 Start dateSiteTitleDescription
05000269/FIN-2018003-0130 September 2018 23:59:59OconeeFailure to Maintain the Effectiveness of the Emergency PlanThe inspectors identified a Severity Level IV (SL IV) NCV of Title 10 of the Code of Federal Regulations (CFR), Part 50.54(q)(2), for the licensees failure to maintain the effectiveness of the Oconee Nuclear Station (ONS) Emergency Plan (E-Plan). Specifically, from December 2014 until January 2018, the licensee failed to perform an adequate 10 CFR 50.54(q) evaluation for their E-Plan when a corresponding change was made to their Protective Action Recommendation (PAR) Emergency Plan Implementing Procedure (EPIP).
05000313/FIN-2018011-0230 September 2018 23:59:59Arkansas NuclearFailure of Both Arkansas Nuclear One Units to Establish Adequate Corrective Actions Resulting in Excessive Instances of Damaged and Broken Internals of the Emergency Feedwater Pum o Turbine Steam Admission Check Valves.An NRC identified Green, non-cited violation of 10 CFR Part 50, Appendix B, Criterion XVI, "Corrective Actions," was identified for failure to establish an adequate corrective action program and the resulting inability to correct a deficient system design which resulted in damaged and broken internals of the check valves admitting steam to the emergency feedwater turbine.
05000313/FIN-2018003-0230 September 2018 23:59:59Arkansas NuclearFailure to Implement Welding Standard Guidance and Examination ProceduresThe inspectors reviewed a self-revealed Green finding and associated non-cited violation of Arkansas Nuclear One, Unit 1, Technical Specification 5.4.1.a, for the licensees failure to properly preplan maintenance that can affect the performance of safety-related equipment. Specifically, the licensee failed to implement welding standard guidance and examination procedure guidance during the installation of the high pressure injection system drain line containing drain valves MU-1066A and MU-1066B. The drain line weld developed a crack that caused a leak shortly after plant startup that was determined to have been caused by grinding during the welding process, which was not permitted by the welding standard.
05000269/FIN-2018003-0230 September 2018 23:59:59OconeeFailure to Make a 60 Day Notification of an Actuation of an Emergency AC Power SourceAn NRC identified SL IV violation of 10 CFR 50.73(a)(2)(iv) was identified for the licensees failure to make a required 60-day notification. Keowee Hydro Unit 2 automatically started on May 7, 2018, following an electrical lockout of the Oconee Nuclear Station Unit 3 startup transformer.
05000313/FIN-2018011-0330 September 2018 23:59:59Arkansas NuclearFailure to Evaluate the Effects and the Suitability of Components in Containment from a Main Steam Line Break.The team identified an unresolved item (URI) related to the containment environment that would result from a main steam line break. Specifically, for ANO Unit 1 the licensee did not analyze the containment temperature, or evaluate the suitability of components in containment for the effects of a main steam line break (MSLB) accident. The Final Safety Analysis Report states, in part, that "At the end of Cycle 19, the original once through steam generators (OTSGs) were replaced. In support of Cycle 20 operation, an evaluation of the containment pressure/temperature response with the replacement OTSGs for loss of coolant accidents (LOCA) and MSLB was performed. For the MLSB, the containment pressure response with the replacement OTSGs was bounded by the current analysis. The post-MSLB temperature response w ith the replacement OTSGs would be worse. Entergy Operations, Inc. has adopted NUREG-0458 into the AN0-1 licensing basis which recognizes that the post-MSLB atmosphere may become superheated, but the temperature spike is of such short duration that the thermal lag of any SSC inside containment will not increase significantly. Consequently, the initial temperature peak does not define operating limits on any system, structure, or component (SSC) and the long-term containment temperature (which is essentially the saturation temperature) dominates the temperature response of SSCs. Therefore, as long as the peak MSLB pressure is less than the peak pressure following a LOCA, the temperature response of SSCs will still be defined by the LOCA." The NRC issued several bulletins subsequent to the issuance of NUREG-0458. Specifically IEB-79-01, as supplemented, and NRC Order CLI 80-21 state, in part, that "The Guidelines leave open the question of what standard will be applied to replacement parts in operating plants. Unless there are sound reasons to the contrary, the 1974 standard in NUREG-0588 will apply. The Guidelines and NUREG-0588 apply progressively less strict standards to the older plants. The justification for this position was not articulated at the time the older plants were grandfathered from the provisions of Reg. Guide 1.89." The NRC issued a Safety Evaluation Report to ANO, which states, in part, "A final rule on environmental qualification of electric equipment important to safety for nuclear power plants became effective on February 22, 1983. This rule, Section 50.49 of 10 CFR 50, specifies the requirements of electrical equipment important to safety located in a harsh environment. In accordance with this rule, equipment for Arkansas Unit 1 may be qualified to the criteria specified in either the DOR Guidelines or NUREG-0588, except for replacement equipment. Replacement equipment installed subsequent to February 22, 1983 must be qualified in accordance with the provisions of 10 CFR 50.49, using the guidance of Regulatory Guide 1.89, unless there are sound reasons to the contrary." The NRC issued Information Notice 85-39 states, in part, that the "Qualification of some replacement equipment was based on previously allowed DOR guidelines that stated "equipment is considered qualified for main steam line break environmental conditions if it was qualified for a loss-of-coolant accident environment in plants with automatic spray systems not subject to disabling single component failures." This basis of qualification is not acceptable without additional justification for replacement equipment that was procured and installed after February 22, 1983." The replacement steam generators have several design differences compared to the original steam generators. Specifically, the replacement steam generators were designed with larger secondary volumes, more tubes, flow-restricting venturis, and different materials (Alloy 690 vs. Alloy 600). Because the replacement steam generators were installed in 2005 (after 10 CFR 50.49 became effective on February 22, 1983) all replacement equipment must be qualified using the guidance of NUREG-0588 or Regulatory Guide 1.89. In addition, as stated above the licensee did not analyze or quantify the containment temperature that would result from a MSLB, and instead compared the containment pressures and the mass/energy releases that would result from a MSLB using the superseded guidance of NUREG-0458. The NRC team identified that there are several parameters that could have changed with the replacement steam generators which could impact the containment response. Specifically, input parameters such as: sub-compartment analysis, net positive suction head analysis, containment volume, heat sinks, properties of materials, heat transfer coefficients, initial conditions, and possibly cooling water temperature may affect the containment temperature response.
05000313/FIN-2018003-0330 September 2018 23:59:59Arkansas NuclearFailure to Provide Complete and Accurate Information in a License Amendment Request to Change Emergency Action Level RequirementsThe inspectors identified a Severity Level IV non-cited violation because the licensee provided inaccurate information to the NRC in a license amendment request for an emergency action level scheme change. Specifically, the licensee provided information about the availability of the postaccident sampling system building radiation monitor and the Unit 1 level instrumentation that was material to the licensing decision, but not accurate. The NRC approved an emergency action level scheme change on November 9, 2012 (ADAMS Accession No. ML12269A455) to allow Arkansas Nuclear One to adopt the Nuclear Energy Institute (NEI) 99-01, Revision 5, scheme. Subsequently, the licensee identified that two of their current emergency action level thresholds could not be implemented in accordance with their emergency classification procedure: On May 26, 2017, Condition Report CR-ANO-2-2017-03161 documented that postaccident sampling system building radiation monitor 2RX-9840 should be removed from all regulatory commitments because the postaccident sampling system had been removed from service, and its building would not be monitored for radiological releases. Radiation monitor 2RX-9840 was being used as a means to evaluate emergency action levels AU1, AA1, AS1, and AG1. In addition, it was used in the loss/potential loss of containment (CNB6) for fission product emergency action levels. The condition report noted that requirements for the postaccident sampling system had been removed from Arkansas Nuclear One licenses in August 2000 and the licensee had abandoned the systems valves (March 2003, EC-ANO-1779), removed power from the postaccident sampling system ventilation system (January 2004), and made radiation monitor 2RX-9840 nonfunctional (May 2008, Condition Report CR-ANO-2-2008-01439 and Work Order 150817). On March 15, 2018, Condition Report CR-ANO-C-2018-01121 documented that the Unit 1 level instrumentation set point used in emergency action level CA1 was below the indicating range of the instrument. The emergency action level indicated that a loss of Unit 1s reactor vessel inventory was shown by an indicated level less than 368 feet, 0 inches. Therefore, the lowest level indicated on the instrument would be higher than the level used in making the emergency classification decision. The inspectors reviewed the licensees license amendment request, dated December 1, 2011 (ADAMS Accession No. ML113350317), Proposed Emergency Action Levels Using NEI 99-01, Revision 5, Scheme, and the licensees response to a request for additional information dated July 9, 2012, (ADAMS Accession No. ML12192A090) to determine whether the conditions identified in the corrective action program existed at the time the licensee requested the license amendment and whether the request correctly described the instruments. The inspectors identified: The December 1, 2011, submittal incorrectly indicated that radiation monitor 2RX-9840 was a viable means of classifying emergency action levels AU1, AA1, AS1, and AG1, as well as providing input for the evaluation of fission product barrier emergency action levels. In the response to NRCs request for additional information (RAI) dated July 9, 2012, the licensee provided additional details about the super particulate iodine noble gas (SPING) radiation monitors used in this application. Response to Question 3 associated with emergency action levels AA1, AS1, and AG1 stated: Each SPING is associated with a particular ventilation pathway and provides continuous monitoring of air discharged via the respective release pathway. The license reviewer concluded that all of the SPING monitors included in the license amendment request were operable and continuously monitoring the specified release pathways, thereby being capable of measuring the radiation levels described in the proposed emergency action levels. 17 The December 1, 2011, submittal indicated that loss of Unit 1 reactor vessel inventory for emergency action level CA1 was a vessel level less than 368 feet, 0 inches. This issue was NRC-identified because when the licensee identified the emergency action level errors, they took action to correct the errors, but failed to address the failure to ensure that technical information provided to the NRC in support of the license amendment request was complete and accurate in all material respects. Corrective Actions: To correct the Unit 1 reactor vessel level emergency action level threshold error, the licensee issued communications regarding correct application of the emergency action level on March 15, 2018, followed by implementation of a change to Procedure OP-1903.010, Emergency Action Level Classification, Revision 56, dated June 26, 2018, with the corrected level. The use of radiation monitor 2RX-9840 is being removed from the emergency action levels as part of an emergency action level scheme change submitted to the NRC on March 29, 2018 (ADAMS Accession No. ML18088B412 and ML18094A155). In the interim, the licensee issued communications to emergency director-qualified staff members to ensure they are aware of the error, how to address it if implementing emergency action levels, and to inform them of the corrective actions in progress. Additionally, the licensee issued Condition Report CR-ANO-C-2018-03597, dated September 13, 2018, for the incomplete and inaccurate emergency action level submission examples to address the completeness and accuracy issues identified by the inspectors.
05000287/FIN-2018003-0330 September 2018 23:59:59OconeeMain Steam Relief Valve As-Found Lift Pressure Prohibited by Technical SpecificationsA self-revealed SL IV NCV of TS 3.7.1, Main Steam Relief Valves (MSRVs), was identified when a routine lift pressure test revealed that two of sixteen main steam relief valves were higher than allowed by TS SR 3.7.1.1 for a duration that was longer than the conditions TS required action completion time.
05000289/FIN-2018003-0130 September 2018 23:59:59Three Mile Island1A Emergency Diesel Generator Lube Oil Leak Inadequate Corrective ActionsA self-revealed Green non-cited violation of 10 CFR Part 50, Appendix B, Criterion XVI, Corrective Action, was identified for failure to develop and implement adequate corrective actions to ensure the availability and reliability of the 1A emergency diesel generator.
05000313/FIN-2018003-0530 September 2018 23:59:59Arkansas NuclearFailure to Maintain Main Feedwater Pump B Discharge Pressure in Band Caused a Reactor TripThe inspectors reviewed a self-revealed, Green finding and associated non-cited violation of Arkansas Nuclear One, Unit 1, Technical Specifications 5.4.1.a, for the licensees failure to implement Procedure OP-1102.002, Plant Startup, Revision 106. Specifically, control room operators failed to maintain main feedwater pump discharge pressure in the required band to control flow to the steam generators during a plant startup. As a result, the only operating main feedwater pump tripped on high discharge pressure, causing an automatic reactor trip.
05000289/FIN-2018410-0130 September 2018 23:59:59Three Mile IslandSecurity
05000313/FIN-2018003-0630 September 2018 23:59:59Arkansas NuclearReactor Power Transient Caused by the Turbine Bypass Valve Failing OpenThe inspectors reviewed a self-revealed Green finding and associated non-cited violation of Arkansas Nuclear One, Unit 1, Technical Specifications 5.4.1.a, for the licensees failure to properly preplan maintenance that can affect the performance of safety-related equipment. Specifically, the licensee failed to properly pre-plan maintenance for the replacement of air supply tubing for turbine bypass valve CV-6687, which resulted in the failure of the air tubing, causing valve CV-6687 to fail open, which led to a manual reactor trip and a subsequent loss of the main condenser.
05000313/FIN-2018002-0130 June 2018 23:59:59Arkansas NuclearFailure to Implement Procedural Guidance to Close Spent Fuel Pool Cooler Outlet Crosstie ValveThe inspectors reviewed a self-revealed, Green finding and associated non-cited violation of Arkansas Nuclear One (ANO) Unit 1 Technical Specification (TS) 5.4.1.a for the licensees failure to implement Procedure OP-1102.015, Filling and Draining the Fuel Transfer Canal, Revision 44. Specifically, operators failed to close spent fuel pool cooler outlet valve SF-9 while lining up to fill the fuel transfer canal (FTC) from the borated water storage tank (BWST). As a result, the licensee drained approximately 2600 gallons from the SFP to the FTC.
05000289/FIN-2018012-0130 June 2018 23:59:59Three Mile IslandFailure to Establish Appropriate Corrective ActionsAssociated with a Degraded Non-Safety Related Piping System.The NRC identified a Green finding when Exelon failed to establish appropriate corrective actions for a non-safety related system in the vicinity of safety-related equipment from 2010 to 2018. Specifically, failure to fix non-safety related piping resulted in its failure and water intrusion into the ESAS cabinets. This resulted in an event that required extensive clean up and detailed inspection of several Emergency Safeguards Actuation System (ESAS) cabinets due to water intrusion from the non-safety related system.
05000287/FIN-2018002-0130 June 2018 23:59:59OconeeFailure to Perform ISI General Visual Examinations of Containment Moisture Barrier Associated with Containment Liner Leak Chase Test Connection PipingThe inspectors identified a Green NCV of 10 CFR Part 50.55a, Codes and Standards, involving the licensees failure to properly apply Subsection IWE, of ASME Section XI, for conducting general visual examinations of the leak chase test connection piping at the concrete floor interface which provides a moisture barrier to the containment liner seam welds.
05000289/FIN-2018001-0131 March 2018 23:59:59Three Mile IslandEnforcement Action (EA)-EA-18-029: Multiple Examples of Nonconforming to Design for Tornado Missile ProtectionResulting from a systematic review of plant design and licensing basis Exelon determined four nonconforming conditions where components that could be depended upon to safely shutdown the reactor were not adequately protected from tornado missiles. These conditions include diesel fuel oil and day tank vents, borated water supplies, and once through steam generator pressure control isolation valves.Corrective Action(s): In accordance with the guidance in Regulatory Issues Summary 2015-06 Tornado Missile Protection (ML15020A419) and EGM 15-002, Revision 1, Enforcement Discretion for Tornado Generated Missile Protection Non-Compliance, (ML16355A286) the licensee implemented compensatory measures to maintain the equipment in a degraded but operable condition. These actions include verifying that procedures, training,and equipment are in place to take appropriate action in the event of a tornado watch or warning and establishing a heightened level of awareness and preparedness to tornado missile vulnerabilities. To restore full compliance, the licensee intends to evaluate the vulnerabilities utilizing approved methodologies and submitting a license amendment request per the timeline in Enforcement Guidance Memorandum 15-002, Revision 1.Corrective Action Reference(s):Issue Reports04081290, 04085589, 04085596, 04085607Enforcement:Violation: 10 CFR 50, Appendix B, Criterion III, Design Control, requires, in part, that measures shall be established to assure that the applicable regulatory requirements and the design basis for SSCs are correctly translated into specifications, drawing, procedures, and instructions. Contrary to the above, from April 19, 1974, until December 6, 2018, Exelon failed to correctly translate the design basis for protection against tornado-generated missiles into their specifications and procedures. Specifically, Exelon did not adequately protect TMI Unit 1 diesel fuel oil and day tank vents, borated water supplies, and once through steam generatorpressure control isolation valves from tornado generated missiles.Severity/Significance: For violations warranting enforcement discretion, Inspection Manual Chapter 0612 does not require a detailed risk evaluation, however, safety significance characterization is appropriate. The NRC Enforcement Policy, Section 2.2.1 states, in part, that, whenever possible, the NRC uses risk information in assessing the safety significance of violations. Accordingly, the NRC concluded that this issue is of low risk significance based on a generic and bounding risk evaluations performed in support of the resolution of tornado-generated missile non-compliances.Basis for Discretion: Because this violation was identified during the discretion period covered by EGM 15-002, Revision 1, and because Exelon has implemented compensatory measures, the NRC is exercising enforcement discretion, is not issuing enforcement action, and is allowing continued reactor operation.
05000289/FIN-2018001-0231 March 2018 23:59:59Three Mile IslandEnforcement Action (EA)-18-038: Primary Containment Declared Inoperable Due to Both Airlock Doors Open SimultaneouslyOn September 5, 2017, Three Mile Island Unit 1 was operating at 100% power and preparing for a scheduled maintenance and refueling outage. During a planned entry through the primary containment personnel airlock of the equipment hatch, the inner and outer doors were open simultaneously for less than one minute due to a failure of the interlock mechanism. The breach was immediately recognized by the operator and the inner door of the equipment hatch airlock was closed. Exelon determined the opening of both airlock doors constituted a violation of Technical Specification 3.6.12, Personnel or emergency air locks. The event was reported under 10 CFR 50.73(a)(2)(ii)(A) due to a principal safety barrier being seriously degraded, 10 CFR 50.73(a)(2)(v)(C) as an event or condition that could have prevented the fulfillment of the safety function of structures or systems that are needed to control the release of radioactive material, and 10 CFR 50.73(a)(2)(i)(B) as a condition prohibited by Technical Specification.Corrective Actions: Corrective actions included repairing the affected portion of the interlock mechanism and retesting its operation. An extent of condition was performed on the containment personnel hatch doors resulting in no similar issues. Corrective Action Reference(s): Issue report 04049166 Violation: Three Mile Island Technical Specification 3.6.12, Personnel or emergency air locks, states at least one door in each of the personnel or emergency air locks shall be closed and sealed during personnel passage through these air locks.Contrary to the above, on September 5, 2017, at least one door of a Three Mile Island Unit 1 personnel or emergency air lock was not closed and sealed during personnel passage through the air lock. Specifically, as the result of a failure of the interlock mechanism, the inner and outer equipment hatch emergency air lock doors were simultaneously opened for less than one minute. Severity/Significance: For violations warranting enforcement discretion, Inspection Manual Chapter 0612 does not require a detailed risk evaluation, however, safety significance characterization is appropriate. The NRC Enforcement Policy, Section 2.2.1 states, in part, that, whenever possible, the NRC uses risk information in assessing the safety significance of violations. The inspectors determined that finding was of very low safety significance (Green).Basis for Discretion: The inspectors determined that both containment hatch doors opening simultaneously was not within Exelons ability to foresee and prevent. As a result, no performance deficiency was identified. The inspectors assessment considered previous surveillances performed on the equipment hatch doors and interlock mechanisms. The inspectors reviewed all recent surveillances performed on the equipment and personnel inner and outer doors for timeliness and any abnormal results. No abnormalities were discovered and all surveillances were completed within periodicity. The NRC determined that it was not reasonable for Exelon to have been able to foresee and prevent this violation of NRC requirements, and as such, no performance deficiency existed. Therefore, the NRC has decided to exercise enforcement discretion in accordance with Sections 2.2.4 and 3.10 of the NRC Enforcement Policy and refrain from issuing enforcement action for the violation of technical specifications (EA-18-038). Further, because Exelons actions did not contribute to this violation, it will not be considered in the assessment process or the NRC Action Matrix. Inspectors elected to inspect the cause evaluation and corrective action determination related the issue described in LER 2017-003 as a selected annual sample. Exelon evaluated the condition and determined the cause of the event to be the failure of the outer door pawl to engage, providing a false indication that the outer door was closed prior to opening the inner door. The inspectors placed additional inspection focus to evaluate additional maintenance activities on the containment door mechanism, prior to outage activities where the door is cycled on a frequent basis with many new operators on site. Existing procedures and maintenance activities do not specify any subcomponent replacements until there is a failure or indication of damage. In addition to performing repairs to the outer door pawl, Exelon reviewed the current preventative maintenance activities for scheduling adequacy with the focus on high usage periods, evaluating additional maintenance activities that would include preventative subcomponent replacements, and reviewing industry operational experience for similar failures and corrective actions prior to the next refueling outage. Exelon documented the inspectors observation in issue report 04049166.
05000269/FIN-2018013-0131 March 2018 23:59:59OconeeFailure to Translate Design and Licensing Basis Requirements and Verify Adequate DesignThe licensee did not correctly translate site design and licensing bases into the site specifications and procedures for the design and installation of plant modifications that included the re-configuration of electrical cables in electrical cable trench #3 between the Keowee Hydro Station (KHS) and transformer CT-4 at Oconee Nuclear Station (ONS) and the Protected Service Water (PSW) ductbank between CT-4 and the PSW building. The specific requirements of IEEE 279-1968 and single failure sections of IEEE 279-1971 were not fully implemented. Contrary to this requirement, the licensee placed Class 1E 125Vdc system cables adjacent to various medium voltage-high energy alternating current (ac) power distribution cables for the offsite and onsite power systems and introduced credible single failure conditions with the potential for exposure of the onsite redundant Class 1E dc power distribution and control systems (dc systems) to possible damaging peak voltage from the offsite and onsite AC power systems. Corrective Actions: The licensee reported this as an unanalyzed condition to the NRC in accordance with 10 CFR 50.73(a)(2)(ii) (B) in Licensee Event Report 269/2014-01 entered this issue into their corrective action program. The licensee also performed immediate and prompt determinations of operability in which they concluded a reasonable expectation of operability existed on the basis that the consideration of the specific hazards was not required by the site licensing basis. A number of plant modifications were implemented to address the concerns.Additional inspections of these corrective actions will be conducted as appropriate. For the limited areas where the concerns could not be addressed, on February 28, 2018, (ML180051B257) the NRC granted relief from the applicable Code and concluded that the proposed alternatives provided an acceptable level of quality and safety for the cable configurations and locations.Corrective Action Reference: PIP O-14-03190, PIP O-14-05125, PIP O-14-03915, and PIP O-14-02965
05000269/FIN-2018013-0231 March 2018 23:59:59OconeeFailure to Submit for License Review andObtain a License Amendment for a ModificationThe licensee procedure Nuclear System Directive (NSD): 209 10 CFR 50.59 Process, committed to using Nuclear Energy Institute (NEI) 96-07, Guidelines for 10 CFR 50.59 Implementation.The guidance in Nuclear Energy Institute (NEI) 96-07 Section 4.3.2, specified that if a change in likelihood of occurrence of a malfunction increases by more than a factor of two would need NRC approval, because certain changes that satisfy the factor of two limit exceed the minimal increase standard for accident/transient frequency under criterion 10 CFR 50.59(c)(2)(i). The guidance in NEI 96-07 Section 4.3.8, specified that the use of new or different methods of evaluation that are not approved by NRC for the intended application, such as the methods identified in the memo to File, ME Patrick (PJ North), dated 1/12/92, Single Failure Timing Licensing Basis, no file number given. (Note: Memo was actually written 1/12/93), would need NRC approval, because it was considered a departure from a method of evaluation described in the UFSAR. Based on this guidance, the team determined that the modifications associated with engineering changes (ECs), EC91880, Keowee Emergency Start Cable, revision 24 and EC91875, Keowee AC Power Supply Tie-Ins, revision 15, and EC91874, 13.8 KV Feed To PSW System from 100 KV APS, revision 7 would require NRC approval in accordance with 10 CFR 50.59(c)(2)Corrective Actions: TBDCorrective Action References: TBD
05000368/FIN-2018001-0231 March 2018 23:59:59Arkansas NuclearFailure to Preplan and Perform Service Water Pre-Screen MaintenanceThe inspectors reviewed a self-revealed,non-cited violation and associated finding of Arkansas Nuclear One, Unit 2, Technical Specification 6.4.1.a, for the licensees failure to properly preplan maintenance that can affect the performance of safety-related equipment. Specifically, the licensee failed to properly preplan pre-screen cleaning maintenance, causing the trainB service water system to become inoperable
05000269/FIN-2017004-0131 December 2017 23:59:59OconeeFailure to Identify Sensitive Equipment During Modification Results in Loss of Safety FunctionA self-revealing Green non-cited violation (NCV) of Oconee Nuclear Station Technical Specification (TS), Section 5.4, Procedures, was identified for the licensees failure to identify sensitive equipment in a work area that warranted implementation of compensatory measures as required by station procedure AD-EG-ALL-1180, Engineering Change (EC) Walkdowns. During the design and planning phase of a station modification, the licensee failed to identify sensitive components located in the subject work area and subsequently failed to implement adequate protective measures as defined in station procedures to prevent plant impacts during modification installation. The licensee entered this issue into their corrective action program (CAP) as nuclear condition report (NCR)02131608 and implemented corrective actions to identify other positionable components required for emergency power source operability that would require the use of protective measures, as defined by AD-OP-ALL-0204, Plant Status Control, in order to prevent inadvertent operation. The licensee created a formal Engineering department communication which included lessons learned from the event and familiarization with the EC walkdown checklist. The signs on the governor actuator cabinets were also revised to emphasize the sensitive nature of the equipment. The licensees failure to properly identify sensitive equipment and implement compensatory measures to prevent plant impacts as required by station procedure AD-EG-ALL-1180 was a performance deficiency. The performance deficiency was determined to be more than minor because it was associated with the human performance attribute of the mitigating systems cornerstone and adversely affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the performance deficiency resulted in the loss of the emergency AC power path function for 11 hours and 31 minutes. The finding was assessed using IMC 0609, Attachment 4 and IMC 0609, Appendix A. Inspection Manual Chapter 0609, Appendix A required a detailed risk evaluation because the finding represented a loss of system and/or function. A regional senior reactor analyst (SRA) performed the detailed risk evaluation using SAPHIRE Version 8.1.6 and a modified Version 8.50 of the SPAR Model for Oconee. The SRA developed two change sets to model the total exposure time for the finding. The first simulated a common cause failure of both Keowee units with an exposure time of 7 hours. The second simulated the failure of both Keowee units while the standby buses were energized by the Lee Station for 5 hours. The result was less than 1E-6 for each Oconee unit, which would be a finding of very low significance (Green). The inspectors utilized IMC 0310, Aspects Within the Cross-Cutting Areas, dated December 4, 2014, and determined the finding had a cross-cutting aspect of work management in the area of human performance, in that the organization failed to implement a process of planning, controlling, and executing work activities such that nuclear safety is the overriding priority. The work process failed to include the identification and management of risk commensurate to the work and the need for coordination with different groups or job activities. (H.5)
05000313/FIN-2017015-0131 December 2017 23:59:59Arkansas NuclearSecurity
05000289/FIN-2017004-0131 December 2017 23:59:59Three Mile IslandFailure to correct degraded control rod connectionsThe inspectors documented a self-revealing finding involving the failure to follow LS-AA-125, Corrective Action Program, Revision 14. Specifically, the licensee failed to take appropriate corrective actions to correct degraded control rod drive mechanism cable connections identified during a 2010 stuck rod event. This resulted in a rod drop event on October 10, 2017, that caused a turbine runback to 55 percent and required a plant shutdown to repair. As an immediate corrective action, the licensee replaced the Bendix 7-pin electrical connector for the control rod drive mechanism (CRDM) and performed extent of condition visual and resistance checks on the other CRDM cables. The issue was entered into their corrective action program (CAP) as issue report (IR) 04061160.The performance deficiency is more-than-minor because it was associated with the equipment performance attribute of the Initiating Events cornerstone and adversely affected the objective to limit the likelihood of events that upset plant stability and challenge critical safety functions during power operations. Specifically, a transient resulting from a dropped rod challenged the critical safety function of reactivity control. The inspectors determined that this finding was of very low safety significance (Green) since it did not cause both a reactor trip and the loss of mitigation equipment relied upon to transition the plant to a stable shutdown condition. This finding has a cross-cutting aspect in the area of Problem Identification and Resolution, Evaluation, because despite indications of degradation during inspections in 2013 and 2015, the site failed to ensure that a resolution addressed the cause commensurate with its safety significance (P.2).
05000287/FIN-2017004-0231 December 2017 23:59:59OconeeFailure to Properly Risk Screen Work Within Two Feet of a Single Point Vulnerability ComponentA self-revealing Green NCV of Oconee Nuclear Station TS, Section 5.4, Procedures, was identified for the licensees failure to identify and properly risk screen work within 2 feet of a single point vulnerability (SPV) component in accordance with procedure AD-OP-ALL-0201, Protected Equipment. Specifically, the transmission and Oconee organizations failed to recognize that planned maintenance on a breaker in the 525 kilovolt (kV) switchyard was within 2 feet of an SPV component and, as a result, appropriate planning and oversight were not in place to prevent a plant trip during maintenance activities. The licensee entered this issue into their CAP as NCR 02138958. Corrective actions included revisions to station and transmission procedures to ensure inclusion of appropriate SPV program information, addition of the SY special emphasis code to all switchyard type work which require coordination of transmission resources, and the addition of the T1 trip/transient risk special emphasis code to all breaker failure relays in the 230 kV and 525 kV switchyard cabinets containing SPV components.The licensees failure to identify and properly risk screen the planned maintenance on PCB-57 as work within 2 feet of an SPV component in accordance with AD-OP-ALL-0201 was a performance deficiency. The performance deficiency was determined to be more than minor because it was associated with the human performance attribute of the initiating events cornerstone and adversely affected the cornerstone objective to limit the likelihood of events that upset plant stability and challenge critical safety functions during shutdown as well as power operations. Specifically, human errors led to a Unit 3 main generator lockout, which resulted in a reactor trip. The finding was assessed using IMC 0609, Attachment 4 and IMC 0609, Appendix A. The inspectors determined the finding was of very low safety significance (Green) because the finding did not represent a transient initiator that caused both a reactor trip and the loss of mitigation equipment relied upon to transition the plant from the onset of the trip to a stable shutdown condition (i.e. loss of condenser, loss of feedwater). The inspectors utilized IMC 0310, Aspects Within the Cross-Cutting Areas, dated December 4, 2014, and determined the finding had a cross-cutting aspect of work management in the human performance area, because the organization failed to implement a process of planning, controlling, and executing work activities such that nuclear safety is the overriding priority. The work process failed to include the identification and management of risk commensurate to the work and the need for coordination with different groups or job activities. (H.5)
05000313/FIN-2017007-0130 September 2017 23:59:59Arkansas NuclearFailure to Promptly Identify and Correct an Inadequate Design Bases CalculationThe inspectors identified a Green, non-cited violation of 10 CFR Part 50, Appendix B, Criterion XVI, Corrective Actions, requires, in part, that measures shall be established to assure that conditions adverse to quality, such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and nonconformance are promptly identified and corrected. Specifically, from 1996 until August 10, 2017, the licensee failed to properly resolve the environmental conditions in room 38 following a high-energy line break, even when challenged during a self-assessment by members of the quality assurance group in June 29, 2015. In response to this issue, the licensee determined that in the event of a break in the letdown line, an engineered safety feature signal automatic closure of both the inside and outside reactor building isolation valves occurs in approximately 40 seconds, preventing room 38 from going harsh. This finding was entered into the licensees corrective action program as Condition Report CR-ANO-1-2017-02441. The inspectors determined that the licensees failure to adequately evaluate and take prompt corrective actions to resolve an identified condition adverse to quality related to the high energy line break analysis for room 38 was a performance deficiency. The performance deficiency was more than minor because it was associated with the design control attribute of the Mitigating Systems Cornerstone and affected the associated objective to ensure availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, when the licensee identified that the environmental conditions in room 38 of the auxiliary building were harsh, as determined by Design Bases Calculation CALC-01-EQ-1002-02, they failed to properly resolve the condition adverse to quality. In accordance with Inspection Manual Chapter 0609, Appendix A, The Significance Determination Process (SDP) for Findings At-Power, dated June 19, 2012, Exhibit 2, Mitigating Systems Screening Questions, dated July 1, 2012, the inspectors determined that the finding was of very low safety significance (Green) because the finding (1) was not a deficiency affecting the design and qualification of a mitigating structure, system, or component, and did not result in a loss of operability or functionality; (2) did not represent a loss of system and/or function; (3) did not represent an actual loss of function of at least a single train for longer than its allowed outage time, or two separate safety systems out-of-service for longer than their technical specification allowed outage time; and (4) does not represent an actual loss of function of one or more non-technical specification trains of equipment designated as high safety-significant for greater than 24 hours in accordance with the licensees maintenance rule program. The finding has a cross-cutting aspect in the area of human resources, training, because the organization failed to provide training and ensure knowledge transfer to maintain a knowledgeable, technically competent workforce and instill nuclear safety values. Specifically, there was a lack of understanding of the current licensing bases for the plant displayed by engineering, operations, and management (H.9).
05000289/FIN-2017403-0130 September 2017 23:59:59Three Mile IslandSecurity
05000313/FIN-2017003-0130 September 2017 23:59:59Arkansas NuclearFailure to Maintain Service Water Train SeparationThe inspectors identified a non- cited violation of Technical Specification 5.4.1.a for the licensees failure to maintain train separation between safety -related service water trains when swapping the swing high pressure injection (HPI) pump between trains. Specifically, by following procedure OP 1104.002, Makeup and Purification System Operation, Revision 89, operators cross -tied service water trains, placing the system in an unanalyzed condition. This condition resulted in the train A electrical equipment room emergency chiller and train B reactor building emergency cooling coils being inoperable for a maximum of 25 minutes per occurrence. Additionally, it was determined that service water temperatures over the past 3 years did not result in an actual loss of function associated with these components if a design basis accident would have occurred. The immediate corrective actions were to assess past operability for not maintaining service water train separation and to revise Operating Procedure 1104.002 with adequate work instructions to maintain service water train separation. The licensee entered this deficiency into the corrective action program as Condition Report CR -ANO -1-2017- 02518. The licensees failure to maintain safety -related service water train separation when swapping the swing HPI pump between trains was a performance deficiency. The performance deficiency was more than minor because it was associated with the procedural quality attribute of the Mitigating Systems Cornerstone, and adversely affected the cornerstone objective to ensure availability, reliability, and capability of systems that respond to initiating events. Specifically, the licensees failure to maintain service water train separation placed the system in an unanalyzed condition and was subsequently determined to cause the train A electrical equipment room emergency chiller and train B reactor building emergency cooling coils to be inoperable for a maximum of 25 minutes per occurrence . Using Inspection Manual Chapter 0609, Appendix A, The Significance Determination Process (SDP) for Finding s At-Power, dated June 19, 2012, the inspectors determined that the finding had very low safety significance (Green) because it: was not a design deficiency; did not represent a loss of system and/or function; did not represent an actual loss of function of at least a single train for longer than its technical specification allowed outage time; and did not result in the loss of a high safety -significant , non -technical specification train. Specifically, inspectors confirmed that service water temperatures were never high enough to result in an actual loss of function for either limiting component. The finding had 3 a cross -cutting aspect in the area of human performance associated with conservative bias because the licensee failed to determine whether the proposed action was safe to proceed, rather than unsafe in order to stop. Specifically, in December 2015 when this approach was revise d to declare only the non- protected service water train inoperable, the licensee did not ensure that the transition lineup was analyzed to be within safety analyses before adopting the revised steps. (H.14)
05000289/FIN-2017403-0330 September 2017 23:59:59Three Mile IslandSecurity
05000313/FIN-2017002-0330 June 2017 23:59:59Arkansas NuclearFailure to Comply with ECCS Technical Speci ficationsGreen . The inspectors reviewed a Green self -revealing finding and associated non -cited violation of Unit 1 Technical Specification 3.5.2, Emergency Core Cooling System (ECCS) Operating, for the licensees failure to ensure the operability of the P36A high pressure injection pump after reinstalling its feeder breaker during a unit outage. A violation of Unit 1 Technical Specification 3.0.4 was also identified for making a mode change without meeting the requirements to do so. Following unit restart, the pump failed to start during routine equipment rotation, resulting in one train of emergency core cooling system being inoperable for long er than allowed by Unit 1 Technical Specifications. The licensee subsequently identified that the feeder breaker had not been fully racked into position. Inspectors also noted that the breaker had been racked in manually rather than using the normal electric racking tool, and no special precautions had been taken to ensure this infrequently -used method was successful. When the breaker was correctly racked in, the pump was satisfactorily tested. The licensee subsequently verified that all similar breakers were correctly racked into position. The licensee entered this issue into their corrective action program as Condition Report CR- ANO -1-2017- 01764. The inspectors determined that the failure to verify that the P36A high pressure injection pump was operable after racking its feeder breaker into the switchgear cubicle was a performance deficiency. The performance deficiency was more than minor because it was associated with the human performance attribute of the Mitigating Systems Cornerstone and adversely affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. 4 The inspectors performed the initial significance determination for the performance deficiency using NRC Inspection Manual 0609, Appendix A, Exhibit 2, Mitigating Systems Screening Questions, dated June 19, 2012 , and concluded that it required a detailed risk evaluation because it involved the loss of a single train of mitigating equipment for longer than the technical specification allowed outage time. Therefore, a Region IV senior reactor analyst performed a bounding detailed risk evaluation. The estimate in the increase in core damage frequency is 4.4 E-8 per year, or of very low safety significance (Green). This finding had a cross-cutting aspect in the area of Human Performance, Avoid Complacency, because the licensee failed to ensure that individuals recognize and plan for the possibility of mistakes, latent issues, and inherent risk, even while expecting successful outcomes. Specifically, the licensee failed to verify that the pump was operable after its breaker was rein stalled, even though an infrequently-used method was employed (H.12).
05000368/FIN-2017002-0230 June 2017 23:59:59Arkansas NuclearFailure to Install Set Screw Leads to Breaker FailureGreen . The inspectors documented a Green self -revealing finding and associated non- cited violation of Unit 2 Technical Specification 6.4.1.a, for failure to properly pre-plan and perform maintenance on the Unit 2 containment spray pump B breaker in accordance with written procedures. Specifically, the licensee failed to install a cam shaft set screw during the breakers last overhaul. The cam eventually became displaced on the shaft, and the breaker failed to close. To correct the issue, the licensee replaced the breaker and installed a cam shaft set screw in the failed breaker. The licensee also inspected all other similar breakers to verify the cams were properly secured. The licensee entered the issue in to their corrective action program as Condition Report CR -ANO -2-2017- 03168. The failure to install a cam shaft set screw during the overhaul of the Unit 2 containment spray pump B breaker is a performance deficiency. The performance deficiency is more than minor because it was associated with the equipment performance attribute of the mitigating systems cornerstone and adversely affected the cornerstone objective to ensure the reliability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the performance deficiency resulted in the failure of a Unit 2 containment spray pump breaker. Using Inspection Manual Chapter 0609, Appendix A, The Significance Determination Process (SDP) for Findings At -Power, dated June 19, 2012, Exhibit 2, Mitigating Systems Screening Questions, the issue screened as having very low safety significance (Green) because it was not a design or qualification deficiency; did not represent a loss of system; did not result in the actual loss of function of a train of technical specification equipment for greater than its allowed outage time; and did not screen as potentially risk significant due to seismic, flooding, or severe weather events. The inspectors determined this finding did not have a cross -cutting aspect because the most significant contributor did not reflect current licensee performance. Specifically, the error occurred during the breakers last overhaul, which occurred in 2011
05000313/FIN-2017008-0130 June 2017 23:59:59Arkansas NuclearInadequate FLEX Power Supply ConnectionsGreen. The team identified a finding for the fail ure to assure that FLEX power supply connections would be reliable following all required postulated beyond design basis external events . Specifically, the team identified that one installed cable configuration could potentially be damaged during high wind events preventing operation of the portable diesel generator required to operate plant equipment. This issue was entered into the licensees corrective action program as Condition Report CR- ANO -C-2017- 00316. The failure to adequately ins tall the electrical modification for connecting the portable diesel generator was a performance deficiency. The performance deficiency was more than minor because it was associated with the protection against external factors attribute of the Mitigating S ystems Cornerstone and adversely affected the Mitigating Systems Cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. The significance of the find ing was evaluated using NRC Inspection Manual Chapter 0609, Appendix O, Significance Determination Process for Mitigating Strategies and Spent Fuel Pool Instrumentation (Orders EA -12- 049 and EA -12-051), dated October 7, 2016, and Appendix M , Significance Determination Process Using Qualitative Criteria, dated April 12, 2012. A bounding evaluation was performed using the exposure time, tornado frequency, and frequency of a random failure of both emergency diesel generators. The licensees compliance date with the order was January 12, 2016, so an exposure time of one year was used. The tornado frequency selected was for an F2 or greater tornado striking the site (5.31E -5/year). The random failure frequency of both units emergency diesel generators (3.15E -3/year) was selected since the emergency diesel generators are protected from damage during high wind events. This is a conservative bounding analysis because it assumes that any tornado would result in damage causing a loss of offsite p ower and damage the cables in terminal panel 2TB1011 on the roof. The change in core damage frequency for the finding was determined to be 1.67E -7/year. Therefore, the finding was determined to a very low risk significance . The findi ng had a cross-cutti ng aspect in the challenge to the unknown co mponent of Human Performance becau se the lice nsee failed to adequately address all potential damage scenarios when developing the modification design requirements for beyond design basis external events (H.11)
05000313/FIN-2017008-0230 June 2017 23:59:59Arkansas NuclearInadequate FLEX ProceduresGreen. The team identified a finding with three examples for the licensee failing to assure that FLEX procedures were adequate for implementation of the strategies credited in the licensees Final Implementation Plan. This issue was entered into the licensees corrective action program as Condition Reports CR -ANO -C-2017- 00341, CR- ANO -C 2017- 00344, CR- ANO -1-2017 -00250, and CR -ANO -C-2017 00295. The failure to provide adequate procedures for responding to an extended loss of all AC power due to a flooding or high wind event was a performance deficiency. The performance deficiency was more than minor because it was associated with the protection against external factors attribute of the Mitigating Systems Cornerstone and adversely affected the Mitigating Systems Cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. The significance of the finding was evaluated using NRC Inspection Manual Chapter 0609, Appendix O, Significance Determination Process for Mitigating Strategies and Spent Fuel Pool Instrumentation (Orders EA -12-049 and EA -12-051), dated October 7, 2016, and Appendix M , Significance Determination Process Using Qualitative Criteria, dated April 12, 2012. A bounding evaluation was performed using the exposure time, frequency of random failure of both emergency diesel generators , and tornado frequency or flood frequency . The licensees compliance date wit h the order was January 12, 2016, so an exposure time of one year was used. The random failure frequency of both units emergency diesel generators (3.15E -3/year) was selected since the emergency diesel generators are protected from damage during high wind and flood events. For the two examples impacted by flood events, t he flood frequency selected was for a flood exceeding the site grade elevation (8.47E -5/year). The change in core damage frequency for the se examples was determined to be 2.67E -7/year. For t he example which would only impact the licensee s response to a high wind event , the tornado frequency selected was for an F2 or greater tornado striking the site (5.31E -5/year). The change in core damage frequency for th is example was determined to be 1.67E -7/year. Therefore, the three examples of the finding were determined to of very low risk significance. The findi ng had a cross-cutti ng aspect in the Procedure Adherence co mponent of Human Performance becau se the lice nsee failed to adequately perform reviews required by the licensees procedure control program to confirm that : (1) instructions for implementing the strategies in the licensees Final Implementation Plan were complete and appropriate; and (2) reviews for affected procedures relat ed to other procedure revisions identified impacts on the implementing strategies and revised them appropriately (H.8).
05000269/FIN-2017001-0131 March 2017 23:59:59OconeeFailure to Comply with 10 CFR 55.49Green: A Green NRC-identified non-cited violation (NCV) of 10 CFR 55.49, Integrity of Examinations and Tests, was identified because the licensee engaged in an activity that compromised the integrity of examinations. Specifically, the licensee failed to ensure that current week simulator scenarios could not be predicted based on the previous weeks simulator scenarios during the annual operating exams required by 10 CFR 55.59, Requalification. While inspecting the annual operating examination schedules for the required simulator examinations for 2016 and 2017, the inspectors identified that one of the two scenarios that were administered during a single week of the annual exam cycle could be predicted for administration the following week. The licensee did not implement any immediate corrective actions because the exams were completed and there was no evidence of compromise. The licensee documented the issue in nuclear condition report (NCR) 2114313. This performance deficiency was more than minor because it was associated with the human performance attribute of the mitigating systems cornerstone, and adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, using predictable exam development and administration techniques adversely affected the integrity of the administration of the operating exams, which test licensed operator performance in order to ensure timely and correct mitigating actions during an event. Using the Licensed Operator Requalification Significance Determination Process, this finding was determined to be of very low safety significance (Green) because no known compromise of the examinations occurred. The inspectors determined the finding had a cross-cutting aspect of resources in the cross-cutting area of human performance because the licensee failed to ensure that adequate training procedures were available to meet industry standards and ensure that the potential for the compromise of regulatory examinations did not exist. (H.1)
05000313/FIN-2017001-0131 March 2017 23:59:59Arkansas NuclearFailure to Identify Damaged LugsGreen. The inspectors documented a self-revealing finding and associated non-cited violation of Unit 1 Technical Specification 5.4.1.a, for the failure to properly perform maintenance on the Unit 1 suction valve to the emergency core cooling system B and containment spray B. Specifically, the licensee failed to identify a damaged electrical lug on the valve actuator during maintenance. The lug subsequently failed and the valve failed to stroke fully open after being returned to service. The licensee repaired the lug and restored the valve to service. The licensee documented this issue in Condition Report CR-ANO-1-2017-00270. The licensee failed to identify a damaged electrical lug on a motor-operated valve during maintenance, which is a performance deficiency. The performance deficiency is more than minor because it is associated with the human performance attribute of the mitigating systems cornerstone and adversely affected the cornerstone objective to ensure the reliability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the performance deficiency resulted in the failure of a suction valve for one train of emergency core cooling systems and containment spray systems after the valve was returned to service from the maintenance. Using Inspection Manual Chapter 0609, Appendix A, The Significance Determination Process (SDP) for Findings At-Power, dated June 19, 2012, Exhibit 2, Mitigating Systems Screening Questions, the inspectors determined that the finding required a detailed risk evaluation because the finding represented an actual loss of function of a single train for greater than its technical specification allowed outage time. The analyst determined in a detailed risk evaluation that by combining internal and external event inputs yielded an estimate of the total increase in core damage frequency of 8.5E-7/year, or of very low safety significance (Green). The finding was determined to have a cross-cutting aspect in the area of human performance associated with Avoid Complacency because the primary cause of the performance deficiency involved the failure to plan for the possibility of mistakes and use appropriate error reduction tools. (H.12)
05000313/FIN-2017001-0231 March 2017 23:59:59Arkansas NuclearFailure to Evaluate All Required Functions for OperabilityGreen. The inspectors identified a finding and an associated non-cited violation of 10 CFR 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, for failure to evaluate the impact of all the required safety functions for operability when the valve failed to fully open during a valid demand. Specifically, the licensee failed to evaluate the operability impact on the safety function to close for the Unit 1 motor-operated borated water storage tank outlet valve CV-1408 before de-energizing and locking open the valve and declaring it operable. After the inspectors questioned this decision, the licensee declared the valve inoperable and repaired the valve operator. The licensee documented this issue in Condition Report CR-ANO-1-2017-00324. The failure to evaluate the operability impact of all required safety functions for Unit 1 motor-operated valve, CV-1408, before de-energizing and locking open the valve is a performance deficiency. The performance deficiency is more than minor because it is associated with the equipment performance attribute of the mitigating systems cornerstone and adversely affected the cornerstone objective to ensure the availability of systems that respond to initiating events to prevent undesirable consequences. Specifically, by locking the valve open, the licensee prevented Train B of the emergency core cooling system from being able to be remotely isolated from the borated water storage tank during the containment recirculation phase of a potential loss of coolant accident, which could have allowed air binding of the pumps. Using Inspection Manual Chapter 0609, Appendix A, The Significance Determination Process (SDP) for Findings At-Power, dated June 19, 2012, Exhibit 2, Mitigating Systems Screening Questions, the issue screened as having very low safety significance (Green) because it was not a design or qualification deficiency; did not represent a loss of system; did not result in the actual loss of function of a train of technical specification equipment for greater than its allowed outage time; and did not screen as potentially risk significant due to seismic, flooding, or severe weather. The inspectors determined that this finding has a cross cutting aspect in the human performance area of Consistent Process, because the performance deficiency was caused by not following a consistent, systematic approach to making a decision concerning operability of the affected train. (H.13)
05000313/FIN-2017001-0331 March 2017 23:59:59Arkansas NuclearInadvertent Reactivity AdditionGreen. Inspectors documented a Green self-revealing finding and associated non-cited violation of Unit 1 Technical Specification 5.4.1.a. Specifically, the licensee failed to properly pre-plan and perform maintenance of the integrated control system equipment that can affect the performance of safety-related equipment. The licensee failed to plan and perform post-maintenance testing on newly installed integrated control system cards before returning the system to service. As a result, the licensee failed to detect a failed card. When the associated controller was placed into automatic mode, the system responded to a false demand signal that resulted in an inadvertent rod withdrawal that required prompt operator action to terminate the power increase and restore power to the original level. To correct the failed card, the licensee installed a new card that had been tested and validated prior to installation. The licensee documented this issue in Condition Report CR-ANO-1-2016-05551. Inspectors concluded that the failure to perform a post-maintenance test prior to placing a component in service is a performance deficiency. Specifically, the work order for replacing the steam generator reactor demand circuit card did not include a verification that the system was functioning properly after the replacement card was installed in the plant. The performance deficiency is more than minor because if left uncorrected, the performance deficiency has the potential to become a more significant safety concern. Specifically, if the operator had not taken prompt action to mitigate the event, it could have resulted in a more significant plant transient and could have challenged plant equipment. In accordance with Inspection Manual Chapter 0609, Attachment 4, Initial Characterization of Findings, issued October 7, 2016, and Exhibit 1 of IMC 00609, Appendix A, The Significance Determination Process (SDP) for Findings At-Power, Issued June 19, 2012, the inspectors determined the finding to be of very low safety significance (Green) because the finding is associated with the initiating events cornerstone and did not cause a reactor trip. The finding was determined to have a cross-cutting aspect in the area of human performance associated with Work Management, because the licensee did not ensure that they followed a process of planning, controlling, and executing the work activities in a formalized manner, allowing the work order to not have complete instructions for a post-maintenance test. (H.5)
05000269/FIN-2017007-0131 March 2017 23:59:59OconeeFailure to Identify and Correct Broken Cable Trench Cover.Green. The NRC identified a non-cited violation of Title 10 of the Code of Federal Regulations (CFR) Part 50, Appendix B, Criterion XVI, Corrective Actions, for the licensees failure to assure that a condition adverse to quality associated with a damaged trench cover on the yellow trench was identified and corrected. Specifically, the seismic design function of the trench cover was not identified or recognized at the time of the licensees original identification of the issue and subsequent NCR generation, and, due to this error, appropriate corrective actions were not assigned or completed. In response to the issue, the licensee replaced the broken trench cover on the yellow trench with a temporary cover on March 22, 2017 , and planned work order 20147282 to replace it with a permanent cover to restore the design configuration . This performance deficiency was more than minor because it was associated with the Design Control Attribute of the Mitigating Systems Cornerstone, and adversely affected the cornerstone objective of ensuring availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, inadequate identification and correction of this condition adverse to quality adversely impacted the trench covers reliability and capability to perform its function during and following a seismic event. The team determined the finding to be of very low safety significance (Green) because the finding was a deficiency affecting the design or qualification of a mitigating structure, system, or component (SSC), and the SSC maintained its operability or functionality. The team determined that the finding was indicative of current licensee performance, because the issue was first identified in January 2017. A cross -cutting aspect of Consistent Process (H.13.) in the Human Performance Area was assigned because individuals did not use a consistent, systematic approach to make decisions.
05000289/FIN-2017008-0131 March 2017 23:59:59Three Mile IslandFailure to Correct Deficiency in Implementing Controls for Pre-Staging Material in the Reactor BuildingGreen. The inspectors identified a finding of very low safety significance involving a non- cited violation (NCV) of 10 CFR 50, Appendix B, Criterion XVI, "Corrective Action Program," because Exelon did not effectively correct a condition adverse to quality regarding the implementation of controls for pre-staging of materials in the reactor building. Specifically, Exelon did not effectively implement corrective actions regarding the control of pre-staging materials in the reactor building during power operations, which resulted in unsecured prohibited material in a location that had the potential, during a large break loss of coolant accident (LOCA), to be transported to and impact the emergency core cooling system (ECCS) sump. Exelon documented this finding in issue reports 2608560 and 2578255. Corrective actions include Exelon to establish a focus team, led by the maintenance manager, to ensure pre-outage loading of the reactor building is conducted in accordance with requirements and directly supervised by Exelon personnel. The performance deficiency is rnore than minor because, if left uncorrected, it has the potential to lead to a more significant safety concern. Specifically, without proper controls implemented, materials may be pre-staged in the reactor building in a quantity or configuration that may render the ECCS sump inoperable. The inspectors evaluated the finding against the Mitigating System Cornerstone using Manual Chapter 0609, Attachment 4, "Initial Characterization of Findings," and Appendix A, "The Significance Determination Process for Findings At-Power," Exhibit 2, and determined this finding to be of very low safety significance (Green). The finding has a cross-cutting aspect in the area of Human Performance, Field Presence, because Exelon senior managers did not ensure the oversight of work activities by supplemental personnel (H.2).
05000313/FIN-2016404-0231 December 2016 23:59:59Arkansas NuclearSecurity
05000269/FIN-2016004-0131 December 2016 23:59:59OconeeFailure to Perform Appropriate Evaluation of Motor Operated Valve Actuator Output CapabilityGreen. The NRC identified a non-cited violation (NCV) of Title 10 Code of Federal Regulations (10 CFR) 50, Appendix B, Criterion III, Design Control, for the licensees failure to correctly determine the bounding degraded voltage to be assumed in the determination of motor operated valve (MOV) actuator output capability. Specifically, the licensee did not use appropriate transient voltages as input into the evaluation of the capability of the MOVs that are required to reposition in response to an accident signal. In response, the licensee entered the issue into their corrective action program as nuclear condition report (NCR) 2056895 and planned to formally revise their calculations to reflect the current plant configuration. This performance deficiency was more than minor because it was associated with the design control attribute of the mitigating systems cornerstone, and adversely impacted the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, Oconees programmatic failure to use bounding terminal voltage values in the evaluation of their automatically actuated, safety-related MOVs did not ensure they would be capable of mitigating accidents when powered from sources other than the 230kV switchyard, thus resulting in doubt on their capability to perform their intended safety function. The finding was determined to be of very low safety significance (Green) because the finding was a deficiency affecting the design or qualification of a mitigating structure, system, or component (SSC), and the SSC maintained its operability or functionality. No cross-cutting aspect was assigned because the inspectors determined that the finding was not indicative of current licensee performance, because the most recent transient analysis that was performed for the sources other than the 230kV switchyard was performed in 2012.
05000313/FIN-2016004-0231 December 2016 23:59:59Arkansas NuclearFailure to Design Pipe Support for VibrationGreen. The inspectors documented a self-revealed finding and associated non-cited violation of 10 CFR 50 Appendix B Criterion III for the licensees failure to verify that the decay heat removal (DHR) system drain piping configuration and supports could withstand vibrations created during low pressure and high flow conditions. As a result, a cracked weld and unisolable leak in the DHR system occurred due to high cycle fatigue caused by those conditions. To correct this issue, the licensee repaired the leaking weld and designed and installed a new piping support and piping configuration to reduce vibrations during the expected operating conditions. The licensee entered this issue into the corrective action program as Condition Report CR-ANO-1-2016-03225. The failure to design the decay heat removal system piping to withstand expected vibrations from the systems cavitating venturis is a performance deficiency. The performance deficiency is more than minor because it was associated with the design control attribute of the initiating events cornerstone and adversely affected the cornerstone objective to limit the likelihood of events that upset plant stability and challenge critical safety functions during shutdown as well as power operations. Specifically, inadequate design of the DHR system piping support resulted in a leak that could have challenged the capability of both trains of the DHR system during shutdown on September 29, 2016. The inspectors performed an initial screening of the finding in accordance with NRC Inspection Manual Chapter (IMC) 0609, "Significance Determination Process," issued October 7, 2016, and were directed to IMC 0609, Appendix G, Attachment 1, "Shutdown Operations Significance Determination Process Phase 1 Screening and Characterization of Findings, since the finding pertained to a degraded condition while the plant was shutdown. Using IMC 0609, Appendix G, Attachment 1, dated May 9, 2014, the inspectors determined that the finding required a Phase 2 evaluation. A senior reactor analyst performed a Phase 2 evaluation in accordance with IMC 0609, Appendix G, Attachment 2, Phase 2 Significance Determination Process Template for PWR during Shutdown, dated February 28, 2005. The senior reactor analyst performed a Phase 2 evaluation which used realistic break characteristics and plant configuration changes to determine the significance to be of very low safety significance (Green). The inspectors determined this finding did not have a cross-cutting aspect because the most significant contributor did not reflect current licensee performance. Specifically, the licensee last reviewed and modified the pipe support configuration in 1996
05000313/FIN-2016008-0231 December 2016 23:59:59Arkansas NuclearFailure to Incorporate NRC Safety Guide 9 Criteria into Surveillance ProceduresGreen. The team identified Green non-cited violation of 10 CFR Part 50, Appendix B, Criterion XI, Test Control, which states, A test program shall be established to assure that all testing required to demonstrate that structures, systems, and components will perform satisfactorily in service is identified and performed in accordance with written test procedures which incorporate the requirements and acceptance limits contained in applicable design documents. Additionally, Test results shall be documented and evaluated to assure that test requirements have been satisfied. Specifically, as of December 2, 2016, Units 1 and 2 emergency diesel generator surveillance procedures failed to incorporate the applicable voltage and frequency limits of NRC Safety Guide 9, and did not consistently document or evaluate results to assure test requirements have been satisfied. In response to this issue, the licensee provided the team test results which demonstrated that an immediate safety concern was not present. This finding was entered into the licensees corrective action program as Condition Reports CR-ANO-1-2016-4785 and CR-ANO-2-2016-4257. The team determined that the failure to incorporate the acceptance limits of NRC Safety Guide 9 into surveillance test procedures for emergency diesel generators and assure that test requirements have been satisfied in accordance with 10 CFR Part 50, Appendix B, Criterion XI, Test Control, was a performance deficiency. The performance deficiency was determined to be more than minor because it was associated with the procedure quality attribute of the Mitigating Systems Cornerstone and adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of mitigating systems to respond to initiating events to prevent undesirable consequences, and would have the potential to lead to a more significant safety concern. Specifically, the failure to incorporate appropriate acceptance criteria in test procedures and assure that the criteria have been satisfied had the potential to lead to a worse condition, if left uncorrected. In accordance with Inspection Manual Chapter 0609, Appendix A, The Significance Determination Process (SDP) for Findings At-Power, dated June 19, 2012, Exhibit 2, Mitigating Systems Screening Questions, the issue screened as having very low safety significance (Green) because it was a design or qualification deficiency that did not represent a loss of operability or functionality; did not represent an actual loss of safety function of the system or train; did not result in the loss of one or more trains of non-technical specification equipment; and did not screen as potentially risk-significant due to seismic, flooding, or severe weather. This finding did not have a cross-cutting aspect because the performance deficiency did not reflect current licensee performance.
05000313/FIN-2016008-0631 December 2016 23:59:59Arkansas NuclearReadiness to Cope with External FloodingGreen. The team identified three examples of a Green non-cited violation of 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, which states, in part that, activities affecting quality shall be prescribed by documented instructions, procedures, or drawings of a type appropriate to the circumstances. Specifically, prior to December 2, 2016, Unit 1 Operating Procedure OP 1203.025, Natural Emergencies, Revision 60 and Unit 2 Operating Procedure OP 2203.008 Natural Emergencies, Revision 42 failed to ensure all actions required to establish external flood protection, as specified by flood protection design basis engineering report CALC-ANOC-CS-00003, Revision 00 were implemented. This issue was entered into the licensees corrective action program as Condition Report CR-ANO-2-2016-4265. The licensees failure to prescribe procedures appropriate to the circumstances for combating emergencies or other significant acts of nature such as flooding was a performance deficiency. The performance deficiency was more than minor because it was associated with the procedure quality attribute of the Mitigating Systems Cornerstone and adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of mitigating systems to respond to initiating events to prevent undesirable consequences, and would have the potential to lead to a more significant safety concern. In accordance with Inspection Manual Chapter 0609, Appendix A, The Significance Determination Process (SDP) for Findings At-Power, dated June 19, 2012, Exhibit 2, Mitigating Systems Screening Questions, the issue screened as having very low safety significance (Green) because it does not involve the loss or degradation of equipment or function specifically designed to mitigate a seismic, flooding, or severe weather initiating event. This finding had a cross-cutting aspect in the area of problem identification and resolution associated with identification because the licensee failed to identify issues, completely, accurately, and in a timely manner in accordance with the corrective action program. Specifically, the licensee failed to identify these deficiencies during a review of these same procedures as part of actions to close significant performance deficiencies as documented in Arkansas Nuclear One Area Action Plan FP-6 (P.1).
05000269/FIN-2016004-0231 December 2016 23:59:59OconeeInappropriate Voltage Band in Lee Combustion Turbine Unit Operating ProcedureGreen. The NRC identified a NCV of 10 CFR 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the licensees failure to identify appropriate procedural updates that were needed to ensure the Lee combustion turbine (LCT) procedures were appropriate for the circumstances and maintained current. Specifically, the licensee did not include appropriate operational limitations in procedures associated with the LCTs. In response, the licensee generated NCR 2058763, verified the LCT automatic voltage regulator setpoint was, and had been, 13.8kV, and generated a corrective action to revise the affected procedures limits to 13.78kV, a value bounded by station analyses. This performance deficiency was more than minor because it was associated with the procedure quality attribute of the mitigating systems cornerstone, and adversely impacted the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, Oconees failure to limit the operating voltage band of the LCTs to an amount that was demonstrated as acceptable by analysis resulted in doubt on their capability to provide power to safety-related equipment during an accident. The finding was determined to be of very low safety significance (Green) because the finding was a deficiency affecting the design or qualification of a mitigating SSC, and the SSC maintained its operability or functionality. No cross-cutting aspect was assigned because the inspectors determined that the finding was not indicative of current licensee performance, because the update to the procedures occurred in January and October 2007, after replacement of the LCTs.
05000313/FIN-2016008-0431 December 2016 23:59:59Arkansas NuclearFailure to Perform an Adequate Emergency Feedwater Pump Suction Transfer Design Calculation or Testing (EA 2017-017)Green. The team identified a Green non-cited violation of 10 CFR Part 50, Appendix B, Criterion III, Design Control, which states, in part that, design control measures shall provide for verifying or checking the adequacy of design, such as by the performance of design reviews, by the use of alternate or simplified calculational methods, or by the performance of a suitable testing program. Specifically, prior to December 22, 2016, the licensee failed to verify the adequacy of the emergency feedwater suction transfer procedure by determining if the qualified condensate storage tank will be completely empty of water, possibly causing an air ingestion failure of the Unit 1 emergency feedwater pumps, prior to transferring to the credited safety-related alternate suction source. In response to this issue, the licensee resolved the immediate safety concern by revising the emergency feedwater pump operating procedure, removing the steps that were the cause of the concern. This finding was entered into the licensees corrective action program as Condition Reports CR-ANO-1-2016-5166, CR-ANO-1-2016-5725, and CR-ANO-1-2017-0040. The team determined that the failure to verify the adequacy of the design of the Unit 1 emergency feedwater suction from the qualified condensate storage tank to alternate sources of water by performance of design review, by use of calculational methods, or by performance of a suitable testing program in accordance with 10 CFR Part 50, Appendix B, Criterion III, Design Control, was a performance deficiency. This finding was more than minor because it was associated with the design control attribute of the Mitigating Systems Cornerstone and adversely affected the cornerstone objective to ensure the reliability, availability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the licensee failed to have adequate measures in place to ensure an acceptable design analysis or a suitable test program would verify that the process of transferring emergency feedwater suction from the qualified storage tank to the alternate sources ensures the capability of the Unit 1 emergency feedwater system to perform its safety function. In accordance with Inspection Manual Chapter 0609, Attachment 4, Initial Characterization of Findings, dated June 19, 2012, the team determined this finding affected the secondary short term heat removal function of the Mitigating Systems Cornerstone. In accordance with Inspection Manual Chapter 0609, Appendix A, The Significance Determination Process (SDP) for Findings At-Power, dated June 19, 2012, Exhibit 2, Mitigating Systems Screening Questions, the finding represented a loss of the emergency feedwater system and function. Therefore, a detailed risk evaluation was necessary. The senior reactor analyst determined that the change in core damage frequency of this finding was 7 x 10-7 per year, therefore the significance was of very low safety significance (Green). This finding did not have a cross-cutting aspect because the performance deficiency did not reflect current licensee performance.
05000313/FIN-2016008-0331 December 2016 23:59:59Arkansas NuclearFailure to Monitor Startup Transformers 1, 2, and 3 Voltage Regulator/Tap Changer FunctionGreen. The team identified a Green finding for the failure to meet the surveillance standards of IEEE 308-1971, Criteria for Class 1E Electric Systems for Nuclear Power Generating Stations, Section 5.2.3, Preferred Power Supply. Specifically, from 2001 to December 2, 2016, the licensee failed to monitor the operation of the voltage regulator/load tap changer functions on startup transformers 1, 2, and 3. In response to this issue, the licensee provided reasonable assurance that the voltage regulator/load tap changer was operating properly based on review of plant computer voltage plot data following an Arkansas Nuclear One, Unit 1 trip that occurred on December 14, 2015. This finding was entered into the licensees corrective action program as Condition Reports CR-ANO-C-2016-4777, CR-ANO-C-2016-4879, and CR-ANO-C-2016-5015. The team determined that the failure to monitor startup transformers 1, 2, and 3 voltage regulator/load tap changers to the extent that they are shown to be ready to perform their intended function, in accordance with IEEE Standard 308-1971, was a performance deficiency. The finding was determined to be more than minor because it was associated with the equipment performance attribute of the Mitigating Systems Cornerstone and affected the cornerstone objective of ensuring the availability, reliability, and capability of mitigating systems to respond to initiating events to prevent undesirable consequences. Specifically, the failure to monitor the adequacy of the voltage supplied from startup transformers 1, 2, and 3 voltage regulator/load tap changer did not ensure that offsite power would be available to perform its necessary functions to provide power to the safety-related mitigation equipment. In accordance with Inspection Manual Chapter 0609, Appendix A, The Significance Determination Process (SDP) for Findings At-Power, dated June 19, 2012, Exhibit 2, Mitigating Systems Screening Questions, the issue screened as having very low safety significance (Green) because it was a design or qualification deficiency that did not represent a loss of operability or functionality; did not represent an actual loss of safety function of the system or train; did not result in the loss of one or more trains of non-technical specification equipment; and did not screen as potentially risk-significant due to seismic, flooding, or severe weather. This finding did not have a cross-cutting aspect because the performance deficiency did not reflect current licensee performance.
05000368/FIN-2016011-0131 December 2016 23:59:59Arkansas NuclearFailure to Ensure Adequate Lubication for Emergency Diesel Generator BearingThe inspectors reviewed a self-revealing finding that was preliminarily determined to have low to moderate safety significance (White) for the failure to perform maintenance activities in a manner that ensured adequate lubrication to Unit 2 emergency diesel generator A. This finding involved a violation of Technical Specification 6.4.1.a, because the licensee failed to provide adequate work instructions for maintenance on the inboard generator bearing oil sight glass to ensure that the scribe mark indicated the minimum acceptable oil level to ensure adequate lubrication to the bearing. As a result, the licensee reinstalled the sight glass with the oil level scribe mark below the bottom of the bearing rollers. Subsequently, on June 22, 2016, the oil was drained and replaced with oil level close to the sight glass scribe mark, and the bearing failed on September 16, 2016, during a 24-hour surveillance. The licensee entered this issue into the corrective action program as Condition Report CR-ANO-2-2016-03307. The licensee resolved the safety concern by repairing the bearing, successfully testing the diesel, and verifying the condition did not exist in any other safety-related equipment. The failure to ensure adequate lubrication to the inboard generator bearing so that the Unit 2 emergency diesel generator A would be capable of performing its safety functions for the intended mission time is a performance deficiency. This performance deficiency is more than minor, and therefore is a finding, because it is associated with the procedure quality attribute of the mitigating systems cornerstone, and adversely affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the licensee failed to properly pre-plan and perform work that could affect this safety-related system in accordance with written procedures, documented instructions, or drawings appropriate to the circumstances such that the minimum bearing oil level was correctly marked and maintained. This performance deficiency subsequently affected the availability and reliability of the emergency diesel generator, a mitigating system. The inspectors evaluated the finding with NRC Manual Chapter 0609, Appendix A, The Significance Determination Process (SDP) for Findings At-Power, dated June 19, 2012, Exhibit 2, Mitigating Systems Screening Questions. The inspectors determined that the finding required a detailed risk evaluation because an actual loss of function of a single train of mitigating equipment occurred for greater than its technical specification allowed outage time. As determined by a Significance and Enforcement Review Panel (SERP), the total increase in core damage frequency for the performance deficiency was preliminarily estimated to be between 3.0E-6 per year and 9.6E-6 per year, or of low to moderate safety significance. The inspectors determined this finding has a cross-cutting aspect in the human performance area of Work Management, because the primary cause of the performance deficiency involved the failure to plan, control, and execute work activities such that nuclear safety is the overriding priority (H.5).
05000313/FIN-2016008-0131 December 2016 23:59:59Arkansas NuclearFailure to Verify the Adequacy of Motor Operated Valve Thermal Overload DevicesGreen. The team identified a Green non-cited violation of 10 CFR Part 50, Appendix B, Criterion III, Design Control, which states, in part, design control measures shall provide for verifying or checking the adequacy of design, such as by the performance of design reviews, by the use of alternate or simplified calculational methods, or by the performance of a suitable testing program. Specifically, prior to December 2, 2016, the licensee failed to use appropriate assumptions in thermal overload device calculations and failed to establish a suitable periodic test program for safety-related Unit 1 motor operated valve thermal overload device trip setpoints, as discussed in Regulatory Guide 1.106, Regulatory Position C.2. In response to this issue, the licensee demonstrated reasonable assurance of operability by using the results of the 18-month high pressure injection system valve testing which required multiple stroking of block valves to obtain various flows without tripping the thermal overload devices. This finding was entered into the licensees corrective action program as Condition Reports CR-ANO-C-2016-5017 and CR-ANO-1-2016-5130. The team determined that the failure to meet the intent of Regulatory Guide 1.106, Regulatory Position C.2 was a performance deficiency. The finding was determined to be more than minor because it was associated with the Mitigating Systems Cornerstone attribute of equipment performance and affected the cornerstone objective of ensuring the availability, reliability, and capability of mitigating systems to respond to initiating events to prevent undesirable consequences. Specifically, the failure to verify the adequacy of the design and perform suitable testing for thermal overload device setpoint drift did not ensure that the safety-related motor operated valves would be available to throttle the associated system flows during a design basis accident. In accordance with Inspection Manual Chapter 0609, Appendix A, The Significance Determination Process (SDP) for Findings At-Power, dated June 19, 2012, Exhibit 2, Mitigating Systems Screening Questions, the issue screened as having very low safety significance (Green) because it was a design or qualification deficiency that did not represent a loss of operability or functionality; did not represent an actual loss of safety function of the system or train; did not result in the loss of one or more trains of non-technical specification equipment; and did not screen as potentially risk-significant due to seismic, flooding, or severe weather. This finding had a cross-cutting aspect in the area of problem identification and resolution associated with evaluations because the licensee failed to thoroughly evaluate issues to ensure that resolutions address causes and extent of conditions commensurate with their safety significance. Specifically, the licensee failed to thoroughly evaluate Condition Report CR-ANO-1-2016-0778 which documented NRC inspector concerns associated with design and testing of motor operated valve thermal overload devices (P.2).
05000313/FIN-2016008-0531 December 2016 23:59:59Arkansas NuclearFailure to Ensure Safety Systems Would Survive Sustained Degraded Voltage ConditionsGreen. The team identified a Green non-cited violation of 10 CFR Part 50, Appendix B, Criterion III, Design Control, which states, in part, design control measures shall provide for verifying or checking the adequacy of design, such as by the performance of design reviews, by the use of alternate or simplified calculational methods, or by the performance of a suitable testing program. Specifically, from December 17, 1979, to December 2, 2016, the licensee did not verify that the design of the protective devices for the loads required at the beginning of a loss-of-coolant accident were adequate to prevent tripping these devices under degraded voltage conditions, which would render the affected loads non-functional. In response to this issue, the licensee performed a preliminary analysis to determine that the protective overload devices would not cause safety equipment to fail at degraded voltages allowed by technical specifications. This finding was entered into the licensees corrective action program as Condition Reports CR-ANO-C-2016-5027 and CR-ANO-C-2016-5191. The team determined that the failure to ensure that safety-related electrical components would not fail during the allowable time duration of a degraded voltage condition (in accordance with NRC Multi-Plant Action B-23, Position 1.C) was a performance deficiency. The finding was determined to be more than minor because it was associated with the design control attribute of the Mitigating Systems Cornerstone and adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of mitigating systems to respond to initiating events to prevent undesirable consequences. Specifically, the failure to ensure that the protective devices for the loads required at the beginning of a Loss of Control Accident would not fail under degraded voltage conditions did not ensure that these loads would be available to perform their mitigating functions. In accordance with Inspection Manual Chapter 0609, Appendix A, The Significance Determination Process (SDP) for Findings At-Power, dated June 19, 2012, Exhibit 2, Mitigating Systems Screening Questions, the issue screened as having very low safety significance (Green) because it was a design or qualification deficiency that did not represent a loss of operability or functionality; did not represent an actual loss of safety function of the system or train; did not result in the loss of one or more trains of non-technical specification equipment; and did not screen as potentially risk-significant due to seismic, flooding, or severe weather. The team determined that this finding did not have a cross-cutting aspect because the most significant contributor did not reflect current licensee performance.
05000313/FIN-2016404-0131 December 2016 23:59:59Arkansas NuclearSecurity
05000313/FIN-2016004-0131 December 2016 23:59:59Arkansas NuclearFailure to Pre-plan Walkdown to Avoid Impacting Safety BusGreen. The inspectors documented a self-revealed finding and associated non-cited violation of Unit 1 Technical Specification 5.4.1.a, for the failure to properly pre-plan and perform a pre-modification walkdown in the Unit 1 train A safety-related switchgear room so that the walkdown would not adversely affect the performance of train. As a result, licensee personnel inadvertently de-energized the A3 switchgear and associated ac buses, which resulted in the loss of one train of spent fuel pool cooling. Operators restored spent fuel pool cooling, the licensee evaluated the human error and performed a training stand-down to ensure pre-job walkdowns did not impact plant equipment. The licensee entered this issue into the corrective action program as Condition Report CR-ANO-1-2016-04356. The failure to perform a plant walkdown in a manner that did not impact safety-related switchgear is a performance deficiency. The performance deficiency is more than minor because it adversely affected the human performance attribute of the barrier integrity cornerstone and adversely affected the cornerstone objective to provide reasonable assurance that physical design barriers protect the public from radionuclide releases caused by accidents or events. Specifically, de-energizing the safety-related switchgear resulted in the loss of one train of spent fuel pool cooling and an increase in risk level from Green to Yellow. The inspectors evaluated the finding with NRC Manual Chapter 0609, Appendix A, The Significance Determination Process (SDP) for Findings At-Power, dated June 19, 2012, Exhibit 3, Barrier Integrity Screening Questions, because the appendix provides the most applicable guidance, regardless of whether the unit was at-power or shutdown. The inspectors determined that the finding screened as having very low safety significance (Green) because the finding did not cause the spent fuel pool to exceed the maximum analyzed temperature, did not damage fuel cladding, did not result in a loss pool water inventory below the minimum analyzed level, and did not affect the pool neutron absorber or soluble boron concentration. The inspectors determined this finding has a cross-cutting aspect in the human performance area of Avoid Complacency, because the primary cause of the performance deficiency involved the failure to plan for the possibility of mistakes and use appropriate error reduction tools. (H.12)