Quarter | Site | Title | Topic | |
---|---|---|---|---|
05000483/FIN-2018002-03 | 2018Q2 | Callaway | Failure to Critique an Inaccurate Emergency Classification During a Simulator Training Scenario | |
05000382/FIN-2017403-01 | 2017Q4 | Waterford | Security | |
05000458/FIN-2016404-04 | 2016Q4 | River Bend | Security | |
05000498/FIN-2016002-01 | 2016Q2 | South Texas | Inadequate Scaffold Procedure to Ensure Safety-Related Equipment Not Impacted | Significance Determination Process Maintenance Rule Program Scaffolding |
05000368/FIN-2016007-10 | 2016Q1 | Arkansas Nuclear | Failure to Develop an Operability Decision-Making Issue for Degraded Condition on Safety Injection Tank | Significance Determination Process |
05000313/FIN-2016007-02 | 2016Q1 | Arkansas Nuclear | Inadequate Effectiveness Reviews for Corrective Actions to Prevent Recurrence | Condition Adverse to Quality Significance Determination Process |
05000416/FIN-2015007-10 | 2015Q4 | Grand Gulf | Failure to Ensure Equipment Operability and Functionality of Allowable Alternating Current Frequency Range | Significance Determination Process |
05000397/FIN-2014004-01 | 2014Q3 | Columbia | Failure to Comply with Ultimate Heat Sink Technical Specification Level Requirements | Ultimate heat sink Large early release frequency |
05000528/FIN-2012005-01 | 2012Q4 | Palo Verde | Failure to Identify and Correct a Condition Adverse to Fire Protection | Safe Shutdown Significance Determination Process Fire Protection Program |
05000498/FIN-2012404-01 | 2012Q2 | South Texas | Security | |
05000482/FIN-2012201-03 | 2012Q2 | Wolf Creek | Security | |
05000275/FIN-2012403-01 | 2012Q1 | Diablo Canyon | Security | |
05000382/FIN-2011007-08 | 2011Q4 | Waterford | Failure to Adequately Manage the Risk Involved with a Maintenance Window for the Turbine Driven Essential Feedwater Pump | Probabilistic Risk Assessment Significance Determination Process |
05000397/FIN-2011004-05 | 2011Q3 | Columbia | Failure to Ensure Main Steam Isolation Valve Setpoint Change is Adequate | Significance Determination Process |
05000275/FIN-2010005-07 | 2010Q4 | Diablo Canyon | Inadequate Quality Verification Audits | |
05000275/FIN-2010201-03 | 2010Q3 | Diablo Canyon | Security | |
05000397/FIN-2010003-01 | 2010Q2 | Columbia | Failure to Translate Appropriate Acceptance Criteria | |
05000382/FIN-2009009-02 | 2009Q3 | Waterford | Failure to Establish Proper Design Control Measures to Assure Adequate Design and to Properly Translate the Design Into Test Procedures | Significance Determination Process |
05000382/FIN-2009009-04 | 2009Q3 | Waterford | Failure to Properly Analyze the Affect of Acceptable Reverse Flow Through the Emergency Feedwater Check Valves | |
05000416/FIN-2009006-03 | 2009Q2 | Grand Gulf | Motor-Operated Valve Calculations Used Non-Conservative Inputs and Methodologies | Significance Determination Process |
05000416/FIN-2009006-05 | 2009Q2 | Grand Gulf | Two Examples of a Failure to Meet 10 CFR Part 50, Appendix B, Criterion XI, Test Control | Significance Determination Process |
05000254/FIN-2008007-02 | 2008Q4 | Quad Cities | Inadeequate Calculations/Analyses and Testing for Thermal Overload Relays (TOLs) on Safety-Related MOVs. |