05000389/FIN-2018003-01 | Saint Lucie | 30 September 2018 23:59:59 | Failure to meet the Transient Combustible Requirements Specified by NFPA 805 | |
05000250/FIN-2018003-01 | Turkey Point | 30 September 2018 23:59:59 | Vital Inverter Alternate AC Supply Cables Were Not Included in the Nuclear Safety Capability Assessment | Probabilistic Risk Assessment Large early release frequency Fire Protection Program |
05000251/FIN-2018003-02 | Turkey Point | 30 September 2018 23:59:59 | Inoperable Auxiliary Feedwater Steam Supply Flow Path | |
05000250/FIN-2018002-01 | Turkey Point | 30 June 2018 23:59:59 | Unit 3 Emergency Diesel Generator (EDG) Operability during Fuel Oil Transfer to Unit 4 Fuel Oil Storage Tanks | Operator Manual Action |
05000335/FIN-2018450-01 | Saint Lucie | 31 March 2018 23:59:59 | Security | |
05000335/FIN-2018411-01 | Saint Lucie | 31 March 2018 23:59:59 | Security | |
05000250/FIN-2018001-02 | Turkey Point | 31 March 2018 23:59:59 | Failure of radiation workers to notify Radiation Protection upon a spill of radioactively contaminated water | |
05000250/FIN-2018001-01 | Turkey Point | 31 March 2018 23:59:59 | Failure to conduct post maintenance testing in accordance with ASME OM code | |
05000335/FIN-2018001-01 | Saint Lucie | 31 March 2018 23:59:59 | Improper Evaluation of LCV-9005 position setpoints Leads to AFAS | |
05000251/FIN-2017004-02 | Turkey Point | 31 December 2017 23:59:59 | Failure to Identify and Correct a Deficient CCW Penetration Seal Configuration that Exacerbates External Piping Corrosion Conditions | Significance Determination Process Maintenance Rule Program |
05000335/FIN-2017004-01 | Saint Lucie | 31 December 2017 23:59:59 | Inadequate Reactor System Trip Process for Inoperable Channel Results in Operation in a Condition Prohibited by Technical Specifications | |
05000389/FIN-2017004-02 | Saint Lucie | 31 December 2017 23:59:59 | Failure to Follow Surveillance Maintenance Procedure Resulting in a Condition Prohibited by Technical Specifications | Maintenance Rule Program |
05000335/FIN-2017004-03 | Saint Lucie | 31 December 2017 23:59:59 | Failure to Identify and Correct a Condition Adverse to Quality | Condition Adverse to Quality |
05000251/FIN-2017004-03 | Turkey Point | 31 December 2017 23:59:59 | Inadequate Installation of Outdoor Use Electrical Enclosures Results in Manual Reactor Trip | Significance Determination Process |
05000251/FIN-2017004-01 | Turkey Point | 31 December 2017 23:59:59 | Failure to Perform an Adequate ASME BPVC Section XI Repair/Replacement Plan for a Code Class 1 and 2 Replacement | Significance Determination Process Fuel cladding |
05000250/FIN-2017007-05 | Turkey Point | 30 September 2017 23:59:59 | Failure to Adequately Perform Discharge Testing on Battery 3B | Maintenance Rule Program |
05000250/FIN-2017003-01 | Turkey Point | 30 September 2017 23:59:59 | Failure to Identify and Correct CCW Pipe Corrosion | Maintenance Rule Program Through Wall Leak |
05000250/FIN-2017007-10 | Turkey Point | 30 September 2017 23:59:59 | Potential failure of 125 Vdc Bus 3B Class 1E components | |
05000250/FIN-2017007-01 | Turkey Point | 30 September 2017 23:59:59 | Inadequate Verification of Electrical Protective Device Selective Coordination | |
05000250/FIN-2017007-02 | Turkey Point | 30 September 2017 23:59:59 | Failure to Perform Design Verification for Under Frequency Trip of the Main Generator Breakers | |
05000250/FIN-2017007-03 | Turkey Point | 30 September 2017 23:59:59 | Failure to Verify the Adequacy of CCW isolation from Supplemental Cooling System (SCS) | |
05000250/FIN-2017007-04 | Turkey Point | 30 September 2017 23:59:59 | Failure to Verify the Adequacy of Design for Component Protective Covers | |
05000250/FIN-2017007-06 | Turkey Point | 30 September 2017 23:59:59 | Failure to Verify the Adequacy of Design for the ECC and CCW Systems | |
05000250/FIN-2017007-07 | Turkey Point | 30 September 2017 23:59:59 | Failure to Identify ICW Pipe Corrosion | Maintenance Rule Program |
05000250/FIN-2017007-08 | Turkey Point | 30 September 2017 23:59:59 | Failure to Correct a Non-Conforming Condition Impacting Containment | |
05000250/FIN-2017007-09 | Turkey Point | 30 September 2017 23:59:59 | Failure to Update the UFSAR with the Latest Information Developed | |
05000250/FIN-2017003-02 | Turkey Point | 30 September 2017 23:59:59 | Inadequate Operator Fundamentals during Diesel Driven Fire Pump Surveillance Testing | |
05000250/FIN-2017003-03 | Turkey Point | 30 September 2017 23:59:59 | Inadequate Maintenance Rule (a)(4) Risk Assessment for the High Head Safety Injection Pumps | Incremental Core Damage Probability Deficit |
05000250/FIN-2017002-03 | Turkey Point | 30 June 2017 23:59:59 | Failure to Implement Fire Detection | Fire Protection Program |
05000250/FIN-2017002-02 | Turkey Point | 30 June 2017 23:59:59 | Inadequate Foreign Materials Exclusion Controls for Thermo-Lag Activities Renders Electrical Equipment Inoperable and Results in a High Energy Arc Flash | Fire Barrier Arc flash Significance Determination Process Foreign Material Exclusion |
05000335/FIN-2017002-01 | Saint Lucie | 30 June 2017 23:59:59 | Reactor Coolant Pressure Boundary Leak on the 1B2 Reactor Coolant Pump Lower Seal Heat Exchanger | Enforcement Discretion Finite Element Analysis Pressure Boundary Leakage Pressure boundary leak |
05000250/FIN-2017002-01 | Turkey Point | 30 June 2017 23:59:59 | Failure to Perform 100 Percent General Visual Examinations of Containment Moisture Barriers Associated with Containment Liner Leak Chase Test Connections | Moisture barrier |
05000250/FIN-2017008-02 | Turkey Point | 31 March 2017 23:59:59 | Potential Failure to Complete an Adequate Risk Assessmen | |
05000335/FIN-2017001-01 | Saint Lucie | 31 March 2017 23:59:59 | Inadequate Procedure Results in Adding an Incorrect Lubrication Oil to the 1B CS Motor Inboard Bearing | |
05000250/FIN-2017008-01 | Turkey Point | 31 March 2017 23:59:59 | Potential Failure of Fire Detection Capability on Credited Train of Equipment Following High Energy Arc Flash Event | Arc flash Continuous fire watch Fire Protection Program Fire Watch |
05000250/FIN-2017008-03 | Turkey Point | 31 March 2017 23:59:59 | Potential Failure to Implement Adequate Foreign Material Exclusion Control | Fire Barrier Foreign Material Exclusion Scaffolding |
05000250/FIN-2017001-01 | Turkey Point | 31 March 2017 23:59:59 | Inadequate Operational Decision-Making Procedure Implementation Results in Feedwater Heater Water Hammer | Significance Determination Process |
05000335/FIN-2017403-01 | Saint Lucie | 31 March 2017 23:59:59 | Licensee-Identified Violation | |
05000250/FIN-2017008-04 | Turkey Point | 31 March 2017 23:59:59 | Potential Inadequate Design Control of Current Limiting Reactor | |
05000250/FIN-2017001-02 | Turkey Point | 31 March 2017 23:59:59 | Failure of Vital Battery Chargers Due to Conductive Dust / Particulate Foreign Material Exclusion | Fire Barrier Arc flash Foreign Material Exclusion Fire Protection Program |
05000250/FIN-2016004-01 | Turkey Point | 31 December 2016 23:59:59 | Unrecognized Inoperable Reactor Protection System Instrument Channel | |
05000250/FIN-2016008-01 | Turkey Point | 31 December 2016 23:59:59 | Licensee-Identified Violation | Fire Protection Program |
05000335/FIN-2016012-01 | Saint Lucie | 31 December 2016 23:59:59 | Failure to Maintain Component Configuration Control Resulted in a Complicated Reactor Trip | Significance Determination Process |
05000335/FIN-2016003-01 | Saint Lucie | 30 September 2016 23:59:59 | Reactor Coolant System Leakage Technical Specification Violation | |
05000250/FIN-2016007-02 | Turkey Point | 30 September 2016 23:59:59 | Failure to Correct Reactor Coolant Loop Check Valve 312-As Failure to Fully Seat | Condition Adverse to Quality |
05000250/FIN-2016003-02 | Turkey Point | 30 September 2016 23:59:59 | Communication of an NRC Inspector Presence by Security Personnel | |
05000251/FIN-2016003-01 | Turkey Point | 30 September 2016 23:59:59 | Failure to provide adequate flood protection for the 4A RHR train | Significance Determination Process Reasonable doubt of operability |
05000335/FIN-2016003-02 | Saint Lucie | 30 September 2016 23:59:59 | Licensee-Identified Violation | Significance Determination Process |
05000250/FIN-2016003-03 | Turkey Point | 30 September 2016 23:59:59 | Improper ECC Fuse Installation | |
05000250/FIN-2016007-01 | Turkey Point | 30 September 2016 23:59:59 | Failure to Provide Adequate Guidance to Prevent LCSWGR Heat-up |