2018 23:59:59Security
05000324/FIN-2017004-01Brunswick31 December 2017 23:59:59Loss of Emergency 4160V Bus Due to Failure to Implement Procedure
05000324/FIN-2017004-02Brunswick31 December 2017 23:59:59Licensee-Identified ViolationSafe Shutdown
Significance Determination Process
Fire Protection Program
Fire Watch
Grace period
05000369/FIN-2017003-01Mcguire
McGuire
30 September 2017 23:59:59Technical Specification (TS) Required Shutdown Due to Reactor Coolant System (RCS) LeakageEnforcement Discretion
Probabilistic Risk Assessment
Pressure Boundary Leakage
Pressure boundary leak
05000400/FIN-2017003-03Harris30 September 2017 23:59:59Licensee-Identified ViolationSignificance Determination Process
05000400/FIN-2017003-02Harris30 September 2017 23:59:59Review of Removal of the Technical Support Center (TSC) Temporary Diesel GeneratorSignificance Determination Process
05000400/FIN-2017003-01Harris30 September 2017 23:59:59Incomplete and Inaccurate Emergency Action Level SubmittalsSignificance Determination Process
05000324/FIN-2017003-01Brunswick30 September 2017 23:59:59Licensee-Identified Violation
05000324/FIN-2017002-02Brunswick30 June 2017 23:59:59Licensee-Identified ViolationSignificance Determination Process
05000324/FIN-2017002-01Brunswick30 June 2017 23:59:59Implementation of EGM 11- 003, Revision 3, Enforcement Guidance Memorandum on Dispositioning Boiling Water Reactor Licensee Noncompliance with Technical Specification Containment Requirements During Operations with a Potential for Draining the Reactor VesselEnforcement Discretion
05000400/FIN-2017002-02Harris30 June 2017 23:59:59B ESCW Chiller Failure to Start
05000400/FIN-2017002-01Harris30 June 2017 23:59:59Evaluate Fire Protection Discrepancies in RHR/CS Pump Rooms
05000369/FIN-2017002-01Mcguire
McGuire
30 June 2017 23:59:59Inadequate Survey Results in Unposted HRAHigh Radiation Area
Significance Determination Process
Substantial potential for overexposure
05000324/FIN-2017404-01Brunswick30 June 2017 23:59:59Security
05000325/FIN-2017009-01Brunswick30 June 2017 23:59:59Inoperability of EDG1 due to Cyclic Fatigue Failure of Hydraulic Fuel Rack ControlCondition Adverse to Quality
05000324/FIN-2017001-03Brunswick31 March 2017 23:59:59Failure to Install Flood Barrier Seals Around the EDG 2 Four -Day Fuel Oil Tank Vents
05000324/FIN-2017007-01Brunswick31 March 2017 23:59:59Failure to Correct a Nonfunctional Fire DoorFire Barrier
Significance Determination Process
05000400/FIN-2017001-01Harris31 March 2017 23:59:59Licensee-Identified ViolationInternal Flooding
Significance Determination Process
05000324/FIN-2017001-01Brunswick31 March 2017 23:59:59Nonfunctional Sprinklers in the Service Water Building Without Compensatory MeasuresSafe Shutdown
Significance Determination Process
Fire Protection Program
Hourly Fire Watch
Scaffolding
05000369/FIN-2017001-01McGuire31 March 2017 23:59:59Failure to Adequately Control Transient Combustibles Using a Receptacle with a Self-Closing LidSafe Shutdown
Fire Protection Program
05000324/FIN-2017001-02Brunswick31 March 2017 23:59:59Failure to Control a Temporary Fire Ignition Source Near the Unit 2 Standby Liquid Control Pump Motor and CablesContinuous fire watch
05000369/FIN-2017007-01Mcguire
McGuire
31 March 2017 23:59:59Failure to Translate Required Gasket Replacement Requirements into Limit Switch Maintenance ManualSignificance Determination Process
05000324/FIN-2017001-05Brunswick31 March 2017 23:59:59Licensee-Identified Violation