 QuarterSiteTitleTopic
05000483/FIN-2018002-032018Q2CallawayFailure to Critique an Inaccurate Emergency Classification During a Simulator Training Scenario
05000382/FIN-2017403-012017Q4WaterfordSecurity
05000458/FIN-2016404-042016Q4River BendSecurity
05000498/FIN-2016002-012016Q2South TexasInadequate Scaffold Procedure to Ensure Safety-Related Equipment Not ImpactedSignificance Determination Process
Maintenance Rule Program
Scaffolding
05000368/FIN-2016007-102016Q1Arkansas NuclearFailure to Develop an Operability Decision-Making Issue for Degraded Condition on Safety Injection TankSignificance Determination Process
05000313/FIN-2016007-022016Q1Arkansas NuclearInadequate Effectiveness Reviews for Corrective Actions to Prevent RecurrenceCondition Adverse to Quality
Significance Determination Process
05000416/FIN-2015007-102015Q4Grand GulfFailure to Ensure Equipment Operability and Functionality of Allowable Alternating Current Frequency RangeSignificance Determination Process
05000397/FIN-2014004-012014Q3ColumbiaFailure to Comply with Ultimate Heat Sink Technical Specification Level RequirementsUltimate heat sink
Large early release frequency
05000528/FIN-2012005-012012Q4Palo VerdeFailure to Identify and Correct a Condition Adverse to Fire ProtectionSafe Shutdown
Significance Determination Process
Fire Protection Program
05000498/FIN-2012404-012012Q2South TexasSecurity
05000482/FIN-2012201-032012Q2Wolf CreekSecurity
05000275/FIN-2012403-012012Q1Diablo CanyonSecurity
05000382/FIN-2011007-082011Q4WaterfordFailure to Adequately Manage the Risk Involved with a Maintenance Window for the Turbine Driven Essential Feedwater PumpProbabilistic Risk Assessment
Significance Determination Process
05000397/FIN-2011004-052011Q3ColumbiaFailure to Ensure Main Steam Isolation Valve Setpoint Change is AdequateSignificance Determination Process
05000275/FIN-2010005-072010Q4Diablo CanyonInadequate Quality Verification Audits
05000275/FIN-2010201-032010Q3Diablo CanyonSecurity
05000397/FIN-2010003-012010Q2ColumbiaFailure to Translate Appropriate Acceptance Criteria
05000382/FIN-2009009-022009Q3WaterfordFailure to Establish Proper Design Control Measures to Assure Adequate Design and to Properly Translate the Design Into Test ProceduresSignificance Determination Process
05000382/FIN-2009009-042009Q3WaterfordFailure to Properly Analyze the Affect of Acceptable Reverse Flow Through the Emergency Feedwater Check Valves
05000416/FIN-2009006-032009Q2Grand GulfMotor-Operated Valve Calculations Used Non-Conservative Inputs and MethodologiesSignificance Determination Process
05000416/FIN-2009006-052009Q2Grand GulfTwo Examples of a Failure to Meet 10 CFR Part 50, Appendix B, Criterion XI, Test ControlSignificance Determination Process
05000254/FIN-2008007-022008Q4Quad CitiesInadeequate Calculations/Analyses and Testing for Thermal Overload Relays (TOLs) on Safety-Related MOVs.